Investigation of a Detail for Connecting Precast Columns to Precast Cap Beams Using Ultrahigh-Performance Concrete

AbstractSeveral connection details have been developed for connecting precast cap beams to precast columns in accelerated bridge construction (ABC) applications. Currently, the suggested details involve either reinforcement or penetration of a portion of the precast column inside the cap beam. Such...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of bridge engineering 2020-03, Vol.25 (3)
Hauptverfasser: Shafieifar, Mohamadreza, Farzad, Mahsa, Azizinamini, Atorod
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 3
container_start_page
container_title Journal of bridge engineering
container_volume 25
creator Shafieifar, Mohamadreza
Farzad, Mahsa
Azizinamini, Atorod
description AbstractSeveral connection details have been developed for connecting precast cap beams to precast columns in accelerated bridge construction (ABC) applications. Currently, the suggested details involve either reinforcement or penetration of a portion of the precast column inside the cap beam. Such details present several challenges in the field. To overcome these challenges, a new connection detail was envisioned. In this detail, the cap beam and the column are spliced in the column and joined with a closure joint of ultrahigh-performance concrete (UHPC). The primary goals of this research were to describe the proposed detail and verify its structural performance through an experimental program. The results showed that the detail is applicable in both seismic and nonseismic regions and is capable of achieving adequate levels of ductility. The proposed detail, with the current detail, requires a temporary bracing or shoring tower to support the precast column and pier cap during construction, which may not be favorable for accelerated bridge construction. Additionally, the test specimens in this study do not represent current methods in the construction industry. Further research is needed to evaluate the performance of the proposed detail considering construction means and methods.
doi_str_mv 10.1061/(ASCE)BE.1943-5592.0001523
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2331708423</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2331708423</sourcerecordid><originalsourceid>FETCH-LOGICAL-a365t-a98dc822c0ad078b54c83e2802abc4719573f35537a4ecb4c9cffdac65a228623</originalsourceid><addsrcrecordid>eNp1kEtPwzAQhC0EEqXwHyy4wCHFjzgPbm0IUKkSlaBna-s6barEKbaLxL_HUYGeOO1qNDOr_RC6pmRESULvb8dvRXk3KUc0j3kkRM5GhBAqGD9Bgz_tNOwkiyOSEnaOLpzbBk-c5HyA7NR8aufrNfi6M7irMOBH7aFucNVZXHTGaOVrs8ZzqxU4H6Rm3xqHfXeUYIcnGlqHF663LhpvYVOvN9Fc21DTglG671JWe32JziponL76mUO0eCrfi5do9vo8LcazCHgifAR5tlIZY4rAiqTZUsQq45plhMFSxSnNRcorLgRPIdZqGatcVdUKVCKAsSxhfIhuDr07233sw5Ny2-2tCScl45ymgUiYQ_RwcCnbOWd1JXe2bsF-SUpkz1jKnrGclLLnKXue8odxCCeHMDilj_W_yf-D34-igPc</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2331708423</pqid></control><display><type>article</type><title>Investigation of a Detail for Connecting Precast Columns to Precast Cap Beams Using Ultrahigh-Performance Concrete</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><creator>Shafieifar, Mohamadreza ; Farzad, Mahsa ; Azizinamini, Atorod</creator><creatorcontrib>Shafieifar, Mohamadreza ; Farzad, Mahsa ; Azizinamini, Atorod</creatorcontrib><description>AbstractSeveral connection details have been developed for connecting precast cap beams to precast columns in accelerated bridge construction (ABC) applications. Currently, the suggested details involve either reinforcement or penetration of a portion of the precast column inside the cap beam. Such details present several challenges in the field. To overcome these challenges, a new connection detail was envisioned. In this detail, the cap beam and the column are spliced in the column and joined with a closure joint of ultrahigh-performance concrete (UHPC). The primary goals of this research were to describe the proposed detail and verify its structural performance through an experimental program. The results showed that the detail is applicable in both seismic and nonseismic regions and is capable of achieving adequate levels of ductility. The proposed detail, with the current detail, requires a temporary bracing or shoring tower to support the precast column and pier cap during construction, which may not be favorable for accelerated bridge construction. Additionally, the test specimens in this study do not represent current methods in the construction industry. Further research is needed to evaluate the performance of the proposed detail considering construction means and methods.</description><identifier>ISSN: 1084-0702</identifier><identifier>EISSN: 1943-5592</identifier><identifier>DOI: 10.1061/(ASCE)BE.1943-5592.0001523</identifier><language>eng</language><publisher>New York: American Society of Civil Engineers</publisher><subject>Bridge construction ; Bridges ; Civil engineering ; Columns (structural) ; Concrete ; Connecting ; Construction ; Construction industry ; Construction methods ; Ductility ; Performance evaluation ; Shoring ; Technical Papers ; Ultra high performance concrete</subject><ispartof>Journal of bridge engineering, 2020-03, Vol.25 (3)</ispartof><rights>2020 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a365t-a98dc822c0ad078b54c83e2802abc4719573f35537a4ecb4c9cffdac65a228623</citedby><cites>FETCH-LOGICAL-a365t-a98dc822c0ad078b54c83e2802abc4719573f35537a4ecb4c9cffdac65a228623</cites><orcidid>0000-0001-8855-4590</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)BE.1943-5592.0001523$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)BE.1943-5592.0001523$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,776,780,27901,27902,75936,75944</link.rule.ids></links><search><creatorcontrib>Shafieifar, Mohamadreza</creatorcontrib><creatorcontrib>Farzad, Mahsa</creatorcontrib><creatorcontrib>Azizinamini, Atorod</creatorcontrib><title>Investigation of a Detail for Connecting Precast Columns to Precast Cap Beams Using Ultrahigh-Performance Concrete</title><title>Journal of bridge engineering</title><description>AbstractSeveral connection details have been developed for connecting precast cap beams to precast columns in accelerated bridge construction (ABC) applications. Currently, the suggested details involve either reinforcement or penetration of a portion of the precast column inside the cap beam. Such details present several challenges in the field. To overcome these challenges, a new connection detail was envisioned. In this detail, the cap beam and the column are spliced in the column and joined with a closure joint of ultrahigh-performance concrete (UHPC). The primary goals of this research were to describe the proposed detail and verify its structural performance through an experimental program. The results showed that the detail is applicable in both seismic and nonseismic regions and is capable of achieving adequate levels of ductility. The proposed detail, with the current detail, requires a temporary bracing or shoring tower to support the precast column and pier cap during construction, which may not be favorable for accelerated bridge construction. Additionally, the test specimens in this study do not represent current methods in the construction industry. Further research is needed to evaluate the performance of the proposed detail considering construction means and methods.</description><subject>Bridge construction</subject><subject>Bridges</subject><subject>Civil engineering</subject><subject>Columns (structural)</subject><subject>Concrete</subject><subject>Connecting</subject><subject>Construction</subject><subject>Construction industry</subject><subject>Construction methods</subject><subject>Ductility</subject><subject>Performance evaluation</subject><subject>Shoring</subject><subject>Technical Papers</subject><subject>Ultra high performance concrete</subject><issn>1084-0702</issn><issn>1943-5592</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><recordid>eNp1kEtPwzAQhC0EEqXwHyy4wCHFjzgPbm0IUKkSlaBna-s6barEKbaLxL_HUYGeOO1qNDOr_RC6pmRESULvb8dvRXk3KUc0j3kkRM5GhBAqGD9Bgz_tNOwkiyOSEnaOLpzbBk-c5HyA7NR8aufrNfi6M7irMOBH7aFucNVZXHTGaOVrs8ZzqxU4H6Rm3xqHfXeUYIcnGlqHF663LhpvYVOvN9Fc21DTglG671JWe32JziponL76mUO0eCrfi5do9vo8LcazCHgifAR5tlIZY4rAiqTZUsQq45plhMFSxSnNRcorLgRPIdZqGatcVdUKVCKAsSxhfIhuDr07233sw5Ny2-2tCScl45ymgUiYQ_RwcCnbOWd1JXe2bsF-SUpkz1jKnrGclLLnKXue8odxCCeHMDilj_W_yf-D34-igPc</recordid><startdate>20200301</startdate><enddate>20200301</enddate><creator>Shafieifar, Mohamadreza</creator><creator>Farzad, Mahsa</creator><creator>Azizinamini, Atorod</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7QH</scope><scope>7TN</scope><scope>7UA</scope><scope>8FD</scope><scope>C1K</scope><scope>F1W</scope><scope>FR3</scope><scope>H96</scope><scope>KR7</scope><scope>L.G</scope><orcidid>https://orcid.org/0000-0001-8855-4590</orcidid></search><sort><creationdate>20200301</creationdate><title>Investigation of a Detail for Connecting Precast Columns to Precast Cap Beams Using Ultrahigh-Performance Concrete</title><author>Shafieifar, Mohamadreza ; Farzad, Mahsa ; Azizinamini, Atorod</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a365t-a98dc822c0ad078b54c83e2802abc4719573f35537a4ecb4c9cffdac65a228623</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><topic>Bridge construction</topic><topic>Bridges</topic><topic>Civil engineering</topic><topic>Columns (structural)</topic><topic>Concrete</topic><topic>Connecting</topic><topic>Construction</topic><topic>Construction industry</topic><topic>Construction methods</topic><topic>Ductility</topic><topic>Performance evaluation</topic><topic>Shoring</topic><topic>Technical Papers</topic><topic>Ultra high performance concrete</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Shafieifar, Mohamadreza</creatorcontrib><creatorcontrib>Farzad, Mahsa</creatorcontrib><creatorcontrib>Azizinamini, Atorod</creatorcontrib><collection>CrossRef</collection><collection>Aqualine</collection><collection>Oceanic Abstracts</collection><collection>Water Resources Abstracts</collection><collection>Technology Research Database</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ASFA: Aquatic Sciences and Fisheries Abstracts</collection><collection>Engineering Research Database</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy &amp; Non-Living Resources</collection><collection>Civil Engineering Abstracts</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) Professional</collection><jtitle>Journal of bridge engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Shafieifar, Mohamadreza</au><au>Farzad, Mahsa</au><au>Azizinamini, Atorod</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Investigation of a Detail for Connecting Precast Columns to Precast Cap Beams Using Ultrahigh-Performance Concrete</atitle><jtitle>Journal of bridge engineering</jtitle><date>2020-03-01</date><risdate>2020</risdate><volume>25</volume><issue>3</issue><issn>1084-0702</issn><eissn>1943-5592</eissn><abstract>AbstractSeveral connection details have been developed for connecting precast cap beams to precast columns in accelerated bridge construction (ABC) applications. Currently, the suggested details involve either reinforcement or penetration of a portion of the precast column inside the cap beam. Such details present several challenges in the field. To overcome these challenges, a new connection detail was envisioned. In this detail, the cap beam and the column are spliced in the column and joined with a closure joint of ultrahigh-performance concrete (UHPC). The primary goals of this research were to describe the proposed detail and verify its structural performance through an experimental program. The results showed that the detail is applicable in both seismic and nonseismic regions and is capable of achieving adequate levels of ductility. The proposed detail, with the current detail, requires a temporary bracing or shoring tower to support the precast column and pier cap during construction, which may not be favorable for accelerated bridge construction. Additionally, the test specimens in this study do not represent current methods in the construction industry. Further research is needed to evaluate the performance of the proposed detail considering construction means and methods.</abstract><cop>New York</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)BE.1943-5592.0001523</doi><orcidid>https://orcid.org/0000-0001-8855-4590</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 1084-0702
ispartof Journal of bridge engineering, 2020-03, Vol.25 (3)
issn 1084-0702
1943-5592
language eng
recordid cdi_proquest_journals_2331708423
source American Society of Civil Engineers:NESLI2:Journals:2014
subjects Bridge construction
Bridges
Civil engineering
Columns (structural)
Concrete
Connecting
Construction
Construction industry
Construction methods
Ductility
Performance evaluation
Shoring
Technical Papers
Ultra high performance concrete
title Investigation of a Detail for Connecting Precast Columns to Precast Cap Beams Using Ultrahigh-Performance Concrete
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T09%3A50%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Investigation%20of%20a%20Detail%20for%20Connecting%20Precast%20Columns%20to%20Precast%20Cap%20Beams%20Using%20Ultrahigh-Performance%20Concrete&rft.jtitle=Journal%20of%20bridge%20engineering&rft.au=Shafieifar,%20Mohamadreza&rft.date=2020-03-01&rft.volume=25&rft.issue=3&rft.issn=1084-0702&rft.eissn=1943-5592&rft_id=info:doi/10.1061/(ASCE)BE.1943-5592.0001523&rft_dat=%3Cproquest_cross%3E2331708423%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2331708423&rft_id=info:pmid/&rfr_iscdi=true