Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects

AbstractThis article aims to identify design-construction interface problems and their causes in design-build projects to present solutions to resolve these problems. Accordingly, through a qualitative multiple–case study approach in four Iranian design-build projects, 26 problems were identified, s...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 2019-12, Vol.145 (12)
Hauptverfasser: Yeganeh, Azadeh A, Azizi, Mojtaba, Falsafi, Reza
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 12
container_start_page
container_title Journal of construction engineering and management
container_volume 145
creator Yeganeh, Azadeh A
Azizi, Mojtaba
Falsafi, Reza
description AbstractThis article aims to identify design-construction interface problems and their causes in design-build projects to present solutions to resolve these problems. Accordingly, through a qualitative multiple–case study approach in four Iranian design-build projects, 26 problems were identified, some of the most important of which are too much employer interference in design and construction, poor planning and scheduling, and poor decision making by employers. Knowing the causes and their causation, which are related to all project phases, can help practitioners consider them and avoid their unfavorable consequences in future projects, improve the interface integration, and make better decisions that can potentially enhance project performance. In addition, the problems were prioritized to determine the top 10 problems. Eventually, the experts recommended 10 solutions according to the most important causes and two main root causes, including poor public culture and misunderstanding of the design-build term. In conclusion, it is worth bearing in mind that this study opens a new perspective in exploring the root causes of design-construction interface problems.
doi_str_mv 10.1061/(ASCE)CO.1943-7862.0001727
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2305412943</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2305412943</sourcerecordid><originalsourceid>FETCH-LOGICAL-a436t-b32c81c5759bf5d03d162ecac3a44f8d948ea481646df67eed68f65ba43a98003</originalsourceid><addsrcrecordid>eNp1kM9LwzAYhoMoOKf_Q9GLHjqTJk1TbzNOHQwm_rqGNE2kY0tmkh78703Z1JOnD17e5_3gAeAcwQmCFF1fTl_47IovJ6gmOK8YLSYQQlQV1QEY_WaHYAQrjPMaU3IMTkJYpQ6hdTkC78_OxYzLPuiQOZPd6dB92Jw7G6LvVeyczeY2am-k0tmTd81ab0LWpdRL20n7Q9z23bodCiutYjgFR0augz7b3zF4u5-98sd8sXyY8-kilwTTmDe4UAypsirrxpQtxC2ihVZSYUmIYW1NmJaEIUpoa2ildUuZoWWTaFkzCPEYXOx2t9599jpEsXK9t-mlKDAsCSqSg9S62bWUdyF4bcTWdxvpvwSCYvAoxOBR8KUYnInBmdh7TDDdwTIo_Tf_Q_4PfgPjM3cS</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2305412943</pqid></control><display><type>article</type><title>Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><creator>Yeganeh, Azadeh A ; Azizi, Mojtaba ; Falsafi, Reza</creator><creatorcontrib>Yeganeh, Azadeh A ; Azizi, Mojtaba ; Falsafi, Reza</creatorcontrib><description>AbstractThis article aims to identify design-construction interface problems and their causes in design-build projects to present solutions to resolve these problems. Accordingly, through a qualitative multiple–case study approach in four Iranian design-build projects, 26 problems were identified, some of the most important of which are too much employer interference in design and construction, poor planning and scheduling, and poor decision making by employers. Knowing the causes and their causation, which are related to all project phases, can help practitioners consider them and avoid their unfavorable consequences in future projects, improve the interface integration, and make better decisions that can potentially enhance project performance. In addition, the problems were prioritized to determine the top 10 problems. Eventually, the experts recommended 10 solutions according to the most important causes and two main root causes, including poor public culture and misunderstanding of the design-build term. In conclusion, it is worth bearing in mind that this study opens a new perspective in exploring the root causes of design-construction interface problems.</description><identifier>ISSN: 0733-9364</identifier><identifier>EISSN: 1943-7862</identifier><identifier>DOI: 10.1061/(ASCE)CO.1943-7862.0001727</identifier><language>eng</language><publisher>New York: American Society of Civil Engineers</publisher><subject>Case Studies ; Case Study ; Causation ; Construction planning ; Decision making</subject><ispartof>Journal of construction engineering and management, 2019-12, Vol.145 (12)</ispartof><rights>2019 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a436t-b32c81c5759bf5d03d162ecac3a44f8d948ea481646df67eed68f65ba43a98003</citedby><cites>FETCH-LOGICAL-a436t-b32c81c5759bf5d03d162ecac3a44f8d948ea481646df67eed68f65ba43a98003</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)CO.1943-7862.0001727$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0001727$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,776,780,27901,27902,75936,75944</link.rule.ids></links><search><creatorcontrib>Yeganeh, Azadeh A</creatorcontrib><creatorcontrib>Azizi, Mojtaba</creatorcontrib><creatorcontrib>Falsafi, Reza</creatorcontrib><title>Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects</title><title>Journal of construction engineering and management</title><description>AbstractThis article aims to identify design-construction interface problems and their causes in design-build projects to present solutions to resolve these problems. Accordingly, through a qualitative multiple–case study approach in four Iranian design-build projects, 26 problems were identified, some of the most important of which are too much employer interference in design and construction, poor planning and scheduling, and poor decision making by employers. Knowing the causes and their causation, which are related to all project phases, can help practitioners consider them and avoid their unfavorable consequences in future projects, improve the interface integration, and make better decisions that can potentially enhance project performance. In addition, the problems were prioritized to determine the top 10 problems. Eventually, the experts recommended 10 solutions according to the most important causes and two main root causes, including poor public culture and misunderstanding of the design-build term. In conclusion, it is worth bearing in mind that this study opens a new perspective in exploring the root causes of design-construction interface problems.</description><subject>Case Studies</subject><subject>Case Study</subject><subject>Causation</subject><subject>Construction planning</subject><subject>Decision making</subject><issn>0733-9364</issn><issn>1943-7862</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNp1kM9LwzAYhoMoOKf_Q9GLHjqTJk1TbzNOHQwm_rqGNE2kY0tmkh78703Z1JOnD17e5_3gAeAcwQmCFF1fTl_47IovJ6gmOK8YLSYQQlQV1QEY_WaHYAQrjPMaU3IMTkJYpQ6hdTkC78_OxYzLPuiQOZPd6dB92Jw7G6LvVeyczeY2am-k0tmTd81ab0LWpdRL20n7Q9z23bodCiutYjgFR0augz7b3zF4u5-98sd8sXyY8-kilwTTmDe4UAypsirrxpQtxC2ihVZSYUmIYW1NmJaEIUpoa2ildUuZoWWTaFkzCPEYXOx2t9599jpEsXK9t-mlKDAsCSqSg9S62bWUdyF4bcTWdxvpvwSCYvAoxOBR8KUYnInBmdh7TDDdwTIo_Tf_Q_4PfgPjM3cS</recordid><startdate>20191201</startdate><enddate>20191201</enddate><creator>Yeganeh, Azadeh A</creator><creator>Azizi, Mojtaba</creator><creator>Falsafi, Reza</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20191201</creationdate><title>Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects</title><author>Yeganeh, Azadeh A ; Azizi, Mojtaba ; Falsafi, Reza</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a436t-b32c81c5759bf5d03d162ecac3a44f8d948ea481646df67eed68f65ba43a98003</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Case Studies</topic><topic>Case Study</topic><topic>Causation</topic><topic>Construction planning</topic><topic>Decision making</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Yeganeh, Azadeh A</creatorcontrib><creatorcontrib>Azizi, Mojtaba</creatorcontrib><creatorcontrib>Falsafi, Reza</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of construction engineering and management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Yeganeh, Azadeh A</au><au>Azizi, Mojtaba</au><au>Falsafi, Reza</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects</atitle><jtitle>Journal of construction engineering and management</jtitle><date>2019-12-01</date><risdate>2019</risdate><volume>145</volume><issue>12</issue><issn>0733-9364</issn><eissn>1943-7862</eissn><abstract>AbstractThis article aims to identify design-construction interface problems and their causes in design-build projects to present solutions to resolve these problems. Accordingly, through a qualitative multiple–case study approach in four Iranian design-build projects, 26 problems were identified, some of the most important of which are too much employer interference in design and construction, poor planning and scheduling, and poor decision making by employers. Knowing the causes and their causation, which are related to all project phases, can help practitioners consider them and avoid their unfavorable consequences in future projects, improve the interface integration, and make better decisions that can potentially enhance project performance. In addition, the problems were prioritized to determine the top 10 problems. Eventually, the experts recommended 10 solutions according to the most important causes and two main root causes, including poor public culture and misunderstanding of the design-build term. In conclusion, it is worth bearing in mind that this study opens a new perspective in exploring the root causes of design-construction interface problems.</abstract><cop>New York</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)CO.1943-7862.0001727</doi></addata></record>
fulltext fulltext
identifier ISSN: 0733-9364
ispartof Journal of construction engineering and management, 2019-12, Vol.145 (12)
issn 0733-9364
1943-7862
language eng
recordid cdi_proquest_journals_2305412943
source American Society of Civil Engineers:NESLI2:Journals:2014
subjects Case Studies
Case Study
Causation
Construction planning
Decision making
title Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T16%3A23%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Root%20Causes%20of%20Design-Construction%20Interface%20Problems%20in%20Iranian%20Design-Build%20Projects&rft.jtitle=Journal%20of%20construction%20engineering%20and%20management&rft.au=Yeganeh,%20Azadeh%20A&rft.date=2019-12-01&rft.volume=145&rft.issue=12&rft.issn=0733-9364&rft.eissn=1943-7862&rft_id=info:doi/10.1061/(ASCE)CO.1943-7862.0001727&rft_dat=%3Cproquest_cross%3E2305412943%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2305412943&rft_id=info:pmid/&rfr_iscdi=true