Selecting suitable procurement system for steel building construction

PurposeThe purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.Design/methodology/approachAn abductive research stance is followed...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Built Environment Project and Asset Management 2021-10, Vol.11 (4), p.611-626
Hauptverfasser: Perera, G.P.P.S., Tennakoon, T.M.M.P., Kulatunga, Udayangani, Jayasena, Himal Suranga, Wijewickrama, M.K.C.S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 626
container_issue 4
container_start_page 611
container_title Built Environment Project and Asset Management
container_volume 11
creator Perera, G.P.P.S.
Tennakoon, T.M.M.P.
Kulatunga, Udayangani
Jayasena, Himal Suranga
Wijewickrama, M.K.C.S.
description PurposeThe purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.Design/methodology/approachAn abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index.FindingsThe critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Management-oriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context.Research limitations/implicationsThe study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka.Practical implicationsThe systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement.Originality/valueA study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.
doi_str_mv 10.1108/BEPAM-03-2020-0056
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2583778545</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2583778545</sourcerecordid><originalsourceid>FETCH-LOGICAL-c317t-6efc0f7bd87dccb0801df5b49f7fda1390d9158fd2356916e66400c2c161ef4c3</originalsourceid><addsrcrecordid>eNo9kMtKw0AUhgdRsNS-gKuA69Ez10yWtUQrVBRUcDckc5GUXOrMZNG3N7Hi6vyL79w-hK4J3BIC6u6-fF0_Y2CYAgUMIOQZWlDgHBMq1Pl_5p-XaBXjHgAISMU5X6DyzbXOpKb_yuLYpKpuXXYIgxmD61yfsniMyXWZH0I2Bddm9di0dsbN0McUxql36K_Qha_a6FZ_dYk-Hsr3zRbvXh6fNusdNozkCUvnDfi8tiq3xtSggFgval743NuKsAJsQYTyljIhCyKdlBzAUEMkcZ4btkQ3p7nTid-ji0nvhzH000o9fcryXAkuJoqeKBOGGIPz-hCargpHTUDPxvSvMQ1Mz8b0bIz9ADRqX18</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2583778545</pqid></control><display><type>article</type><title>Selecting suitable procurement system for steel building construction</title><source>Emerald Journals</source><source>Standard: Emerald eJournal Premier Collection</source><creator>Perera, G.P.P.S. ; Tennakoon, T.M.M.P. ; Kulatunga, Udayangani ; Jayasena, Himal Suranga ; Wijewickrama, M.K.C.S.</creator><creatorcontrib>Perera, G.P.P.S. ; Tennakoon, T.M.M.P. ; Kulatunga, Udayangani ; Jayasena, Himal Suranga ; Wijewickrama, M.K.C.S.</creatorcontrib><description>PurposeThe purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.Design/methodology/approachAn abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index.FindingsThe critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Management-oriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context.Research limitations/implicationsThe study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka.Practical implicationsThe systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement.Originality/valueA study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.</description><identifier>ISSN: 2044-124X</identifier><identifier>EISSN: 2044-1258</identifier><identifier>DOI: 10.1108/BEPAM-03-2020-0056</identifier><language>eng</language><publisher>Bingley: Emerald Group Publishing Limited</publisher><subject>Building construction ; Buildings ; Construction ; Construction industry ; Empirical analysis ; Literature reviews ; Methods ; Priority rating ; Procurement management ; Statistical analysis ; Steel ; Steel construction</subject><ispartof>Built Environment Project and Asset Management, 2021-10, Vol.11 (4), p.611-626</ispartof><rights>Emerald Publishing Limited 2020</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c317t-6efc0f7bd87dccb0801df5b49f7fda1390d9158fd2356916e66400c2c161ef4c3</citedby><cites>FETCH-LOGICAL-c317t-6efc0f7bd87dccb0801df5b49f7fda1390d9158fd2356916e66400c2c161ef4c3</cites><orcidid>0000-0001-8847-948X</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,961,21674,27901,27902</link.rule.ids></links><search><creatorcontrib>Perera, G.P.P.S.</creatorcontrib><creatorcontrib>Tennakoon, T.M.M.P.</creatorcontrib><creatorcontrib>Kulatunga, Udayangani</creatorcontrib><creatorcontrib>Jayasena, Himal Suranga</creatorcontrib><creatorcontrib>Wijewickrama, M.K.C.S.</creatorcontrib><title>Selecting suitable procurement system for steel building construction</title><title>Built Environment Project and Asset Management</title><description>PurposeThe purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.Design/methodology/approachAn abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index.FindingsThe critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Management-oriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context.Research limitations/implicationsThe study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka.Practical implicationsThe systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement.Originality/valueA study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.</description><subject>Building construction</subject><subject>Buildings</subject><subject>Construction</subject><subject>Construction industry</subject><subject>Empirical analysis</subject><subject>Literature reviews</subject><subject>Methods</subject><subject>Priority rating</subject><subject>Procurement management</subject><subject>Statistical analysis</subject><subject>Steel</subject><subject>Steel construction</subject><issn>2044-124X</issn><issn>2044-1258</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><sourceid>BENPR</sourceid><sourceid>GUQSH</sourceid><sourceid>M2O</sourceid><recordid>eNo9kMtKw0AUhgdRsNS-gKuA69Ez10yWtUQrVBRUcDckc5GUXOrMZNG3N7Hi6vyL79w-hK4J3BIC6u6-fF0_Y2CYAgUMIOQZWlDgHBMq1Pl_5p-XaBXjHgAISMU5X6DyzbXOpKb_yuLYpKpuXXYIgxmD61yfsniMyXWZH0I2Bddm9di0dsbN0McUxql36K_Qha_a6FZ_dYk-Hsr3zRbvXh6fNusdNozkCUvnDfi8tiq3xtSggFgval743NuKsAJsQYTyljIhCyKdlBzAUEMkcZ4btkQ3p7nTid-ji0nvhzH000o9fcryXAkuJoqeKBOGGIPz-hCargpHTUDPxvSvMQ1Mz8b0bIz9ADRqX18</recordid><startdate>20211021</startdate><enddate>20211021</enddate><creator>Perera, G.P.P.S.</creator><creator>Tennakoon, T.M.M.P.</creator><creator>Kulatunga, Udayangani</creator><creator>Jayasena, Himal Suranga</creator><creator>Wijewickrama, M.K.C.S.</creator><general>Emerald Group Publishing Limited</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7WY</scope><scope>7WZ</scope><scope>7XB</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>AEUYN</scope><scope>AFKRA</scope><scope>ATCPS</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>BGLVJ</scope><scope>BHPHI</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FR3</scope><scope>F~G</scope><scope>GNUQQ</scope><scope>GUQSH</scope><scope>HCIFZ</scope><scope>K6~</scope><scope>KR7</scope><scope>L.-</scope><scope>L6V</scope><scope>M0C</scope><scope>M2O</scope><scope>M7S</scope><scope>MBDVC</scope><scope>PATMY</scope><scope>PHGZM</scope><scope>PHGZT</scope><scope>PKEHL</scope><scope>PQBIZ</scope><scope>PQEST</scope><scope>PQGLB</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>PYCSY</scope><scope>Q9U</scope><orcidid>https://orcid.org/0000-0001-8847-948X</orcidid></search><sort><creationdate>20211021</creationdate><title>Selecting suitable procurement system for steel building construction</title><author>Perera, G.P.P.S. ; Tennakoon, T.M.M.P. ; Kulatunga, Udayangani ; Jayasena, Himal Suranga ; Wijewickrama, M.K.C.S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c317t-6efc0f7bd87dccb0801df5b49f7fda1390d9158fd2356916e66400c2c161ef4c3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Building construction</topic><topic>Buildings</topic><topic>Construction</topic><topic>Construction industry</topic><topic>Empirical analysis</topic><topic>Literature reviews</topic><topic>Methods</topic><topic>Priority rating</topic><topic>Procurement management</topic><topic>Statistical analysis</topic><topic>Steel</topic><topic>Steel construction</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Perera, G.P.P.S.</creatorcontrib><creatorcontrib>Tennakoon, T.M.M.P.</creatorcontrib><creatorcontrib>Kulatunga, Udayangani</creatorcontrib><creatorcontrib>Jayasena, Himal Suranga</creatorcontrib><creatorcontrib>Wijewickrama, M.K.C.S.</creatorcontrib><collection>CrossRef</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Global (PDF only)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest One Sustainability</collection><collection>ProQuest Central UK/Ireland</collection><collection>Agricultural &amp; Environmental Science Collection</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Business Premium Collection</collection><collection>Technology Collection</collection><collection>Natural Science Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>Engineering Research Database</collection><collection>ABI/INFORM Global (Corporate)</collection><collection>ProQuest Central Student</collection><collection>Research Library Prep</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Business Collection</collection><collection>Civil Engineering Abstracts</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ProQuest Engineering Collection</collection><collection>ABI/INFORM Global</collection><collection>Research Library</collection><collection>Engineering Database</collection><collection>Research Library (Corporate)</collection><collection>Environmental Science Database</collection><collection>ProQuest Central (New)</collection><collection>ProQuest One Academic (New)</collection><collection>ProQuest One Academic Middle East (New)</collection><collection>ProQuest One Business</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Applied &amp; Life Sciences</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering Collection</collection><collection>Environmental Science Collection</collection><collection>ProQuest Central Basic</collection><jtitle>Built Environment Project and Asset Management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Perera, G.P.P.S.</au><au>Tennakoon, T.M.M.P.</au><au>Kulatunga, Udayangani</au><au>Jayasena, Himal Suranga</au><au>Wijewickrama, M.K.C.S.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Selecting suitable procurement system for steel building construction</atitle><jtitle>Built Environment Project and Asset Management</jtitle><date>2021-10-21</date><risdate>2021</risdate><volume>11</volume><issue>4</issue><spage>611</spage><epage>626</epage><pages>611-626</pages><issn>2044-124X</issn><eissn>2044-1258</eissn><abstract>PurposeThe purpose of this paper is to select a suitable procurement method for steel building construction in Sri Lanka following a systematic method which weigh, both procurement selection factors and existing procurement systems.Design/methodology/approachAn abductive research stance is followed in this empirical study. Procurement selection factors were selected through a critical literature review which was followed by a quantitative questionnaire survey. The collected data were analysed using descriptive statistical analysis and relative important index.FindingsThe critical literature review outlined 46 procurement selection factors, out of which 26 factors were very important in steel building procurement selection. Short construction period and higher constructability of design are ranked at the top with the highest priority rating factors. Management-oriented procurement system was selected as the most appropriate procurement system for steel building constructions within the Sri Lankan context.Research limitations/implicationsThe study is limited to widely use three procurement systems in Sri Lankan construction industry. Yet, the process followed in selecting the most appropriate procurement system could be applied for other contexts. The implications of the study are mainly identifying management-oriented procurement as the most suitable procurement method for steel building construction in Sri Lanka.Practical implicationsThe systematic procedure of procurement method selection for steel building construction may use in the Sri Lankan construction industry to limit the resource loss due to wrong selection of procurement.Originality/valueA study which critically and comprehensively presenting a procurement selection process for steel building construction is not recorded in Sri Lanka prior to this study.</abstract><cop>Bingley</cop><pub>Emerald Group Publishing Limited</pub><doi>10.1108/BEPAM-03-2020-0056</doi><tpages>16</tpages><orcidid>https://orcid.org/0000-0001-8847-948X</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 2044-124X
ispartof Built Environment Project and Asset Management, 2021-10, Vol.11 (4), p.611-626
issn 2044-124X
2044-1258
language eng
recordid cdi_proquest_journals_2583778545
source Emerald Journals; Standard: Emerald eJournal Premier Collection
subjects Building construction
Buildings
Construction
Construction industry
Empirical analysis
Literature reviews
Methods
Priority rating
Procurement management
Statistical analysis
Steel
Steel construction
title Selecting suitable procurement system for steel building construction
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-21T15%3A29%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Selecting%20suitable%20procurement%20system%20for%20steel%20building%20construction&rft.jtitle=Built%20Environment%20Project%20and%20Asset%20Management&rft.au=Perera,%20G.P.P.S.&rft.date=2021-10-21&rft.volume=11&rft.issue=4&rft.spage=611&rft.epage=626&rft.pages=611-626&rft.issn=2044-124X&rft.eissn=2044-1258&rft_id=info:doi/10.1108/BEPAM-03-2020-0056&rft_dat=%3Cproquest_cross%3E2583778545%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2583778545&rft_id=info:pmid/&rfr_iscdi=true