Integrated maintenance and production planning with energy consumption and minimal repair
In this study, we analyze an integrated production-preventive maintenance planning problem where product processing times are affected by machine degradation. Preventive maintenance and repair can return the degraded machines/equipment to normal conditions, which can improve the job processing times...
Gespeichert in:
Veröffentlicht in: | International journal of advanced manufacturing technology 2014-10, Vol.74 (9-12), p.1419-1430 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!