A two-scale maintenance policy for protection systems subject to shocks when meeting demands

•Activations of a protection system for meeting demands may act as shocks.•A shock may result in an increase in the failure rate of the system.•We propose a new maintenance policy for protection systems: the KMT policy.•KMT policy is based on two scales: 1. time (system age), 2. number of met demand...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Reliability engineering & system safety 2020-12, Vol.204, p.107118, Article 107118
Hauptverfasser: Alberti, Alexandre R., Cavalcante, Cristiano A.V.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page 107118
container_title Reliability engineering & system safety
container_volume 204
creator Alberti, Alexandre R.
Cavalcante, Cristiano A.V.
description •Activations of a protection system for meeting demands may act as shocks.•A shock may result in an increase in the failure rate of the system.•We propose a new maintenance policy for protection systems: the KMT policy.•KMT policy is based on two scales: 1. time (system age), 2. number of met demands.•The two-scale based policy outperforms the corresponding one-scale based policies. We propose a model for a two-scale hybrid inspection and preventive replacement policy for protection systems subject to shocks due to meeting demands. The policy guides periodic inspections and also considers both the age of the system and the number of demands met as parameters for decision-making on preventive replacement. We considered a non-repairable single-component protection system that is subject to demands that arrive according to a Homogeneous Poisson Process. The activation of the system on demand acts as a shock that increases the failure rate of the system with a given probability. We also considered that inspections are imperfect: they may result in false positives and false negatives. We evaluated the performance of the policy in terms of the cost-rate and rate of unmet demands. Our numerical analysis shows the strategic role of inspections and demonstrates the following: 1. The greater the effect of shocks the more beneficial is the two-scale policy relative to a one-scale policy; 2. The proposed policy performs well when the rate of demands varies over time. These findings are important to practice because they show that maintenance policies for protection systems should be less time based and more use based.
doi_str_mv 10.1016/j.ress.2020.107118
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2506646904</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0951832020306190</els_id><sourcerecordid>2506646904</sourcerecordid><originalsourceid>FETCH-LOGICAL-c328t-4684f23d96c18446fe9acaa5713a780cfb452dd7066a150c1a6858ea99ca8bd53</originalsourceid><addsrcrecordid>eNp9kE1LxDAQhoMouK7-AU8Bz12TNk1T8LIsfsGCF70JIZtO3dRts2ayyv57U-rZ08DL-8wMDyHXnC044_K2WwRAXOQsH4OKc3VCZlxVdcZUIU_JjNUlz1SRs3NygdgxxkRdVjPyvqTxx2dozQ5ob9wQYTCDBbr3O2ePtPWB7oOPYKPzA8UjRuiR4mHTpYhGT3Hr7SfSny0MtAeIbvigDfRmaPCSnLVmh3D1N-fk7eH-dfWUrV8en1fLdWaLXMVMSCXavGhqabkSQrZQG2tMWfHCVIrZdiPKvGkqJqXhJbPcSFUqMHVtjdo0ZTEnN9Pe9OnXATDqzh_CkE7qvEyUkDUTqZVPLRs8YoBW74PrTThqzvRoUXd6tKhHi3qymKC7CYL0_7eDoNE6SIIaF5IA3Xj3H_4LHfN8Cg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2506646904</pqid></control><display><type>article</type><title>A two-scale maintenance policy for protection systems subject to shocks when meeting demands</title><source>Elsevier ScienceDirect Journals Complete</source><creator>Alberti, Alexandre R. ; Cavalcante, Cristiano A.V.</creator><creatorcontrib>Alberti, Alexandre R. ; Cavalcante, Cristiano A.V.</creatorcontrib><description>•Activations of a protection system for meeting demands may act as shocks.•A shock may result in an increase in the failure rate of the system.•We propose a new maintenance policy for protection systems: the KMT policy.•KMT policy is based on two scales: 1. time (system age), 2. number of met demands.•The two-scale based policy outperforms the corresponding one-scale based policies. We propose a model for a two-scale hybrid inspection and preventive replacement policy for protection systems subject to shocks due to meeting demands. The policy guides periodic inspections and also considers both the age of the system and the number of demands met as parameters for decision-making on preventive replacement. We considered a non-repairable single-component protection system that is subject to demands that arrive according to a Homogeneous Poisson Process. The activation of the system on demand acts as a shock that increases the failure rate of the system with a given probability. We also considered that inspections are imperfect: they may result in false positives and false negatives. We evaluated the performance of the policy in terms of the cost-rate and rate of unmet demands. Our numerical analysis shows the strategic role of inspections and demonstrates the following: 1. The greater the effect of shocks the more beneficial is the two-scale policy relative to a one-scale policy; 2. The proposed policy performs well when the rate of demands varies over time. These findings are important to practice because they show that maintenance policies for protection systems should be less time based and more use based.</description><identifier>ISSN: 0951-8320</identifier><identifier>EISSN: 1879-0836</identifier><identifier>DOI: 10.1016/j.ress.2020.107118</identifier><language>eng</language><publisher>Barking: Elsevier Ltd</publisher><subject>Cost analysis ; Decision making ; Failure rate ; Failure rates ; Imperfect inspection ; Inspection ; Inspections ; Maintenance ; Numerical analysis ; Protection system ; Protection systems ; Reliability engineering ; Shocks ; Statistical analysis</subject><ispartof>Reliability engineering &amp; system safety, 2020-12, Vol.204, p.107118, Article 107118</ispartof><rights>2020 Elsevier Ltd</rights><rights>Copyright Elsevier BV Dec 2020</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c328t-4684f23d96c18446fe9acaa5713a780cfb452dd7066a150c1a6858ea99ca8bd53</citedby><cites>FETCH-LOGICAL-c328t-4684f23d96c18446fe9acaa5713a780cfb452dd7066a150c1a6858ea99ca8bd53</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.ress.2020.107118$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,780,784,3550,27924,27925,45995</link.rule.ids></links><search><creatorcontrib>Alberti, Alexandre R.</creatorcontrib><creatorcontrib>Cavalcante, Cristiano A.V.</creatorcontrib><title>A two-scale maintenance policy for protection systems subject to shocks when meeting demands</title><title>Reliability engineering &amp; system safety</title><description>•Activations of a protection system for meeting demands may act as shocks.•A shock may result in an increase in the failure rate of the system.•We propose a new maintenance policy for protection systems: the KMT policy.•KMT policy is based on two scales: 1. time (system age), 2. number of met demands.•The two-scale based policy outperforms the corresponding one-scale based policies. We propose a model for a two-scale hybrid inspection and preventive replacement policy for protection systems subject to shocks due to meeting demands. The policy guides periodic inspections and also considers both the age of the system and the number of demands met as parameters for decision-making on preventive replacement. We considered a non-repairable single-component protection system that is subject to demands that arrive according to a Homogeneous Poisson Process. The activation of the system on demand acts as a shock that increases the failure rate of the system with a given probability. We also considered that inspections are imperfect: they may result in false positives and false negatives. We evaluated the performance of the policy in terms of the cost-rate and rate of unmet demands. Our numerical analysis shows the strategic role of inspections and demonstrates the following: 1. The greater the effect of shocks the more beneficial is the two-scale policy relative to a one-scale policy; 2. The proposed policy performs well when the rate of demands varies over time. These findings are important to practice because they show that maintenance policies for protection systems should be less time based and more use based.</description><subject>Cost analysis</subject><subject>Decision making</subject><subject>Failure rate</subject><subject>Failure rates</subject><subject>Imperfect inspection</subject><subject>Inspection</subject><subject>Inspections</subject><subject>Maintenance</subject><subject>Numerical analysis</subject><subject>Protection system</subject><subject>Protection systems</subject><subject>Reliability engineering</subject><subject>Shocks</subject><subject>Statistical analysis</subject><issn>0951-8320</issn><issn>1879-0836</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><recordid>eNp9kE1LxDAQhoMouK7-AU8Bz12TNk1T8LIsfsGCF70JIZtO3dRts2ayyv57U-rZ08DL-8wMDyHXnC044_K2WwRAXOQsH4OKc3VCZlxVdcZUIU_JjNUlz1SRs3NygdgxxkRdVjPyvqTxx2dozQ5ob9wQYTCDBbr3O2ePtPWB7oOPYKPzA8UjRuiR4mHTpYhGT3Hr7SfSny0MtAeIbvigDfRmaPCSnLVmh3D1N-fk7eH-dfWUrV8en1fLdWaLXMVMSCXavGhqabkSQrZQG2tMWfHCVIrZdiPKvGkqJqXhJbPcSFUqMHVtjdo0ZTEnN9Pe9OnXATDqzh_CkE7qvEyUkDUTqZVPLRs8YoBW74PrTThqzvRoUXd6tKhHi3qymKC7CYL0_7eDoNE6SIIaF5IA3Xj3H_4LHfN8Cg</recordid><startdate>202012</startdate><enddate>202012</enddate><creator>Alberti, Alexandre R.</creator><creator>Cavalcante, Cristiano A.V.</creator><general>Elsevier Ltd</general><general>Elsevier BV</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7ST</scope><scope>7TB</scope><scope>8FD</scope><scope>C1K</scope><scope>FR3</scope><scope>SOI</scope></search><sort><creationdate>202012</creationdate><title>A two-scale maintenance policy for protection systems subject to shocks when meeting demands</title><author>Alberti, Alexandre R. ; Cavalcante, Cristiano A.V.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c328t-4684f23d96c18446fe9acaa5713a780cfb452dd7066a150c1a6858ea99ca8bd53</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><topic>Cost analysis</topic><topic>Decision making</topic><topic>Failure rate</topic><topic>Failure rates</topic><topic>Imperfect inspection</topic><topic>Inspection</topic><topic>Inspections</topic><topic>Maintenance</topic><topic>Numerical analysis</topic><topic>Protection system</topic><topic>Protection systems</topic><topic>Reliability engineering</topic><topic>Shocks</topic><topic>Statistical analysis</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Alberti, Alexandre R.</creatorcontrib><creatorcontrib>Cavalcante, Cristiano A.V.</creatorcontrib><collection>CrossRef</collection><collection>Environment Abstracts</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Environmental Sciences and Pollution Management</collection><collection>Engineering Research Database</collection><collection>Environment Abstracts</collection><jtitle>Reliability engineering &amp; system safety</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Alberti, Alexandre R.</au><au>Cavalcante, Cristiano A.V.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A two-scale maintenance policy for protection systems subject to shocks when meeting demands</atitle><jtitle>Reliability engineering &amp; system safety</jtitle><date>2020-12</date><risdate>2020</risdate><volume>204</volume><spage>107118</spage><pages>107118-</pages><artnum>107118</artnum><issn>0951-8320</issn><eissn>1879-0836</eissn><abstract>•Activations of a protection system for meeting demands may act as shocks.•A shock may result in an increase in the failure rate of the system.•We propose a new maintenance policy for protection systems: the KMT policy.•KMT policy is based on two scales: 1. time (system age), 2. number of met demands.•The two-scale based policy outperforms the corresponding one-scale based policies. We propose a model for a two-scale hybrid inspection and preventive replacement policy for protection systems subject to shocks due to meeting demands. The policy guides periodic inspections and also considers both the age of the system and the number of demands met as parameters for decision-making on preventive replacement. We considered a non-repairable single-component protection system that is subject to demands that arrive according to a Homogeneous Poisson Process. The activation of the system on demand acts as a shock that increases the failure rate of the system with a given probability. We also considered that inspections are imperfect: they may result in false positives and false negatives. We evaluated the performance of the policy in terms of the cost-rate and rate of unmet demands. Our numerical analysis shows the strategic role of inspections and demonstrates the following: 1. The greater the effect of shocks the more beneficial is the two-scale policy relative to a one-scale policy; 2. The proposed policy performs well when the rate of demands varies over time. These findings are important to practice because they show that maintenance policies for protection systems should be less time based and more use based.</abstract><cop>Barking</cop><pub>Elsevier Ltd</pub><doi>10.1016/j.ress.2020.107118</doi></addata></record>
fulltext fulltext
identifier ISSN: 0951-8320
ispartof Reliability engineering & system safety, 2020-12, Vol.204, p.107118, Article 107118
issn 0951-8320
1879-0836
language eng
recordid cdi_proquest_journals_2506646904
source Elsevier ScienceDirect Journals Complete
subjects Cost analysis
Decision making
Failure rate
Failure rates
Imperfect inspection
Inspection
Inspections
Maintenance
Numerical analysis
Protection system
Protection systems
Reliability engineering
Shocks
Statistical analysis
title A two-scale maintenance policy for protection systems subject to shocks when meeting demands
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T07%3A55%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20two-scale%20maintenance%20policy%20for%20protection%20systems%20subject%20to%20shocks%20when%20meeting%20demands&rft.jtitle=Reliability%20engineering%20&%20system%20safety&rft.au=Alberti,%20Alexandre%20R.&rft.date=2020-12&rft.volume=204&rft.spage=107118&rft.pages=107118-&rft.artnum=107118&rft.issn=0951-8320&rft.eissn=1879-0836&rft_id=info:doi/10.1016/j.ress.2020.107118&rft_dat=%3Cproquest_cross%3E2506646904%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2506646904&rft_id=info:pmid/&rft_els_id=S0951832020306190&rfr_iscdi=true