Scheduling rules for dynamic shops that manufacture multi-level jobs
The problem of scheduling in dynamic conventional jobshops has been extensively investigated over many years. However, the problem of scheduling in assembly jobshops (i.e. shops that manufacture multi-level jobs with components and subassemblies) has been relatively less investigated in spite of the...
Gespeichert in:
Veröffentlicht in: | Computers & industrial engineering 2003, Vol.44 (1), p.119-131 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!