Lessons Learned from Progressive Design-Build Implementation on Airport Projects

AbstractOver the last decade, with legislation changes and increased project complexity, some airports started using progressive design-build (DB) project delivery, a variation of the traditional DB model. This is because it allows owners to hire a designer-builder without a price commitment until r...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of legal affairs and dispute resolution in engineering and construction 2019-11, Vol.11 (4)
Hauptverfasser: Gad, Ghada M, Davis, Brandon, Shrestha, Pramen P, Harder, Patrick
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 4
container_start_page
container_title Journal of legal affairs and dispute resolution in engineering and construction
container_volume 11
creator Gad, Ghada M
Davis, Brandon
Shrestha, Pramen P
Harder, Patrick
description AbstractOver the last decade, with legislation changes and increased project complexity, some airports started using progressive design-build (DB) project delivery, a variation of the traditional DB model. This is because it allows owners to hire a designer-builder without a price commitment until reasonable design details are defined. This paper, thus, aims at investigating and presenting lessons learned in planning, procurement, contract formation, and management of progressive DB. The methodology incorporated a comprehensive literature review of major procurement, contractual, and legal issues pertinent to delivering airport projects using progressive DB. Ten overarching aspects were identified and were further investigated on a California terminal expansion project case study, encompassing two progressive DB contracts. Results show that owners select progressive DB for schedule compression and delayed locking of contract price reasons. Lessons learned encompassed moving project handover responsibility to the designer-builder, closely tracking and participating in the design development process, and vigilantly handling cost-saving provisions so as not to jeopardize project quality.
doi_str_mv 10.1061/(ASCE)LA.1943-4170.0000320
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2246967343</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2246967343</sourcerecordid><originalsourceid>FETCH-LOGICAL-a380t-43de918803b97e218084ea9fdf5b558b5c0002a66d7d1fdf2d9d55b58a32fb993</originalsourceid><addsrcrecordid>eNp1kN9LwzAQgIMoOKf_Q9EXfejMjzZNfKtz6qDgQH0OaXMdHWtTk07wvzdlU588Ahfu7ruQD6FLgmcEc3J7nb_OFzdFPiMyYXFCMjzDIRjFR2jyWzv-vXN6is6832DMU86SCVoV4L3tfFSAdh2YqHa2jVbOrl1oNJ8QPYBv1l18v2u2Jlq2_RZa6AY9NLaLwskb11s3jMgGqsGfo5Nabz1cHPIUvT8u3ubPcfHytJznRayZwEOcMAOSCIFZKTOgRGCRgJa1qdMyTUWZVuEbVHNuMkNClRpp0tASmtG6lJJN0dV-b-_sxw78oDZ257rwpKI04ZJnLGFh6m4_VTnrvYNa9a5ptftSBKvRoFKjQVXkajSkRlvqYDDAfA9rX8Hf-h_yf_Ab38t0_Q</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2246967343</pqid></control><display><type>article</type><title>Lessons Learned from Progressive Design-Build Implementation on Airport Projects</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><creator>Gad, Ghada M ; Davis, Brandon ; Shrestha, Pramen P ; Harder, Patrick</creator><creatorcontrib>Gad, Ghada M ; Davis, Brandon ; Shrestha, Pramen P ; Harder, Patrick</creatorcontrib><description>AbstractOver the last decade, with legislation changes and increased project complexity, some airports started using progressive design-build (DB) project delivery, a variation of the traditional DB model. This is because it allows owners to hire a designer-builder without a price commitment until reasonable design details are defined. This paper, thus, aims at investigating and presenting lessons learned in planning, procurement, contract formation, and management of progressive DB. The methodology incorporated a comprehensive literature review of major procurement, contractual, and legal issues pertinent to delivering airport projects using progressive DB. Ten overarching aspects were identified and were further investigated on a California terminal expansion project case study, encompassing two progressive DB contracts. Results show that owners select progressive DB for schedule compression and delayed locking of contract price reasons. Lessons learned encompassed moving project handover responsibility to the designer-builder, closely tracking and participating in the design development process, and vigilantly handling cost-saving provisions so as not to jeopardize project quality.</description><identifier>ISSN: 1943-4162</identifier><identifier>EISSN: 1943-4170</identifier><identifier>DOI: 10.1061/(ASCE)LA.1943-4170.0000320</identifier><language>eng</language><publisher>Reston: American Society of Civil Engineers</publisher><subject>Airport construction ; Airports ; Design ; Legal issues ; Legislation ; Literature reviews ; Locking ; Procurement contracts ; Procurement management ; Schedules ; Scholarly Paper ; Scholarly Papers</subject><ispartof>Journal of legal affairs and dispute resolution in engineering and construction, 2019-11, Vol.11 (4)</ispartof><rights>2019 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a380t-43de918803b97e218084ea9fdf5b558b5c0002a66d7d1fdf2d9d55b58a32fb993</citedby><orcidid>0000-0002-1246-6639 ; 0000-0001-6362-2315 ; 0000-0002-2535-8733</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)LA.1943-4170.0000320$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)LA.1943-4170.0000320$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,776,780,27901,27902,75936,75944</link.rule.ids></links><search><creatorcontrib>Gad, Ghada M</creatorcontrib><creatorcontrib>Davis, Brandon</creatorcontrib><creatorcontrib>Shrestha, Pramen P</creatorcontrib><creatorcontrib>Harder, Patrick</creatorcontrib><title>Lessons Learned from Progressive Design-Build Implementation on Airport Projects</title><title>Journal of legal affairs and dispute resolution in engineering and construction</title><description>AbstractOver the last decade, with legislation changes and increased project complexity, some airports started using progressive design-build (DB) project delivery, a variation of the traditional DB model. This is because it allows owners to hire a designer-builder without a price commitment until reasonable design details are defined. This paper, thus, aims at investigating and presenting lessons learned in planning, procurement, contract formation, and management of progressive DB. The methodology incorporated a comprehensive literature review of major procurement, contractual, and legal issues pertinent to delivering airport projects using progressive DB. Ten overarching aspects were identified and were further investigated on a California terminal expansion project case study, encompassing two progressive DB contracts. Results show that owners select progressive DB for schedule compression and delayed locking of contract price reasons. Lessons learned encompassed moving project handover responsibility to the designer-builder, closely tracking and participating in the design development process, and vigilantly handling cost-saving provisions so as not to jeopardize project quality.</description><subject>Airport construction</subject><subject>Airports</subject><subject>Design</subject><subject>Legal issues</subject><subject>Legislation</subject><subject>Literature reviews</subject><subject>Locking</subject><subject>Procurement contracts</subject><subject>Procurement management</subject><subject>Schedules</subject><subject>Scholarly Paper</subject><subject>Scholarly Papers</subject><issn>1943-4162</issn><issn>1943-4170</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNp1kN9LwzAQgIMoOKf_Q9EXfejMjzZNfKtz6qDgQH0OaXMdHWtTk07wvzdlU588Ahfu7ruQD6FLgmcEc3J7nb_OFzdFPiMyYXFCMjzDIRjFR2jyWzv-vXN6is6832DMU86SCVoV4L3tfFSAdh2YqHa2jVbOrl1oNJ8QPYBv1l18v2u2Jlq2_RZa6AY9NLaLwskb11s3jMgGqsGfo5Nabz1cHPIUvT8u3ubPcfHytJznRayZwEOcMAOSCIFZKTOgRGCRgJa1qdMyTUWZVuEbVHNuMkNClRpp0tASmtG6lJJN0dV-b-_sxw78oDZ257rwpKI04ZJnLGFh6m4_VTnrvYNa9a5ptftSBKvRoFKjQVXkajSkRlvqYDDAfA9rX8Hf-h_yf_Ab38t0_Q</recordid><startdate>20191101</startdate><enddate>20191101</enddate><creator>Gad, Ghada M</creator><creator>Davis, Brandon</creator><creator>Shrestha, Pramen P</creator><creator>Harder, Patrick</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope><orcidid>https://orcid.org/0000-0002-1246-6639</orcidid><orcidid>https://orcid.org/0000-0001-6362-2315</orcidid><orcidid>https://orcid.org/0000-0002-2535-8733</orcidid></search><sort><creationdate>20191101</creationdate><title>Lessons Learned from Progressive Design-Build Implementation on Airport Projects</title><author>Gad, Ghada M ; Davis, Brandon ; Shrestha, Pramen P ; Harder, Patrick</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a380t-43de918803b97e218084ea9fdf5b558b5c0002a66d7d1fdf2d9d55b58a32fb993</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Airport construction</topic><topic>Airports</topic><topic>Design</topic><topic>Legal issues</topic><topic>Legislation</topic><topic>Literature reviews</topic><topic>Locking</topic><topic>Procurement contracts</topic><topic>Procurement management</topic><topic>Schedules</topic><topic>Scholarly Paper</topic><topic>Scholarly Papers</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Gad, Ghada M</creatorcontrib><creatorcontrib>Davis, Brandon</creatorcontrib><creatorcontrib>Shrestha, Pramen P</creatorcontrib><creatorcontrib>Harder, Patrick</creatorcontrib><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of legal affairs and dispute resolution in engineering and construction</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Gad, Ghada M</au><au>Davis, Brandon</au><au>Shrestha, Pramen P</au><au>Harder, Patrick</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Lessons Learned from Progressive Design-Build Implementation on Airport Projects</atitle><jtitle>Journal of legal affairs and dispute resolution in engineering and construction</jtitle><date>2019-11-01</date><risdate>2019</risdate><volume>11</volume><issue>4</issue><issn>1943-4162</issn><eissn>1943-4170</eissn><abstract>AbstractOver the last decade, with legislation changes and increased project complexity, some airports started using progressive design-build (DB) project delivery, a variation of the traditional DB model. This is because it allows owners to hire a designer-builder without a price commitment until reasonable design details are defined. This paper, thus, aims at investigating and presenting lessons learned in planning, procurement, contract formation, and management of progressive DB. The methodology incorporated a comprehensive literature review of major procurement, contractual, and legal issues pertinent to delivering airport projects using progressive DB. Ten overarching aspects were identified and were further investigated on a California terminal expansion project case study, encompassing two progressive DB contracts. Results show that owners select progressive DB for schedule compression and delayed locking of contract price reasons. Lessons learned encompassed moving project handover responsibility to the designer-builder, closely tracking and participating in the design development process, and vigilantly handling cost-saving provisions so as not to jeopardize project quality.</abstract><cop>Reston</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)LA.1943-4170.0000320</doi><orcidid>https://orcid.org/0000-0002-1246-6639</orcidid><orcidid>https://orcid.org/0000-0001-6362-2315</orcidid><orcidid>https://orcid.org/0000-0002-2535-8733</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 1943-4162
ispartof Journal of legal affairs and dispute resolution in engineering and construction, 2019-11, Vol.11 (4)
issn 1943-4162
1943-4170
language eng
recordid cdi_proquest_journals_2246967343
source American Society of Civil Engineers:NESLI2:Journals:2014
subjects Airport construction
Airports
Design
Legal issues
Legislation
Literature reviews
Locking
Procurement contracts
Procurement management
Schedules
Scholarly Paper
Scholarly Papers
title Lessons Learned from Progressive Design-Build Implementation on Airport Projects
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T08%3A18%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Lessons%20Learned%20from%20Progressive%20Design-Build%20Implementation%20on%20Airport%20Projects&rft.jtitle=Journal%20of%20legal%20affairs%20and%20dispute%20resolution%20in%20engineering%20and%20construction&rft.au=Gad,%20Ghada%20M&rft.date=2019-11-01&rft.volume=11&rft.issue=4&rft.issn=1943-4162&rft.eissn=1943-4170&rft_id=info:doi/10.1061/(ASCE)LA.1943-4170.0000320&rft_dat=%3Cproquest_cross%3E2246967343%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2246967343&rft_id=info:pmid/&rfr_iscdi=true