Seismic Design of ITER Component Cooling Water System-1 Piping

The successful performance of ITER machine very much depends upon the effective removal of heat from the in-vessel components and other auxiliary systems during Tokamak operation. This objective will be accomplished by the design of an effective Cooling Water System (CWS). The optimized piping layou...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of physics. Conference series 2017-04, Vol.823 (1), p.12017
Hauptverfasser: Singh, Aditya P, Jadhav, Mahesh, Sharma, Lalit K, Gupta, Dinesh K, Patel, Nirav, Ranjan, Rakesh, Gohil, Guman, Patel, Hiren, Dangi, Jinendra, Kumar, Mohit, Kumar, A G A
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!