An analysis method in project management using primal-dual relationships
In the analysis of network models, project evaluation and review technique (PERT) and critical path method (CPM) are the methods which have been widely applied to industrial project planning and control in practice. PERT which is a large scale model, analyzes the project using a standard forward-bac...
Gespeichert in:
Veröffentlicht in: | International journal of project management 1998-10, Vol.16 (5), p.321-327 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 327 |
---|---|
container_issue | 5 |
container_start_page | 321 |
container_title | International journal of project management |
container_volume | 16 |
creator | Gumusoglu, Sevkinaz Tutek, Hulya |
description | In the analysis of network models, project evaluation and review technique (PERT) and critical path method (CPM) are the methods which have been widely applied to industrial project planning and control in practice. PERT which is a large scale model, analyzes the project using a standard forward-backward analysis method. Further, quantitative models have been developed for shortening total project time by determining appropriate activities for crashing with a minimum cost. In this study; to solve the project planning and control problems, a new method of analysis is introduced with the help of the LP model using primal-dual relationships. This method, tested on middle scale problems has proved to be more efficient in terms of mathematical calculations than traditional PERT-CPM solutions, simplex solutions to LP formulation and Out-of-Kilter method. The method of analysis proposed has been applied to a holiday village project with a 370 bed capacity. The result is a minimum cost program with the total project time of 10 months. |
doi_str_mv | 10.1016/S0263-7863(97)00057-4 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_211120304</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0263786397000574</els_id><sourcerecordid>40356842</sourcerecordid><originalsourceid>FETCH-LOGICAL-c249t-270e2b25073fab09c3e97cd873a4b76812912118402991899f7a2f418af8f01b3</originalsourceid><addsrcrecordid>eNqFkE1LwzAYx4MoOKcfQSie9BB98rKmOckY6oSBB_Uc0jTdMtp0Jq2wb2-6iVdPz-H_wv_5IXRN4J4AyR_egeYMiyJnt1LcAcBMYH6CJqQQDPOc8VM0-bOco4sYtwBEJNsELec-0143--hi1tp-01WZ89kudFtr-qxN2tq21vfZEJ1fJ8G1usHVoJss2Eb3rvNx43bxEp3Vuon26vdO0efz08diiVdvL6-L-QobymWPqQBLSzoDwWpdgjTMSmGqtFTzUuQFoZJQQgoOVEpSSFkLTWtOCl0XNZCSTdHNsTdN_Bps7NW2G0L6IKqUIxQY8GSaHU0mdDEGW6vD7rBXBNTITB2YqRGIkkIdmKkx93jM2fTBt7NBReOsN7ZyIeFQVef-afgBm8Ryew</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>211120304</pqid></control><display><type>article</type><title>An analysis method in project management using primal-dual relationships</title><source>Access via ScienceDirect (Elsevier)</source><creator>Gumusoglu, Sevkinaz ; Tutek, Hulya</creator><creatorcontrib>Gumusoglu, Sevkinaz ; Tutek, Hulya</creatorcontrib><description>In the analysis of network models, project evaluation and review technique (PERT) and critical path method (CPM) are the methods which have been widely applied to industrial project planning and control in practice. PERT which is a large scale model, analyzes the project using a standard forward-backward analysis method. Further, quantitative models have been developed for shortening total project time by determining appropriate activities for crashing with a minimum cost. In this study; to solve the project planning and control problems, a new method of analysis is introduced with the help of the LP model using primal-dual relationships. This method, tested on middle scale problems has proved to be more efficient in terms of mathematical calculations than traditional PERT-CPM solutions, simplex solutions to LP formulation and Out-of-Kilter method. The method of analysis proposed has been applied to a holiday village project with a 370 bed capacity. The result is a minimum cost program with the total project time of 10 months.</description><identifier>ISSN: 0263-7863</identifier><identifier>EISSN: 1873-4634</identifier><identifier>DOI: 10.1016/S0263-7863(97)00057-4</identifier><language>eng</language><publisher>Kidlington: Elsevier Ltd</publisher><subject>Construction industry ; Critical path ; critical path programming ; Linear programming ; Mathematical analysis ; PERT ; PERT-cost ; Project evaluation ; Project management ; Studies</subject><ispartof>International journal of project management, 1998-10, Vol.16 (5), p.321-327</ispartof><rights>1998</rights><rights>Copyright Elsevier Science Ltd. Oct 1998</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c249t-270e2b25073fab09c3e97cd873a4b76812912118402991899f7a2f418af8f01b3</citedby><cites>FETCH-LOGICAL-c249t-270e2b25073fab09c3e97cd873a4b76812912118402991899f7a2f418af8f01b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/S0263-7863(97)00057-4$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,780,784,3550,27924,27925,45995</link.rule.ids></links><search><creatorcontrib>Gumusoglu, Sevkinaz</creatorcontrib><creatorcontrib>Tutek, Hulya</creatorcontrib><title>An analysis method in project management using primal-dual relationships</title><title>International journal of project management</title><description>In the analysis of network models, project evaluation and review technique (PERT) and critical path method (CPM) are the methods which have been widely applied to industrial project planning and control in practice. PERT which is a large scale model, analyzes the project using a standard forward-backward analysis method. Further, quantitative models have been developed for shortening total project time by determining appropriate activities for crashing with a minimum cost. In this study; to solve the project planning and control problems, a new method of analysis is introduced with the help of the LP model using primal-dual relationships. This method, tested on middle scale problems has proved to be more efficient in terms of mathematical calculations than traditional PERT-CPM solutions, simplex solutions to LP formulation and Out-of-Kilter method. The method of analysis proposed has been applied to a holiday village project with a 370 bed capacity. The result is a minimum cost program with the total project time of 10 months.</description><subject>Construction industry</subject><subject>Critical path</subject><subject>critical path programming</subject><subject>Linear programming</subject><subject>Mathematical analysis</subject><subject>PERT</subject><subject>PERT-cost</subject><subject>Project evaluation</subject><subject>Project management</subject><subject>Studies</subject><issn>0263-7863</issn><issn>1873-4634</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1998</creationdate><recordtype>article</recordtype><recordid>eNqFkE1LwzAYx4MoOKcfQSie9BB98rKmOckY6oSBB_Uc0jTdMtp0Jq2wb2-6iVdPz-H_wv_5IXRN4J4AyR_egeYMiyJnt1LcAcBMYH6CJqQQDPOc8VM0-bOco4sYtwBEJNsELec-0143--hi1tp-01WZ89kudFtr-qxN2tq21vfZEJ1fJ8G1usHVoJss2Eb3rvNx43bxEp3Vuon26vdO0efz08diiVdvL6-L-QobymWPqQBLSzoDwWpdgjTMSmGqtFTzUuQFoZJQQgoOVEpSSFkLTWtOCl0XNZCSTdHNsTdN_Bps7NW2G0L6IKqUIxQY8GSaHU0mdDEGW6vD7rBXBNTITB2YqRGIkkIdmKkx93jM2fTBt7NBReOsN7ZyIeFQVef-afgBm8Ryew</recordid><startdate>19981001</startdate><enddate>19981001</enddate><creator>Gumusoglu, Sevkinaz</creator><creator>Tutek, Hulya</creator><general>Elsevier Ltd</general><general>Elsevier Science Ltd</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>8FD</scope><scope>JG9</scope><scope>JQ2</scope></search><sort><creationdate>19981001</creationdate><title>An analysis method in project management using primal-dual relationships</title><author>Gumusoglu, Sevkinaz ; Tutek, Hulya</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c249t-270e2b25073fab09c3e97cd873a4b76812912118402991899f7a2f418af8f01b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1998</creationdate><topic>Construction industry</topic><topic>Critical path</topic><topic>critical path programming</topic><topic>Linear programming</topic><topic>Mathematical analysis</topic><topic>PERT</topic><topic>PERT-cost</topic><topic>Project evaluation</topic><topic>Project management</topic><topic>Studies</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Gumusoglu, Sevkinaz</creatorcontrib><creatorcontrib>Tutek, Hulya</creatorcontrib><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Technology Research Database</collection><collection>Materials Research Database</collection><collection>ProQuest Computer Science Collection</collection><jtitle>International journal of project management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Gumusoglu, Sevkinaz</au><au>Tutek, Hulya</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>An analysis method in project management using primal-dual relationships</atitle><jtitle>International journal of project management</jtitle><date>1998-10-01</date><risdate>1998</risdate><volume>16</volume><issue>5</issue><spage>321</spage><epage>327</epage><pages>321-327</pages><issn>0263-7863</issn><eissn>1873-4634</eissn><abstract>In the analysis of network models, project evaluation and review technique (PERT) and critical path method (CPM) are the methods which have been widely applied to industrial project planning and control in practice. PERT which is a large scale model, analyzes the project using a standard forward-backward analysis method. Further, quantitative models have been developed for shortening total project time by determining appropriate activities for crashing with a minimum cost. In this study; to solve the project planning and control problems, a new method of analysis is introduced with the help of the LP model using primal-dual relationships. This method, tested on middle scale problems has proved to be more efficient in terms of mathematical calculations than traditional PERT-CPM solutions, simplex solutions to LP formulation and Out-of-Kilter method. The method of analysis proposed has been applied to a holiday village project with a 370 bed capacity. The result is a minimum cost program with the total project time of 10 months.</abstract><cop>Kidlington</cop><pub>Elsevier Ltd</pub><doi>10.1016/S0263-7863(97)00057-4</doi><tpages>7</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0263-7863 |
ispartof | International journal of project management, 1998-10, Vol.16 (5), p.321-327 |
issn | 0263-7863 1873-4634 |
language | eng |
recordid | cdi_proquest_journals_211120304 |
source | Access via ScienceDirect (Elsevier) |
subjects | Construction industry Critical path critical path programming Linear programming Mathematical analysis PERT PERT-cost Project evaluation Project management Studies |
title | An analysis method in project management using primal-dual relationships |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T21%3A46%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=An%20analysis%20method%20in%20project%20management%20using%20primal-dual%20relationships&rft.jtitle=International%20journal%20of%20project%20management&rft.au=Gumusoglu,%20Sevkinaz&rft.date=1998-10-01&rft.volume=16&rft.issue=5&rft.spage=321&rft.epage=327&rft.pages=321-327&rft.issn=0263-7863&rft.eissn=1873-4634&rft_id=info:doi/10.1016/S0263-7863(97)00057-4&rft_dat=%3Cproquest_cross%3E40356842%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=211120304&rft_id=info:pmid/&rft_els_id=S0263786397000574&rfr_iscdi=true |