Conceptual design of the power supply systems for the Divertor Tokamak Test facility

The Divertor Tokamak Test (DTT) facility will be the link between ITER and DEMO as regards the study of the power exhaust in the divertor structure. In order to accomplish this goal, the Italian DTT will be a complete superconducting tokamak with 45 MW of additional power coupled to the plasma. Acco...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Fusion engineering and design 2019-09, Vol.146, p.937-941
Hauptverfasser: Lampasi, Alessandro, De Santis, Andrea, Minucci, Simone, Starace, Fabio, Zito, Pietro
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!