Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm

Many optimization problems from the manufacturing systems are very complex in nature and quite hard to solve by conventional optimization techniques. The theme of this paper is to generate an active schedules and optimal sequence of job and tool that can meet minimum makespan schedule for the flexib...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of advanced manufacturing technology 2010-10, Vol.50 (9-12), p.1075-1084
Hauptverfasser: Udhayakumar, P., Kumanan, S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 1084
container_issue 9-12
container_start_page 1075
container_title International journal of advanced manufacturing technology
container_volume 50
creator Udhayakumar, P.
Kumanan, S.
description Many optimization problems from the manufacturing systems are very complex in nature and quite hard to solve by conventional optimization techniques. The theme of this paper is to generate an active schedules and optimal sequence of job and tool that can meet minimum makespan schedule for the flexible manufacturing system. It consists of similar work center which is capable of doing many operations. The tools are stored in a common tool magazine that shares with and serves for several work centers to reduce the cost of duplicating tools in each and every work center. This type of manufacturing system is used for a manufacturing environment in which tools are expensive. To achieve the objective, the jobs and tools are sequenced and scheduled. In this work, non-traditional optimization technique such as ant colony optimization (ACO) algorithm are proposed to derive near-optimal solutions which adopt the Extended Giffler and Thompson algorithm for active feasible schedule generation. In this paper, the proposed algorithm is used for solving number of problems taken from the literature. The results available for the various existing algorithms are compared with results obtained by the ACO algorithm. The analysis reveals that ACO algorithm provides better solution with reasonable computational time.
doi_str_mv 10.1007/s00170-010-2583-9
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2262416907</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2262416907</sourcerecordid><originalsourceid>FETCH-LOGICAL-c316t-865b81743029d129f470a9f22568141e0e368caff2a37887bd55ce5fe0bba49c3</originalsourceid><addsrcrecordid>eNp1kEtLxDAUhYMoOI7-AHcB19E82iRdyuALBBfqOqRpMpOhbWqSguOvt7WCK1eXe_nOuZwDwCXB1wRjcZMwJgIjTDCipWSoOgIrUjCGGCblMVhhyiVigstTcJbSfqI54XIF8qv9GG1vfL-Fum9gMjvbjO28Bgf3of655hBa6HuooWvtp69bCzvdj06bPMaZTYeUbQfHtPhkaEIb-gMMQ_ad_9LZh0ndbkP0ededgxOn22QvfucavN_fvW0e0fPLw9Pm9hkZRnhGkpe1JKJgmFYNoZUrBNaVo7TkkhTEYsu4NNo5qpmQUtRNWRpbOovrWheVYWtwtfgOMUwpU1b7MMZ-eqko5bQgvMJioshCmRhSitapIfpOx4MiWM3lqqVcNZWr5nJVNWnooknDnN_GP-f_Rd_xrn3-</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2262416907</pqid></control><display><type>article</type><title>Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm</title><source>SpringerLink Journals - AutoHoldings</source><creator>Udhayakumar, P. ; Kumanan, S.</creator><creatorcontrib>Udhayakumar, P. ; Kumanan, S.</creatorcontrib><description>Many optimization problems from the manufacturing systems are very complex in nature and quite hard to solve by conventional optimization techniques. The theme of this paper is to generate an active schedules and optimal sequence of job and tool that can meet minimum makespan schedule for the flexible manufacturing system. It consists of similar work center which is capable of doing many operations. The tools are stored in a common tool magazine that shares with and serves for several work centers to reduce the cost of duplicating tools in each and every work center. This type of manufacturing system is used for a manufacturing environment in which tools are expensive. To achieve the objective, the jobs and tools are sequenced and scheduled. In this work, non-traditional optimization technique such as ant colony optimization (ACO) algorithm are proposed to derive near-optimal solutions which adopt the Extended Giffler and Thompson algorithm for active feasible schedule generation. In this paper, the proposed algorithm is used for solving number of problems taken from the literature. The results available for the various existing algorithms are compared with results obtained by the ACO algorithm. The analysis reveals that ACO algorithm provides better solution with reasonable computational time.</description><identifier>ISSN: 0268-3768</identifier><identifier>EISSN: 1433-3015</identifier><identifier>DOI: 10.1007/s00170-010-2583-9</identifier><language>eng</language><publisher>London: Springer-Verlag</publisher><subject>Algorithms ; Ant colony optimization ; CAE) and Design ; Computer-Aided Engineering (CAD ; Computing time ; Engineering ; Flexible manufacturing systems ; Industrial and Production Engineering ; Mechanical Engineering ; Media Management ; Optimization techniques ; Original Article ; Schedules ; Sequences</subject><ispartof>International journal of advanced manufacturing technology, 2010-10, Vol.50 (9-12), p.1075-1084</ispartof><rights>Springer-Verlag London Limited 2010</rights><rights>The International Journal of Advanced Manufacturing Technology is a copyright of Springer, (2010). All Rights Reserved.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c316t-865b81743029d129f470a9f22568141e0e368caff2a37887bd55ce5fe0bba49c3</citedby><cites>FETCH-LOGICAL-c316t-865b81743029d129f470a9f22568141e0e368caff2a37887bd55ce5fe0bba49c3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.1007/s00170-010-2583-9$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.1007/s00170-010-2583-9$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,780,784,27923,27924,41487,42556,51318</link.rule.ids></links><search><creatorcontrib>Udhayakumar, P.</creatorcontrib><creatorcontrib>Kumanan, S.</creatorcontrib><title>Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm</title><title>International journal of advanced manufacturing technology</title><addtitle>Int J Adv Manuf Technol</addtitle><description>Many optimization problems from the manufacturing systems are very complex in nature and quite hard to solve by conventional optimization techniques. The theme of this paper is to generate an active schedules and optimal sequence of job and tool that can meet minimum makespan schedule for the flexible manufacturing system. It consists of similar work center which is capable of doing many operations. The tools are stored in a common tool magazine that shares with and serves for several work centers to reduce the cost of duplicating tools in each and every work center. This type of manufacturing system is used for a manufacturing environment in which tools are expensive. To achieve the objective, the jobs and tools are sequenced and scheduled. In this work, non-traditional optimization technique such as ant colony optimization (ACO) algorithm are proposed to derive near-optimal solutions which adopt the Extended Giffler and Thompson algorithm for active feasible schedule generation. In this paper, the proposed algorithm is used for solving number of problems taken from the literature. The results available for the various existing algorithms are compared with results obtained by the ACO algorithm. The analysis reveals that ACO algorithm provides better solution with reasonable computational time.</description><subject>Algorithms</subject><subject>Ant colony optimization</subject><subject>CAE) and Design</subject><subject>Computer-Aided Engineering (CAD</subject><subject>Computing time</subject><subject>Engineering</subject><subject>Flexible manufacturing systems</subject><subject>Industrial and Production Engineering</subject><subject>Mechanical Engineering</subject><subject>Media Management</subject><subject>Optimization techniques</subject><subject>Original Article</subject><subject>Schedules</subject><subject>Sequences</subject><issn>0268-3768</issn><issn>1433-3015</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2010</creationdate><recordtype>article</recordtype><sourceid>AFKRA</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><recordid>eNp1kEtLxDAUhYMoOI7-AHcB19E82iRdyuALBBfqOqRpMpOhbWqSguOvt7WCK1eXe_nOuZwDwCXB1wRjcZMwJgIjTDCipWSoOgIrUjCGGCblMVhhyiVigstTcJbSfqI54XIF8qv9GG1vfL-Fum9gMjvbjO28Bgf3of655hBa6HuooWvtp69bCzvdj06bPMaZTYeUbQfHtPhkaEIb-gMMQ_ad_9LZh0ndbkP0ededgxOn22QvfucavN_fvW0e0fPLw9Pm9hkZRnhGkpe1JKJgmFYNoZUrBNaVo7TkkhTEYsu4NNo5qpmQUtRNWRpbOovrWheVYWtwtfgOMUwpU1b7MMZ-eqko5bQgvMJioshCmRhSitapIfpOx4MiWM3lqqVcNZWr5nJVNWnooknDnN_GP-f_Rd_xrn3-</recordid><startdate>20101001</startdate><enddate>20101001</enddate><creator>Udhayakumar, P.</creator><creator>Kumanan, S.</creator><general>Springer-Verlag</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>AFKRA</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>HCIFZ</scope><scope>L6V</scope><scope>M7S</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope></search><sort><creationdate>20101001</creationdate><title>Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm</title><author>Udhayakumar, P. ; Kumanan, S.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c316t-865b81743029d129f470a9f22568141e0e368caff2a37887bd55ce5fe0bba49c3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2010</creationdate><topic>Algorithms</topic><topic>Ant colony optimization</topic><topic>CAE) and Design</topic><topic>Computer-Aided Engineering (CAD</topic><topic>Computing time</topic><topic>Engineering</topic><topic>Flexible manufacturing systems</topic><topic>Industrial and Production Engineering</topic><topic>Mechanical Engineering</topic><topic>Media Management</topic><topic>Optimization techniques</topic><topic>Original Article</topic><topic>Schedules</topic><topic>Sequences</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Udhayakumar, P.</creatorcontrib><creatorcontrib>Kumanan, S.</creatorcontrib><collection>CrossRef</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering Collection</collection><jtitle>International journal of advanced manufacturing technology</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Udhayakumar, P.</au><au>Kumanan, S.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm</atitle><jtitle>International journal of advanced manufacturing technology</jtitle><stitle>Int J Adv Manuf Technol</stitle><date>2010-10-01</date><risdate>2010</risdate><volume>50</volume><issue>9-12</issue><spage>1075</spage><epage>1084</epage><pages>1075-1084</pages><issn>0268-3768</issn><eissn>1433-3015</eissn><abstract>Many optimization problems from the manufacturing systems are very complex in nature and quite hard to solve by conventional optimization techniques. The theme of this paper is to generate an active schedules and optimal sequence of job and tool that can meet minimum makespan schedule for the flexible manufacturing system. It consists of similar work center which is capable of doing many operations. The tools are stored in a common tool magazine that shares with and serves for several work centers to reduce the cost of duplicating tools in each and every work center. This type of manufacturing system is used for a manufacturing environment in which tools are expensive. To achieve the objective, the jobs and tools are sequenced and scheduled. In this work, non-traditional optimization technique such as ant colony optimization (ACO) algorithm are proposed to derive near-optimal solutions which adopt the Extended Giffler and Thompson algorithm for active feasible schedule generation. In this paper, the proposed algorithm is used for solving number of problems taken from the literature. The results available for the various existing algorithms are compared with results obtained by the ACO algorithm. The analysis reveals that ACO algorithm provides better solution with reasonable computational time.</abstract><cop>London</cop><pub>Springer-Verlag</pub><doi>10.1007/s00170-010-2583-9</doi><tpages>10</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0268-3768
ispartof International journal of advanced manufacturing technology, 2010-10, Vol.50 (9-12), p.1075-1084
issn 0268-3768
1433-3015
language eng
recordid cdi_proquest_journals_2262416907
source SpringerLink Journals - AutoHoldings
subjects Algorithms
Ant colony optimization
CAE) and Design
Computer-Aided Engineering (CAD
Computing time
Engineering
Flexible manufacturing systems
Industrial and Production Engineering
Mechanical Engineering
Media Management
Optimization techniques
Original Article
Schedules
Sequences
title Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-13T07%3A46%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Sequencing%20and%20scheduling%20of%20job%20and%20tool%20in%20a%20flexible%20manufacturing%20system%20using%20ant%20colony%20optimization%20algorithm&rft.jtitle=International%20journal%20of%20advanced%20manufacturing%20technology&rft.au=Udhayakumar,%20P.&rft.date=2010-10-01&rft.volume=50&rft.issue=9-12&rft.spage=1075&rft.epage=1084&rft.pages=1075-1084&rft.issn=0268-3768&rft.eissn=1433-3015&rft_id=info:doi/10.1007/s00170-010-2583-9&rft_dat=%3Cproquest_cross%3E2262416907%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2262416907&rft_id=info:pmid/&rfr_iscdi=true