In-vessel components for initial operation of JT-60SA
Minimum sets of in-vessel components were installed for initial operation of JT-60SA in order to product and control the plasma and to know the plasma basic information, including inboard first wall, upper divertor, protection limiter, glow electrodes and magnetic sensors. All of magnetic sensors we...
Gespeichert in:
Veröffentlicht in: | Fusion engineering and design 2021-07, Vol.168, p.112572, Article 112572 |
---|---|
Hauptverfasser: | , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | 112572 |
container_title | Fusion engineering and design |
container_volume | 168 |
creator | Takechi, M. Tsuru, D. Fukumoto, M. Sasajima, T. Matsunaga, G. Nakamura, S. Yamamoto, S. Itashiki, Y. Hayashi, T. Isayama, A. |
description | Minimum sets of in-vessel components were installed for initial operation of JT-60SA in order to product and control the plasma and to know the plasma basic information, including inboard first wall, upper divertor, protection limiter, glow electrodes and magnetic sensors. All of magnetic sensors were installed within the required accuracy with in-situ measurement with laser tracker. The inboard first wall and the upper divertor were installed for the limiter configuration at the plasma initiation and the divertor configuration, respectively. They have carbon tiles as the first wall, which must be installed with accuracy of ±1 mm in order to avoid the heat concentration. However, the vacuum-vessel wall had some deformation. Therefore, we measured in advance with laser tracker the position of the vacuum vessel where the bases of the inboard first wall and upper divertor would be welded. By using these position data and 3D CAD, we customized all bases. Owing to these procedures, we could install the first wall with required accuracy. Also, all other components were installed with required accuracy. |
doi_str_mv | 10.1016/j.fusengdes.2021.112572 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2552120175</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0920379621003483</els_id><sourcerecordid>2552120175</sourcerecordid><originalsourceid>FETCH-LOGICAL-c387t-19fe09498b41cf90efd85711c4902f8ccb8c2297ffa67f0d94c721b9cfde4143</originalsourceid><addsrcrecordid>eNqFkEtLxDAUhYMoWEd_gwXXqbnpI81yGHyMDLhw9qGT3khKJ6lJO-C_t0PFrXDhbM45l_MRcg8sAwbVY5eZKaL7bDFmnHHIAHgp-AVJoBY5FSCrS5IwyRnNhayuyU2MHWMg5ktIuXX0hDFin2p_HLxDN8bU-JBaZ0fb9KkfMDSj9S71Jn3b04p9rG_JlWn6iHe_uiL756f95pXu3l-2m_WO6rwWIwVpkMlC1ocCtJEMTVuXAkAXknFTa32oNedSGNNUwrBWFlpwOEhtWiygyFfkYakdgv-aMI6q81Nw80fFy5IDnyeUs0ssLh18jAGNGoI9NuFbAVNnRKpTf4jUGZFaEM3J9ZLEecPJYlBRW3QaWxtQj6r19t-OH0qHckg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2552120175</pqid></control><display><type>article</type><title>In-vessel components for initial operation of JT-60SA</title><source>Elsevier ScienceDirect Journals</source><creator>Takechi, M. ; Tsuru, D. ; Fukumoto, M. ; Sasajima, T. ; Matsunaga, G. ; Nakamura, S. ; Yamamoto, S. ; Itashiki, Y. ; Hayashi, T. ; Isayama, A.</creator><creatorcontrib>Takechi, M. ; Tsuru, D. ; Fukumoto, M. ; Sasajima, T. ; Matsunaga, G. ; Nakamura, S. ; Yamamoto, S. ; Itashiki, Y. ; Hayashi, T. ; Isayama, A.</creatorcontrib><description>Minimum sets of in-vessel components were installed for initial operation of JT-60SA in order to product and control the plasma and to know the plasma basic information, including inboard first wall, upper divertor, protection limiter, glow electrodes and magnetic sensors. All of magnetic sensors were installed within the required accuracy with in-situ measurement with laser tracker. The inboard first wall and the upper divertor were installed for the limiter configuration at the plasma initiation and the divertor configuration, respectively. They have carbon tiles as the first wall, which must be installed with accuracy of ±1 mm in order to avoid the heat concentration. However, the vacuum-vessel wall had some deformation. Therefore, we measured in advance with laser tracker the position of the vacuum vessel where the bases of the inboard first wall and upper divertor would be welded. By using these position data and 3D CAD, we customized all bases. Owing to these procedures, we could install the first wall with required accuracy. Also, all other components were installed with required accuracy.</description><identifier>ISSN: 0920-3796</identifier><identifier>EISSN: 1873-7196</identifier><identifier>DOI: 10.1016/j.fusengdes.2021.112572</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Accuracy ; Configurations ; Divertor ; First wall ; In-vessel components ; JT-60SA ; Laser beam welding ; Laser tracker ; Magnetic sensor ; Position measurement ; Sensors ; Vessels</subject><ispartof>Fusion engineering and design, 2021-07, Vol.168, p.112572, Article 112572</ispartof><rights>2021 Elsevier B.V.</rights><rights>Copyright Elsevier Science Ltd. Jul 2021</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c387t-19fe09498b41cf90efd85711c4902f8ccb8c2297ffa67f0d94c721b9cfde4143</citedby><cites>FETCH-LOGICAL-c387t-19fe09498b41cf90efd85711c4902f8ccb8c2297ffa67f0d94c721b9cfde4143</cites><orcidid>0000-0002-1697-0699</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0920379621003483$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27901,27902,65306</link.rule.ids></links><search><creatorcontrib>Takechi, M.</creatorcontrib><creatorcontrib>Tsuru, D.</creatorcontrib><creatorcontrib>Fukumoto, M.</creatorcontrib><creatorcontrib>Sasajima, T.</creatorcontrib><creatorcontrib>Matsunaga, G.</creatorcontrib><creatorcontrib>Nakamura, S.</creatorcontrib><creatorcontrib>Yamamoto, S.</creatorcontrib><creatorcontrib>Itashiki, Y.</creatorcontrib><creatorcontrib>Hayashi, T.</creatorcontrib><creatorcontrib>Isayama, A.</creatorcontrib><title>In-vessel components for initial operation of JT-60SA</title><title>Fusion engineering and design</title><description>Minimum sets of in-vessel components were installed for initial operation of JT-60SA in order to product and control the plasma and to know the plasma basic information, including inboard first wall, upper divertor, protection limiter, glow electrodes and magnetic sensors. All of magnetic sensors were installed within the required accuracy with in-situ measurement with laser tracker. The inboard first wall and the upper divertor were installed for the limiter configuration at the plasma initiation and the divertor configuration, respectively. They have carbon tiles as the first wall, which must be installed with accuracy of ±1 mm in order to avoid the heat concentration. However, the vacuum-vessel wall had some deformation. Therefore, we measured in advance with laser tracker the position of the vacuum vessel where the bases of the inboard first wall and upper divertor would be welded. By using these position data and 3D CAD, we customized all bases. Owing to these procedures, we could install the first wall with required accuracy. Also, all other components were installed with required accuracy.</description><subject>Accuracy</subject><subject>Configurations</subject><subject>Divertor</subject><subject>First wall</subject><subject>In-vessel components</subject><subject>JT-60SA</subject><subject>Laser beam welding</subject><subject>Laser tracker</subject><subject>Magnetic sensor</subject><subject>Position measurement</subject><subject>Sensors</subject><subject>Vessels</subject><issn>0920-3796</issn><issn>1873-7196</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNqFkEtLxDAUhYMoWEd_gwXXqbnpI81yGHyMDLhw9qGT3khKJ6lJO-C_t0PFrXDhbM45l_MRcg8sAwbVY5eZKaL7bDFmnHHIAHgp-AVJoBY5FSCrS5IwyRnNhayuyU2MHWMg5ktIuXX0hDFin2p_HLxDN8bU-JBaZ0fb9KkfMDSj9S71Jn3b04p9rG_JlWn6iHe_uiL756f95pXu3l-2m_WO6rwWIwVpkMlC1ocCtJEMTVuXAkAXknFTa32oNedSGNNUwrBWFlpwOEhtWiygyFfkYakdgv-aMI6q81Nw80fFy5IDnyeUs0ssLh18jAGNGoI9NuFbAVNnRKpTf4jUGZFaEM3J9ZLEecPJYlBRW3QaWxtQj6r19t-OH0qHckg</recordid><startdate>202107</startdate><enddate>202107</enddate><creator>Takechi, M.</creator><creator>Tsuru, D.</creator><creator>Fukumoto, M.</creator><creator>Sasajima, T.</creator><creator>Matsunaga, G.</creator><creator>Nakamura, S.</creator><creator>Yamamoto, S.</creator><creator>Itashiki, Y.</creator><creator>Hayashi, T.</creator><creator>Isayama, A.</creator><general>Elsevier B.V</general><general>Elsevier Science Ltd</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>H8D</scope><scope>KR7</scope><scope>L7M</scope><orcidid>https://orcid.org/0000-0002-1697-0699</orcidid></search><sort><creationdate>202107</creationdate><title>In-vessel components for initial operation of JT-60SA</title><author>Takechi, M. ; Tsuru, D. ; Fukumoto, M. ; Sasajima, T. ; Matsunaga, G. ; Nakamura, S. ; Yamamoto, S. ; Itashiki, Y. ; Hayashi, T. ; Isayama, A.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c387t-19fe09498b41cf90efd85711c4902f8ccb8c2297ffa67f0d94c721b9cfde4143</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Accuracy</topic><topic>Configurations</topic><topic>Divertor</topic><topic>First wall</topic><topic>In-vessel components</topic><topic>JT-60SA</topic><topic>Laser beam welding</topic><topic>Laser tracker</topic><topic>Magnetic sensor</topic><topic>Position measurement</topic><topic>Sensors</topic><topic>Vessels</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Takechi, M.</creatorcontrib><creatorcontrib>Tsuru, D.</creatorcontrib><creatorcontrib>Fukumoto, M.</creatorcontrib><creatorcontrib>Sasajima, T.</creatorcontrib><creatorcontrib>Matsunaga, G.</creatorcontrib><creatorcontrib>Nakamura, S.</creatorcontrib><creatorcontrib>Yamamoto, S.</creatorcontrib><creatorcontrib>Itashiki, Y.</creatorcontrib><creatorcontrib>Hayashi, T.</creatorcontrib><creatorcontrib>Isayama, A.</creatorcontrib><collection>CrossRef</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Aerospace Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>Fusion engineering and design</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Takechi, M.</au><au>Tsuru, D.</au><au>Fukumoto, M.</au><au>Sasajima, T.</au><au>Matsunaga, G.</au><au>Nakamura, S.</au><au>Yamamoto, S.</au><au>Itashiki, Y.</au><au>Hayashi, T.</au><au>Isayama, A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>In-vessel components for initial operation of JT-60SA</atitle><jtitle>Fusion engineering and design</jtitle><date>2021-07</date><risdate>2021</risdate><volume>168</volume><spage>112572</spage><pages>112572-</pages><artnum>112572</artnum><issn>0920-3796</issn><eissn>1873-7196</eissn><abstract>Minimum sets of in-vessel components were installed for initial operation of JT-60SA in order to product and control the plasma and to know the plasma basic information, including inboard first wall, upper divertor, protection limiter, glow electrodes and magnetic sensors. All of magnetic sensors were installed within the required accuracy with in-situ measurement with laser tracker. The inboard first wall and the upper divertor were installed for the limiter configuration at the plasma initiation and the divertor configuration, respectively. They have carbon tiles as the first wall, which must be installed with accuracy of ±1 mm in order to avoid the heat concentration. However, the vacuum-vessel wall had some deformation. Therefore, we measured in advance with laser tracker the position of the vacuum vessel where the bases of the inboard first wall and upper divertor would be welded. By using these position data and 3D CAD, we customized all bases. Owing to these procedures, we could install the first wall with required accuracy. Also, all other components were installed with required accuracy.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/j.fusengdes.2021.112572</doi><orcidid>https://orcid.org/0000-0002-1697-0699</orcidid></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0920-3796 |
ispartof | Fusion engineering and design, 2021-07, Vol.168, p.112572, Article 112572 |
issn | 0920-3796 1873-7196 |
language | eng |
recordid | cdi_proquest_journals_2552120175 |
source | Elsevier ScienceDirect Journals |
subjects | Accuracy Configurations Divertor First wall In-vessel components JT-60SA Laser beam welding Laser tracker Magnetic sensor Position measurement Sensors Vessels |
title | In-vessel components for initial operation of JT-60SA |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-13T02%3A46%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=In-vessel%20components%20for%20initial%20operation%20of%20JT-60SA&rft.jtitle=Fusion%20engineering%20and%20design&rft.au=Takechi,%20M.&rft.date=2021-07&rft.volume=168&rft.spage=112572&rft.pages=112572-&rft.artnum=112572&rft.issn=0920-3796&rft.eissn=1873-7196&rft_id=info:doi/10.1016/j.fusengdes.2021.112572&rft_dat=%3Cproquest_cross%3E2552120175%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2552120175&rft_id=info:pmid/&rft_els_id=S0920379621003483&rfr_iscdi=true |