Multi-objective two-stage adaptive robust planning method for an integrated energy system considering load uncertainty

•Build the load uncertainty model of incorporating the annual load growth rate.•Integrate the grid integration level into multi-objective optimization.•Propose the multi-objective two-stage adaptive robust planning method.•Implement the planning method into an industrial park.•Analyze the influence...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energy and buildings 2021-03, Vol.235, p.110741, Article 110741
Hauptverfasser: Yan, Rujing, Wang, Jiangjiang, Lu, Shuaikang, Ma, Zherui, Zhou, Yuan, Zhang, Lidong, Cheng, Youliang
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page 110741
container_title Energy and buildings
container_volume 235
creator Yan, Rujing
Wang, Jiangjiang
Lu, Shuaikang
Ma, Zherui
Zhou, Yuan
Zhang, Lidong
Cheng, Youliang
description •Build the load uncertainty model of incorporating the annual load growth rate.•Integrate the grid integration level into multi-objective optimization.•Propose the multi-objective two-stage adaptive robust planning method.•Implement the planning method into an industrial park.•Analyze the influence of quantitative parameters on the evaluation indicator. An integrated energy system (IES) is considered as an effective approach to reduce carbon emissions, lower energy supply costs and increase system flexibility. As numerous energy conversion and storage devices with various features have been developed, determining their types and capacity size and optimizing the synergic action of all selected energy devices under load uncertainty have become challenging issues during the planning and designing of a new IES. To address these issues, a load uncertainty model is constructed by integrating the regional equivalent standard building-integrated load prediction method, the robust uncertainty set method and the fuzzy C-means clustering algorithm. Based on this uncertainty model, this paper proposes a planning method that incorporates the fuzzy multi-objective decision and two-stage adaptive robust optimization methods for handling these challenging issues. The multi-objective decision method enables comprehensive optimization based on the system's economic performance, carbon emissions and grid integration level. The two-stage adaptive robust optimization method aims to optimize the single-objective problem transformed by the multi-objective decision method. The planning method is implemented in an industrial park in the Baoding City of China. The influence of load budget uncertainty, annual load growth rate and energy purchase price is then investigated. The results show that the load budget uncertainty and annual load growth rate only affect the optimal capacity size of the selected devices, whereas the energy purchase price influences both the optimal device types and their capacity size. The optimal capacity size remains constant when the load budget uncertainty exceeds 3. This study provides a methodology to select the suitable device types and determine their capacity size for IES under load uncertainty, which will benefit the design of a new IES.
doi_str_mv 10.1016/j.enbuild.2021.110741
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2503172351</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0378778821000256</els_id><sourcerecordid>2503172351</sourcerecordid><originalsourceid>FETCH-LOGICAL-c337t-36f8b432a3bf83262f669927494e7a10bd852489ad53f347692f0fabba867e453</originalsourceid><addsrcrecordid>eNqFkE1r4zAQhsXShU2z-xMWBD071YctyadSSr8gpZf2LGRrlJVxpFSSU_Lv12ly72lgeJ93mAehv5SsKKHielhB6CY_2hUjjK4oJbKmP9CCKskqQaW6QAvCpaqkVOoXusx5IISIRtIF2r9MY_FV7Aboi98DLp-xysVsABtrdl-rFLspF7wbTQg-bPAWyr9osYsJm4B9KLBJpoDFECBtDjgfcoEt7mPI3kI6ImM0Fk-hh1TMDBx-o5_OjBn-nOcSvT_cv909VevXx-e723XVcy5LxYVTXc2Z4Z1TnAnmhGhbJuu2Bmko6axqWK1aYxvueC1FyxxxpuuMEhLqhi_R1al3l-LHBLnoIU4pzCc1awinkvGGzqnmlOpTzDmB07vktyYdNCX6qFgP-qxYHxXrk-KZuzlxML-w95B07j3MX1qfZp3aRv9Nw38b14lS</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2503172351</pqid></control><display><type>article</type><title>Multi-objective two-stage adaptive robust planning method for an integrated energy system considering load uncertainty</title><source>Elsevier ScienceDirect Journals Complete</source><creator>Yan, Rujing ; Wang, Jiangjiang ; Lu, Shuaikang ; Ma, Zherui ; Zhou, Yuan ; Zhang, Lidong ; Cheng, Youliang</creator><creatorcontrib>Yan, Rujing ; Wang, Jiangjiang ; Lu, Shuaikang ; Ma, Zherui ; Zhou, Yuan ; Zhang, Lidong ; Cheng, Youliang</creatorcontrib><description>•Build the load uncertainty model of incorporating the annual load growth rate.•Integrate the grid integration level into multi-objective optimization.•Propose the multi-objective two-stage adaptive robust planning method.•Implement the planning method into an industrial park.•Analyze the influence of quantitative parameters on the evaluation indicator. An integrated energy system (IES) is considered as an effective approach to reduce carbon emissions, lower energy supply costs and increase system flexibility. As numerous energy conversion and storage devices with various features have been developed, determining their types and capacity size and optimizing the synergic action of all selected energy devices under load uncertainty have become challenging issues during the planning and designing of a new IES. To address these issues, a load uncertainty model is constructed by integrating the regional equivalent standard building-integrated load prediction method, the robust uncertainty set method and the fuzzy C-means clustering algorithm. Based on this uncertainty model, this paper proposes a planning method that incorporates the fuzzy multi-objective decision and two-stage adaptive robust optimization methods for handling these challenging issues. The multi-objective decision method enables comprehensive optimization based on the system's economic performance, carbon emissions and grid integration level. The two-stage adaptive robust optimization method aims to optimize the single-objective problem transformed by the multi-objective decision method. The planning method is implemented in an industrial park in the Baoding City of China. The influence of load budget uncertainty, annual load growth rate and energy purchase price is then investigated. The results show that the load budget uncertainty and annual load growth rate only affect the optimal capacity size of the selected devices, whereas the energy purchase price influences both the optimal device types and their capacity size. The optimal capacity size remains constant when the load budget uncertainty exceeds 3. This study provides a methodology to select the suitable device types and determine their capacity size for IES under load uncertainty, which will benefit the design of a new IES.</description><identifier>ISSN: 0378-7788</identifier><identifier>EISSN: 1872-6178</identifier><identifier>DOI: 10.1016/j.enbuild.2021.110741</identifier><language>eng</language><publisher>Lausanne: Elsevier B.V</publisher><subject>Adaptive systems ; Algorithms ; Budgets ; Carbon ; Clustering ; Emissions ; Energy ; Energy conversion ; Energy costs ; Energy storage ; Grid integration level ; Growth rate ; Industrial parks ; Integrated energy system ; Integrated energy systems ; Load distribution ; Load uncertainty ; Multi-objective decision ; Optimization ; Robustness (mathematics) ; Two-stage robust optimization ; Uncertainty</subject><ispartof>Energy and buildings, 2021-03, Vol.235, p.110741, Article 110741</ispartof><rights>2021 Elsevier B.V.</rights><rights>Copyright Elsevier BV Mar 15, 2021</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c337t-36f8b432a3bf83262f669927494e7a10bd852489ad53f347692f0fabba867e453</citedby><cites>FETCH-LOGICAL-c337t-36f8b432a3bf83262f669927494e7a10bd852489ad53f347692f0fabba867e453</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.enbuild.2021.110741$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,780,784,3550,27924,27925,45995</link.rule.ids></links><search><creatorcontrib>Yan, Rujing</creatorcontrib><creatorcontrib>Wang, Jiangjiang</creatorcontrib><creatorcontrib>Lu, Shuaikang</creatorcontrib><creatorcontrib>Ma, Zherui</creatorcontrib><creatorcontrib>Zhou, Yuan</creatorcontrib><creatorcontrib>Zhang, Lidong</creatorcontrib><creatorcontrib>Cheng, Youliang</creatorcontrib><title>Multi-objective two-stage adaptive robust planning method for an integrated energy system considering load uncertainty</title><title>Energy and buildings</title><description>•Build the load uncertainty model of incorporating the annual load growth rate.•Integrate the grid integration level into multi-objective optimization.•Propose the multi-objective two-stage adaptive robust planning method.•Implement the planning method into an industrial park.•Analyze the influence of quantitative parameters on the evaluation indicator. An integrated energy system (IES) is considered as an effective approach to reduce carbon emissions, lower energy supply costs and increase system flexibility. As numerous energy conversion and storage devices with various features have been developed, determining their types and capacity size and optimizing the synergic action of all selected energy devices under load uncertainty have become challenging issues during the planning and designing of a new IES. To address these issues, a load uncertainty model is constructed by integrating the regional equivalent standard building-integrated load prediction method, the robust uncertainty set method and the fuzzy C-means clustering algorithm. Based on this uncertainty model, this paper proposes a planning method that incorporates the fuzzy multi-objective decision and two-stage adaptive robust optimization methods for handling these challenging issues. The multi-objective decision method enables comprehensive optimization based on the system's economic performance, carbon emissions and grid integration level. The two-stage adaptive robust optimization method aims to optimize the single-objective problem transformed by the multi-objective decision method. The planning method is implemented in an industrial park in the Baoding City of China. The influence of load budget uncertainty, annual load growth rate and energy purchase price is then investigated. The results show that the load budget uncertainty and annual load growth rate only affect the optimal capacity size of the selected devices, whereas the energy purchase price influences both the optimal device types and their capacity size. The optimal capacity size remains constant when the load budget uncertainty exceeds 3. This study provides a methodology to select the suitable device types and determine their capacity size for IES under load uncertainty, which will benefit the design of a new IES.</description><subject>Adaptive systems</subject><subject>Algorithms</subject><subject>Budgets</subject><subject>Carbon</subject><subject>Clustering</subject><subject>Emissions</subject><subject>Energy</subject><subject>Energy conversion</subject><subject>Energy costs</subject><subject>Energy storage</subject><subject>Grid integration level</subject><subject>Growth rate</subject><subject>Industrial parks</subject><subject>Integrated energy system</subject><subject>Integrated energy systems</subject><subject>Load distribution</subject><subject>Load uncertainty</subject><subject>Multi-objective decision</subject><subject>Optimization</subject><subject>Robustness (mathematics)</subject><subject>Two-stage robust optimization</subject><subject>Uncertainty</subject><issn>0378-7788</issn><issn>1872-6178</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNqFkE1r4zAQhsXShU2z-xMWBD071YctyadSSr8gpZf2LGRrlJVxpFSSU_Lv12ly72lgeJ93mAehv5SsKKHielhB6CY_2hUjjK4oJbKmP9CCKskqQaW6QAvCpaqkVOoXusx5IISIRtIF2r9MY_FV7Aboi98DLp-xysVsABtrdl-rFLspF7wbTQg-bPAWyr9osYsJm4B9KLBJpoDFECBtDjgfcoEt7mPI3kI6ImM0Fk-hh1TMDBx-o5_OjBn-nOcSvT_cv909VevXx-e723XVcy5LxYVTXc2Z4Z1TnAnmhGhbJuu2Bmko6axqWK1aYxvueC1FyxxxpuuMEhLqhi_R1al3l-LHBLnoIU4pzCc1awinkvGGzqnmlOpTzDmB07vktyYdNCX6qFgP-qxYHxXrk-KZuzlxML-w95B07j3MX1qfZp3aRv9Nw38b14lS</recordid><startdate>20210315</startdate><enddate>20210315</enddate><creator>Yan, Rujing</creator><creator>Wang, Jiangjiang</creator><creator>Lu, Shuaikang</creator><creator>Ma, Zherui</creator><creator>Zhou, Yuan</creator><creator>Zhang, Lidong</creator><creator>Cheng, Youliang</creator><general>Elsevier B.V</general><general>Elsevier BV</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7ST</scope><scope>8FD</scope><scope>C1K</scope><scope>F28</scope><scope>FR3</scope><scope>KR7</scope><scope>SOI</scope></search><sort><creationdate>20210315</creationdate><title>Multi-objective two-stage adaptive robust planning method for an integrated energy system considering load uncertainty</title><author>Yan, Rujing ; Wang, Jiangjiang ; Lu, Shuaikang ; Ma, Zherui ; Zhou, Yuan ; Zhang, Lidong ; Cheng, Youliang</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c337t-36f8b432a3bf83262f669927494e7a10bd852489ad53f347692f0fabba867e453</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Adaptive systems</topic><topic>Algorithms</topic><topic>Budgets</topic><topic>Carbon</topic><topic>Clustering</topic><topic>Emissions</topic><topic>Energy</topic><topic>Energy conversion</topic><topic>Energy costs</topic><topic>Energy storage</topic><topic>Grid integration level</topic><topic>Growth rate</topic><topic>Industrial parks</topic><topic>Integrated energy system</topic><topic>Integrated energy systems</topic><topic>Load distribution</topic><topic>Load uncertainty</topic><topic>Multi-objective decision</topic><topic>Optimization</topic><topic>Robustness (mathematics)</topic><topic>Two-stage robust optimization</topic><topic>Uncertainty</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Yan, Rujing</creatorcontrib><creatorcontrib>Wang, Jiangjiang</creatorcontrib><creatorcontrib>Lu, Shuaikang</creatorcontrib><creatorcontrib>Ma, Zherui</creatorcontrib><creatorcontrib>Zhou, Yuan</creatorcontrib><creatorcontrib>Zhang, Lidong</creatorcontrib><creatorcontrib>Cheng, Youliang</creatorcontrib><collection>CrossRef</collection><collection>Environment Abstracts</collection><collection>Technology Research Database</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ANTE: Abstracts in New Technology &amp; Engineering</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Environment Abstracts</collection><jtitle>Energy and buildings</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Yan, Rujing</au><au>Wang, Jiangjiang</au><au>Lu, Shuaikang</au><au>Ma, Zherui</au><au>Zhou, Yuan</au><au>Zhang, Lidong</au><au>Cheng, Youliang</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Multi-objective two-stage adaptive robust planning method for an integrated energy system considering load uncertainty</atitle><jtitle>Energy and buildings</jtitle><date>2021-03-15</date><risdate>2021</risdate><volume>235</volume><spage>110741</spage><pages>110741-</pages><artnum>110741</artnum><issn>0378-7788</issn><eissn>1872-6178</eissn><abstract>•Build the load uncertainty model of incorporating the annual load growth rate.•Integrate the grid integration level into multi-objective optimization.•Propose the multi-objective two-stage adaptive robust planning method.•Implement the planning method into an industrial park.•Analyze the influence of quantitative parameters on the evaluation indicator. An integrated energy system (IES) is considered as an effective approach to reduce carbon emissions, lower energy supply costs and increase system flexibility. As numerous energy conversion and storage devices with various features have been developed, determining their types and capacity size and optimizing the synergic action of all selected energy devices under load uncertainty have become challenging issues during the planning and designing of a new IES. To address these issues, a load uncertainty model is constructed by integrating the regional equivalent standard building-integrated load prediction method, the robust uncertainty set method and the fuzzy C-means clustering algorithm. Based on this uncertainty model, this paper proposes a planning method that incorporates the fuzzy multi-objective decision and two-stage adaptive robust optimization methods for handling these challenging issues. The multi-objective decision method enables comprehensive optimization based on the system's economic performance, carbon emissions and grid integration level. The two-stage adaptive robust optimization method aims to optimize the single-objective problem transformed by the multi-objective decision method. The planning method is implemented in an industrial park in the Baoding City of China. The influence of load budget uncertainty, annual load growth rate and energy purchase price is then investigated. The results show that the load budget uncertainty and annual load growth rate only affect the optimal capacity size of the selected devices, whereas the energy purchase price influences both the optimal device types and their capacity size. The optimal capacity size remains constant when the load budget uncertainty exceeds 3. This study provides a methodology to select the suitable device types and determine their capacity size for IES under load uncertainty, which will benefit the design of a new IES.</abstract><cop>Lausanne</cop><pub>Elsevier B.V</pub><doi>10.1016/j.enbuild.2021.110741</doi></addata></record>
fulltext fulltext
identifier ISSN: 0378-7788
ispartof Energy and buildings, 2021-03, Vol.235, p.110741, Article 110741
issn 0378-7788
1872-6178
language eng
recordid cdi_proquest_journals_2503172351
source Elsevier ScienceDirect Journals Complete
subjects Adaptive systems
Algorithms
Budgets
Carbon
Clustering
Emissions
Energy
Energy conversion
Energy costs
Energy storage
Grid integration level
Growth rate
Industrial parks
Integrated energy system
Integrated energy systems
Load distribution
Load uncertainty
Multi-objective decision
Optimization
Robustness (mathematics)
Two-stage robust optimization
Uncertainty
title Multi-objective two-stage adaptive robust planning method for an integrated energy system considering load uncertainty
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T03%3A56%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Multi-objective%20two-stage%20adaptive%20robust%20planning%20method%20for%20an%20integrated%20energy%20system%20considering%20load%20uncertainty&rft.jtitle=Energy%20and%20buildings&rft.au=Yan,%20Rujing&rft.date=2021-03-15&rft.volume=235&rft.spage=110741&rft.pages=110741-&rft.artnum=110741&rft.issn=0378-7788&rft.eissn=1872-6178&rft_id=info:doi/10.1016/j.enbuild.2021.110741&rft_dat=%3Cproquest_cross%3E2503172351%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2503172351&rft_id=info:pmid/&rft_els_id=S0378778821000256&rfr_iscdi=true