Numerical Investigation of the Optimum Location for Vertical Drains in Gravity Dams
The seepage beneath a concrete dam causes an upward force acting to the dam foundation, known as uplift. Previous literatures show that implementation of drainage wells in gravity dam foundations causes a reduction in uplift forces. The main aim of these wells is to drain excess seepage flow bypasse...
Gespeichert in:
Veröffentlicht in: | Geotechnical and geological engineering 2017-04, Vol.35 (2), p.799-808 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!