Pareto archived simulated annealing for job shop scheduling with multiple objectives
In this paper, the job shop scheduling problem is studied with the objectives of minimizing the makespan and the mean flow time of jobs. The simultaneous consideration of these objectives is the multi-objective optimization problem under study. A metaheuristic procedure based on the simulated anneal...
Gespeichert in:
Veröffentlicht in: | International journal of advanced manufacturing technology 2006-05, Vol.29 (1-2), p.184-196 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!