Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms

AbstractModular construction offers several advantages, such as safe working conditions, fast construction, and high-quality end products. The project scheduling of modular construction should consider the time involved in the factory production, transportation, and erection processes of the units g...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 2019-01, Vol.145 (1)
Hauptverfasser: Lee, Jeonghoon, Hyun, Hosang
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page
container_title Journal of construction engineering and management
container_volume 145
creator Lee, Jeonghoon
Hyun, Hosang
description AbstractModular construction offers several advantages, such as safe working conditions, fast construction, and high-quality end products. The project scheduling of modular construction should consider the time involved in the factory production, transportation, and erection processes of the units given limited resources (e.g., the number of modular units, available transportation, and workers) and project restrictions (e.g., the sequences of manufacturing production and on-site installation). However, current modular construction project scheduling techniques and previous academic approaches cannot deal with the overall project processes and production/on-site installation sequences simultaneously. This is one reason few mass-production multiple projects exist in the manufacturing industry. Moreover, it can lead to inappropriate project management guidelines and fail to minimize the overall project duration. This paper suggests a model for modular construction projects scheduling using a genetic algorithm. The results show that implementing both overall project processes and project requirements is an efficient way to develop a modular construction project schedule. The proposed optimization tool will help project managers allocate resources efficiently and reduce the completion time of multiple projects.
doi_str_mv 10.1061/(ASCE)CO.1943-7862.0001585
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2127214008</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2127214008</sourcerecordid><originalsourceid>FETCH-LOGICAL-a436t-6691dc16b45d24da0e3edcdb2fe5e27f9575e294036845376667f4090b4771f33</originalsourceid><addsrcrecordid>eNp1kM1OwzAQhC0EEqXwDhFc4JDifyfcSlQKUqsiSs9WajutqxAX2znw9iRqgROXHWl3Zlb6ALhGcIQgR_e342UxuSsWI5RTkoqM4xGEELGMnYDB7-4UDKAgJM0Jp-fgIoRd56E8ZwPwNm_raPe1SeZOt3Xpk8fW1to2m6RwTYi-VdG6Jnn1bmdUTJZqazpff1-Ffk5NY6JVybjeOG_j9iNcgrOqrIO5OuoQrJ4m78VzOltMX4rxLC0p4THlPEdaIb6mTGOqS2iI0UqvcWWYwaLKmeg0p5DwjDIiOOeiojCHayoEqggZgptD7967z9aEKHeu9U33UmKEBUYUwqxzPRxcyrsQvKnk3tuP0n9JBGXPUMqeoSwWsucle17yyLAL80O4DMr81f8k_w9-AwtIdXw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2127214008</pqid></control><display><type>article</type><title>Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><creator>Lee, Jeonghoon ; Hyun, Hosang</creator><creatorcontrib>Lee, Jeonghoon ; Hyun, Hosang</creatorcontrib><description>AbstractModular construction offers several advantages, such as safe working conditions, fast construction, and high-quality end products. The project scheduling of modular construction should consider the time involved in the factory production, transportation, and erection processes of the units given limited resources (e.g., the number of modular units, available transportation, and workers) and project restrictions (e.g., the sequences of manufacturing production and on-site installation). However, current modular construction project scheduling techniques and previous academic approaches cannot deal with the overall project processes and production/on-site installation sequences simultaneously. This is one reason few mass-production multiple projects exist in the manufacturing industry. Moreover, it can lead to inappropriate project management guidelines and fail to minimize the overall project duration. This paper suggests a model for modular construction projects scheduling using a genetic algorithm. The results show that implementing both overall project processes and project requirements is an efficient way to develop a modular construction project schedule. The proposed optimization tool will help project managers allocate resources efficiently and reduce the completion time of multiple projects.</description><identifier>ISSN: 0733-9364</identifier><identifier>EISSN: 1943-7862</identifier><identifier>DOI: 10.1061/(ASCE)CO.1943-7862.0001585</identifier><language>eng</language><publisher>New York: American Society of Civil Engineers</publisher><subject>Completion time ; Genetic algorithms ; Modular construction ; Modular units ; Project management ; Scheduling ; Technical Papers ; Transportation</subject><ispartof>Journal of construction engineering and management, 2019-01, Vol.145 (1)</ispartof><rights>2018 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a436t-6691dc16b45d24da0e3edcdb2fe5e27f9575e294036845376667f4090b4771f33</citedby><cites>FETCH-LOGICAL-a436t-6691dc16b45d24da0e3edcdb2fe5e27f9575e294036845376667f4090b4771f33</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)CO.1943-7862.0001585$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0001585$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,780,784,27924,27925,76193,76201</link.rule.ids></links><search><creatorcontrib>Lee, Jeonghoon</creatorcontrib><creatorcontrib>Hyun, Hosang</creatorcontrib><title>Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms</title><title>Journal of construction engineering and management</title><description>AbstractModular construction offers several advantages, such as safe working conditions, fast construction, and high-quality end products. The project scheduling of modular construction should consider the time involved in the factory production, transportation, and erection processes of the units given limited resources (e.g., the number of modular units, available transportation, and workers) and project restrictions (e.g., the sequences of manufacturing production and on-site installation). However, current modular construction project scheduling techniques and previous academic approaches cannot deal with the overall project processes and production/on-site installation sequences simultaneously. This is one reason few mass-production multiple projects exist in the manufacturing industry. Moreover, it can lead to inappropriate project management guidelines and fail to minimize the overall project duration. This paper suggests a model for modular construction projects scheduling using a genetic algorithm. The results show that implementing both overall project processes and project requirements is an efficient way to develop a modular construction project schedule. The proposed optimization tool will help project managers allocate resources efficiently and reduce the completion time of multiple projects.</description><subject>Completion time</subject><subject>Genetic algorithms</subject><subject>Modular construction</subject><subject>Modular units</subject><subject>Project management</subject><subject>Scheduling</subject><subject>Technical Papers</subject><subject>Transportation</subject><issn>0733-9364</issn><issn>1943-7862</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNp1kM1OwzAQhC0EEqXwDhFc4JDifyfcSlQKUqsiSs9WajutqxAX2znw9iRqgROXHWl3Zlb6ALhGcIQgR_e342UxuSsWI5RTkoqM4xGEELGMnYDB7-4UDKAgJM0Jp-fgIoRd56E8ZwPwNm_raPe1SeZOt3Xpk8fW1to2m6RwTYi-VdG6Jnn1bmdUTJZqazpff1-Ffk5NY6JVybjeOG_j9iNcgrOqrIO5OuoQrJ4m78VzOltMX4rxLC0p4THlPEdaIb6mTGOqS2iI0UqvcWWYwaLKmeg0p5DwjDIiOOeiojCHayoEqggZgptD7967z9aEKHeu9U33UmKEBUYUwqxzPRxcyrsQvKnk3tuP0n9JBGXPUMqeoSwWsucle17yyLAL80O4DMr81f8k_w9-AwtIdXw</recordid><startdate>20190101</startdate><enddate>20190101</enddate><creator>Lee, Jeonghoon</creator><creator>Hyun, Hosang</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20190101</creationdate><title>Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms</title><author>Lee, Jeonghoon ; Hyun, Hosang</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a436t-6691dc16b45d24da0e3edcdb2fe5e27f9575e294036845376667f4090b4771f33</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Completion time</topic><topic>Genetic algorithms</topic><topic>Modular construction</topic><topic>Modular units</topic><topic>Project management</topic><topic>Scheduling</topic><topic>Technical Papers</topic><topic>Transportation</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Lee, Jeonghoon</creatorcontrib><creatorcontrib>Hyun, Hosang</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of construction engineering and management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Lee, Jeonghoon</au><au>Hyun, Hosang</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms</atitle><jtitle>Journal of construction engineering and management</jtitle><date>2019-01-01</date><risdate>2019</risdate><volume>145</volume><issue>1</issue><issn>0733-9364</issn><eissn>1943-7862</eissn><abstract>AbstractModular construction offers several advantages, such as safe working conditions, fast construction, and high-quality end products. The project scheduling of modular construction should consider the time involved in the factory production, transportation, and erection processes of the units given limited resources (e.g., the number of modular units, available transportation, and workers) and project restrictions (e.g., the sequences of manufacturing production and on-site installation). However, current modular construction project scheduling techniques and previous academic approaches cannot deal with the overall project processes and production/on-site installation sequences simultaneously. This is one reason few mass-production multiple projects exist in the manufacturing industry. Moreover, it can lead to inappropriate project management guidelines and fail to minimize the overall project duration. This paper suggests a model for modular construction projects scheduling using a genetic algorithm. The results show that implementing both overall project processes and project requirements is an efficient way to develop a modular construction project schedule. The proposed optimization tool will help project managers allocate resources efficiently and reduce the completion time of multiple projects.</abstract><cop>New York</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)CO.1943-7862.0001585</doi></addata></record>
fulltext fulltext
identifier ISSN: 0733-9364
ispartof Journal of construction engineering and management, 2019-01, Vol.145 (1)
issn 0733-9364
1943-7862
language eng
recordid cdi_proquest_journals_2127214008
source American Society of Civil Engineers:NESLI2:Journals:2014
subjects Completion time
Genetic algorithms
Modular construction
Modular units
Project management
Scheduling
Technical Papers
Transportation
title Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T15%3A07%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Multiple%20Modular%20Building%20Construction%20Project%20Scheduling%20Using%20Genetic%20Algorithms&rft.jtitle=Journal%20of%20construction%20engineering%20and%20management&rft.au=Lee,%20Jeonghoon&rft.date=2019-01-01&rft.volume=145&rft.issue=1&rft.issn=0733-9364&rft.eissn=1943-7862&rft_id=info:doi/10.1061/(ASCE)CO.1943-7862.0001585&rft_dat=%3Cproquest_cross%3E2127214008%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2127214008&rft_id=info:pmid/&rfr_iscdi=true