Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm
At present, the prefabricated construction industry is in a situation of increasing types of prefabricated components and generally high production costs. A hybrid optimization model considering continuity and discreteness for the production of fabricated concrete members is established to minimize...
Gespeichert in:
Veröffentlicht in: | Mathematical problems in engineering 2021, Vol.2021, p.1-11 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!