Ready-Time Scheduling with Stochastic Service Times
A frequently encountered scheduling problem is to determine simultaneously a material and job ready time and production sequence based on customer-specified due dates. Each job has a stochastic production time and a deterministic due date. The ready time is constrained in that the probability that e...