Production Scheduling Optimization of Prefabricated Building Components Based on DDE Algorithm

At present, the prefabricated construction industry is in a situation of increasing types of prefabricated components and generally high production costs. A hybrid optimization model considering continuity and discreteness for the production of fabricated concrete members is established to minimize...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mathematical problems in engineering 2021, Vol.2021, p.1-11
Hauptverfasser: Chang, Chunguang, Han, Mengyao
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!