Reservoir system expansion scheduling under conflicting interests

This work proposes a many objective approach where a schedule of new dams is optimised along-side dam selections and operating rules. We investigate the extent to which changing management rules during infrastructure system expansion increases the ability to identify best performing plans. The appro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Environmental modelling & software : with environment data news 2019-08, Vol.118, p.201-210
Hauptverfasser: Geressu, Robel T., Harou, Julien J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 210
container_issue
container_start_page 201
container_title Environmental modelling & software : with environment data news
container_volume 118
creator Geressu, Robel T.
Harou, Julien J.
description This work proposes a many objective approach where a schedule of new dams is optimised along-side dam selections and operating rules. We investigate the extent to which changing management rules during infrastructure system expansion increases the ability to identify best performing plans. The approach links river basin simulation to many objective robust optimisation, so that expansion plans are optimised across multiple scenarios and considering multiple metrics. The approach is demonstrated using the Blue Nile hydropower reservoir system, identifying dam activation schedules that achieve efficient trade-offs for various conflicting objectives including discounted net benefits, reliable downstream releases and energy generation. Multi-reservoir system expansion scheduling formulations with three different levels of operating rule responsiveness to expansion are compared for performance and computational requirements. Results show benefits increase when release rules change as the multi-reservoir system expands, with failure to optimally adapt operating rules loosing up to 25% of NPV. •Filling period performance may impact acceptability of new dams in large systems.•Selection, operating rules, & expansion schedule of new dams optimised across many criteria.•If release rules are allowed to change during system expansion, performance improves.•Not updating rules during expansion loses up to 25% in financial benefits in our Blue Nile case-study.•Visual analytic parallel plots can help communicate performance tradeoffs and expansion schedules.
doi_str_mv 10.1016/j.envsoft.2019.04.002
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2250582554</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S1364815217309209</els_id><sourcerecordid>2250582554</sourcerecordid><originalsourceid>FETCH-LOGICAL-c384t-c819878e32b5a2cd7154ddc13c31d2cb141ab6b2848ebbf5b838c060ff01a85d3</originalsourceid><addsrcrecordid>eNqFkFtLAzEQhYMoWKs_QVjwedfJbTd9klK8QUEQfQ67yaymtElNdov996a07z7NYZhzDvMRckuhokDr-1WFfpdCP1QM6KwCUQGwMzKhquFl3bD6PGtei1JRyS7JVUorAMhaTMj8HRPGXXCxSPs04KbA323rkwu-SOYb7bh2_qsYvcVYmOD7tTPDYeP8gBHTkK7JRd-uE96c5pR8Pj1-LF7K5dvz62K-LA1XYiiNojPVKOSsky0ztqFSWGsoN5xaZjoqaNvVHVNCYdf1slNcGaih74G2Slo-JXfH3G0MP2Nu1qswRp8rNWMSpGJSinwlj1cmhpQi9nob3aaNe01BH2jplT7R0gdaGoTOtLLv4ejD_MLOYdTJOPQGrYtoBm2D-yfhD2DqdyU</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2250582554</pqid></control><display><type>article</type><title>Reservoir system expansion scheduling under conflicting interests</title><source>Access via ScienceDirect (Elsevier)</source><creator>Geressu, Robel T. ; Harou, Julien J.</creator><creatorcontrib>Geressu, Robel T. ; Harou, Julien J.</creatorcontrib><description>This work proposes a many objective approach where a schedule of new dams is optimised along-side dam selections and operating rules. We investigate the extent to which changing management rules during infrastructure system expansion increases the ability to identify best performing plans. The approach links river basin simulation to many objective robust optimisation, so that expansion plans are optimised across multiple scenarios and considering multiple metrics. The approach is demonstrated using the Blue Nile hydropower reservoir system, identifying dam activation schedules that achieve efficient trade-offs for various conflicting objectives including discounted net benefits, reliable downstream releases and energy generation. Multi-reservoir system expansion scheduling formulations with three different levels of operating rule responsiveness to expansion are compared for performance and computational requirements. Results show benefits increase when release rules change as the multi-reservoir system expands, with failure to optimally adapt operating rules loosing up to 25% of NPV. •Filling period performance may impact acceptability of new dams in large systems.•Selection, operating rules, &amp; expansion schedule of new dams optimised across many criteria.•If release rules are allowed to change during system expansion, performance improves.•Not updating rules during expansion loses up to 25% in financial benefits in our Blue Nile case-study.•Visual analytic parallel plots can help communicate performance tradeoffs and expansion schedules.</description><identifier>ISSN: 1364-8152</identifier><identifier>EISSN: 1873-6726</identifier><identifier>DOI: 10.1016/j.envsoft.2019.04.002</identifier><language>eng</language><publisher>Oxford: Elsevier Ltd</publisher><subject>Capacity expansion ; Computer applications ; Computer simulation ; Dams ; Expansion ; Formulations ; Hydroelectric power ; Infrastructure development planning ; Many objective optimisation ; Nile river basin ; Optimization ; Product design ; Reservoirs ; River basins ; Rivers ; Schedules ; Scheduling ; Trans-boundary systems</subject><ispartof>Environmental modelling &amp; software : with environment data news, 2019-08, Vol.118, p.201-210</ispartof><rights>2019</rights><rights>Copyright Elsevier Science Ltd. Aug 2019</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c384t-c819878e32b5a2cd7154ddc13c31d2cb141ab6b2848ebbf5b838c060ff01a85d3</citedby><cites>FETCH-LOGICAL-c384t-c819878e32b5a2cd7154ddc13c31d2cb141ab6b2848ebbf5b838c060ff01a85d3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.envsoft.2019.04.002$$EHTML$$P50$$Gelsevier$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,3550,27924,27925,45995</link.rule.ids></links><search><creatorcontrib>Geressu, Robel T.</creatorcontrib><creatorcontrib>Harou, Julien J.</creatorcontrib><title>Reservoir system expansion scheduling under conflicting interests</title><title>Environmental modelling &amp; software : with environment data news</title><description>This work proposes a many objective approach where a schedule of new dams is optimised along-side dam selections and operating rules. We investigate the extent to which changing management rules during infrastructure system expansion increases the ability to identify best performing plans. The approach links river basin simulation to many objective robust optimisation, so that expansion plans are optimised across multiple scenarios and considering multiple metrics. The approach is demonstrated using the Blue Nile hydropower reservoir system, identifying dam activation schedules that achieve efficient trade-offs for various conflicting objectives including discounted net benefits, reliable downstream releases and energy generation. Multi-reservoir system expansion scheduling formulations with three different levels of operating rule responsiveness to expansion are compared for performance and computational requirements. Results show benefits increase when release rules change as the multi-reservoir system expands, with failure to optimally adapt operating rules loosing up to 25% of NPV. •Filling period performance may impact acceptability of new dams in large systems.•Selection, operating rules, &amp; expansion schedule of new dams optimised across many criteria.•If release rules are allowed to change during system expansion, performance improves.•Not updating rules during expansion loses up to 25% in financial benefits in our Blue Nile case-study.•Visual analytic parallel plots can help communicate performance tradeoffs and expansion schedules.</description><subject>Capacity expansion</subject><subject>Computer applications</subject><subject>Computer simulation</subject><subject>Dams</subject><subject>Expansion</subject><subject>Formulations</subject><subject>Hydroelectric power</subject><subject>Infrastructure development planning</subject><subject>Many objective optimisation</subject><subject>Nile river basin</subject><subject>Optimization</subject><subject>Product design</subject><subject>Reservoirs</subject><subject>River basins</subject><subject>Rivers</subject><subject>Schedules</subject><subject>Scheduling</subject><subject>Trans-boundary systems</subject><issn>1364-8152</issn><issn>1873-6726</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNqFkFtLAzEQhYMoWKs_QVjwedfJbTd9klK8QUEQfQ67yaymtElNdov996a07z7NYZhzDvMRckuhokDr-1WFfpdCP1QM6KwCUQGwMzKhquFl3bD6PGtei1JRyS7JVUorAMhaTMj8HRPGXXCxSPs04KbA323rkwu-SOYb7bh2_qsYvcVYmOD7tTPDYeP8gBHTkK7JRd-uE96c5pR8Pj1-LF7K5dvz62K-LA1XYiiNojPVKOSsky0ztqFSWGsoN5xaZjoqaNvVHVNCYdf1slNcGaih74G2Slo-JXfH3G0MP2Nu1qswRp8rNWMSpGJSinwlj1cmhpQi9nob3aaNe01BH2jplT7R0gdaGoTOtLLv4ejD_MLOYdTJOPQGrYtoBm2D-yfhD2DqdyU</recordid><startdate>201908</startdate><enddate>201908</enddate><creator>Geressu, Robel T.</creator><creator>Harou, Julien J.</creator><general>Elsevier Ltd</general><general>Elsevier Science Ltd</general><scope>6I.</scope><scope>AAFTH</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7QH</scope><scope>7SC</scope><scope>7ST</scope><scope>7UA</scope><scope>8FD</scope><scope>C1K</scope><scope>FR3</scope><scope>JQ2</scope><scope>KR7</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope><scope>SOI</scope></search><sort><creationdate>201908</creationdate><title>Reservoir system expansion scheduling under conflicting interests</title><author>Geressu, Robel T. ; Harou, Julien J.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c384t-c819878e32b5a2cd7154ddc13c31d2cb141ab6b2848ebbf5b838c060ff01a85d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Capacity expansion</topic><topic>Computer applications</topic><topic>Computer simulation</topic><topic>Dams</topic><topic>Expansion</topic><topic>Formulations</topic><topic>Hydroelectric power</topic><topic>Infrastructure development planning</topic><topic>Many objective optimisation</topic><topic>Nile river basin</topic><topic>Optimization</topic><topic>Product design</topic><topic>Reservoirs</topic><topic>River basins</topic><topic>Rivers</topic><topic>Schedules</topic><topic>Scheduling</topic><topic>Trans-boundary systems</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Geressu, Robel T.</creatorcontrib><creatorcontrib>Harou, Julien J.</creatorcontrib><collection>ScienceDirect Open Access Titles</collection><collection>Elsevier:ScienceDirect:Open Access</collection><collection>CrossRef</collection><collection>Aqualine</collection><collection>Computer and Information Systems Abstracts</collection><collection>Environment Abstracts</collection><collection>Water Resources Abstracts</collection><collection>Technology Research Database</collection><collection>Environmental Sciences and Pollution Management</collection><collection>Engineering Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts – Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><collection>Environment Abstracts</collection><jtitle>Environmental modelling &amp; software : with environment data news</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Geressu, Robel T.</au><au>Harou, Julien J.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Reservoir system expansion scheduling under conflicting interests</atitle><jtitle>Environmental modelling &amp; software : with environment data news</jtitle><date>2019-08</date><risdate>2019</risdate><volume>118</volume><spage>201</spage><epage>210</epage><pages>201-210</pages><issn>1364-8152</issn><eissn>1873-6726</eissn><abstract>This work proposes a many objective approach where a schedule of new dams is optimised along-side dam selections and operating rules. We investigate the extent to which changing management rules during infrastructure system expansion increases the ability to identify best performing plans. The approach links river basin simulation to many objective robust optimisation, so that expansion plans are optimised across multiple scenarios and considering multiple metrics. The approach is demonstrated using the Blue Nile hydropower reservoir system, identifying dam activation schedules that achieve efficient trade-offs for various conflicting objectives including discounted net benefits, reliable downstream releases and energy generation. Multi-reservoir system expansion scheduling formulations with three different levels of operating rule responsiveness to expansion are compared for performance and computational requirements. Results show benefits increase when release rules change as the multi-reservoir system expands, with failure to optimally adapt operating rules loosing up to 25% of NPV. •Filling period performance may impact acceptability of new dams in large systems.•Selection, operating rules, &amp; expansion schedule of new dams optimised across many criteria.•If release rules are allowed to change during system expansion, performance improves.•Not updating rules during expansion loses up to 25% in financial benefits in our Blue Nile case-study.•Visual analytic parallel plots can help communicate performance tradeoffs and expansion schedules.</abstract><cop>Oxford</cop><pub>Elsevier Ltd</pub><doi>10.1016/j.envsoft.2019.04.002</doi><tpages>10</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 1364-8152
ispartof Environmental modelling & software : with environment data news, 2019-08, Vol.118, p.201-210
issn 1364-8152
1873-6726
language eng
recordid cdi_proquest_journals_2250582554
source Access via ScienceDirect (Elsevier)
subjects Capacity expansion
Computer applications
Computer simulation
Dams
Expansion
Formulations
Hydroelectric power
Infrastructure development planning
Many objective optimisation
Nile river basin
Optimization
Product design
Reservoirs
River basins
Rivers
Schedules
Scheduling
Trans-boundary systems
title Reservoir system expansion scheduling under conflicting interests
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T04%3A36%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Reservoir%20system%20expansion%20scheduling%20under%20conflicting%20interests&rft.jtitle=Environmental%20modelling%20&%20software%20:%20with%20environment%20data%20news&rft.au=Geressu,%20Robel%20T.&rft.date=2019-08&rft.volume=118&rft.spage=201&rft.epage=210&rft.pages=201-210&rft.issn=1364-8152&rft.eissn=1873-6726&rft_id=info:doi/10.1016/j.envsoft.2019.04.002&rft_dat=%3Cproquest_cross%3E2250582554%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2250582554&rft_id=info:pmid/&rft_els_id=S1364815217309209&rfr_iscdi=true