Cooperative Scheduling of AGV and ASC in Automation Container Terminal Relay Operation Mode

The key problem of operation optimization for automated container terminal is the coordinated scheduling of automated quay crane (QC), automated guided vehicle (AGV), and automated stacking crane (ASC). In order to solve this problem, this paper proposed a new method to optimize the scheduling of AS...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mathematical problems in engineering 2021, Vol.2021, p.1-18
Hauptverfasser: Zhang, Qinglei, Hu, Weixin, Duan, Jianguo, Qin, Jiyun
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!