MINIMIZING POND SIZE USING AN OFF-SITE POND IN A CLOSED BASIN: A STORM FLOW MITIGATION DESIGN AND EVALUATION
Construction of large on-site detention pond to manage the stormwater runoff in the project area is not only expensive, but also a waste of developable land. To minimize the pond size, a systematic design of storm flow routing followed by model verification is necessary. This study presents a challe...
Gespeichert in:
Veröffentlicht in: | International journal of sustainable development and planning 2014-04, Vol.9 (2), p.211-224 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!