Increasing the Power Generation by Raising the Capacity of the Thrust Bearing Oil Cooling System in Hydroelectric Power Plants
Cooling capacity decreases due to faults appearing over time in the thrust bearing oil cooling systems of hydroelectric power plants and cooling process cannot proceed sufficiently. For this reason, while the turbine-generator unit generates energy, the thrust bearing heats up. This temperature prob...
Gespeichert in:
Veröffentlicht in: | Journal of failure analysis and prevention 2020-08, Vol.20 (4), p.1445-1449 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!