A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user’s perspective

PurposeThe purpose of this paper is to define and analyze causal factors shaping the effectiveness of engineering, procurement and construction (EPC) major projects in meeting the product objectives, from the end-user’s perspective.Design/methodology/approachAn online survey questionnaire was develo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Engineering, construction, and architectural management construction, and architectural management, 2018-09, Vol.25 (9), p.1226-1252
Hauptverfasser: Aldhaheri, Mohamed, Bakchan, Amal, Sandhu, Maqsood Ahmad
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 1252
container_issue 9
container_start_page 1226
container_title Engineering, construction, and architectural management
container_volume 25
creator Aldhaheri, Mohamed
Bakchan, Amal
Sandhu, Maqsood Ahmad
description PurposeThe purpose of this paper is to define and analyze causal factors shaping the effectiveness of engineering, procurement and construction (EPC) major projects in meeting the product objectives, from the end-user’s perspective.Design/methodology/approachAn online survey questionnaire was developed and administered to end-users working in major oil and gas projects. Data collection process was initiated on, around 275 end-users, and 213 responses were received, achieving a high response rate of 77 percent.FindingsThe results indicate that both alignment of objectives and end-user’s engagement factors exhibit a positive influence on effectiveness of EPC, with the former having higher contribution than the latter. In this context, the product success triangle reveals higher preference of the end-user’s team toward quality than schedule and cost objectives.Research limitations/implicationsShifting the efforts of involving the end-user forward in time, starting from the planning stage, alleviates the adverse impacts of design changes as well as increases the ability to save cost, improve performance and increase end-user’s satisfaction.Practical implicationsThe model raises the awareness of oil and gas industry practitioners toward the critical factors influencing the project effectiveness and proposes useful techniques for maintaining proper alignment between project and product objectives as well as facilitating end-user’s engagement at the site level. As such, it can serve as a motivation tool for aligning the objectives and acknowledging the engagement, with the aim of achieving the product success.Originality/valueThe effectiveness of EPC structural model was developed and tested using PLS–structural equation modeling statistical technique. The interpretation of the structural model demonstrated that both end-user’s engagement and alignment of objectives are essential to successfully achieve project effectiveness.
doi_str_mv 10.1108/ECAM-07-2017-0130
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2109169800</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2109169800</sourcerecordid><originalsourceid>FETCH-LOGICAL-c225t-eefbe6647a2d27b699ae2964bb026ec0e5448ec6071b8f2521dae04024704f1a3</originalsourceid><addsrcrecordid>eNotkF1LwzAYhYMoOKc_wLuANwpW36Rt2lyOMT9gohcK3oU0fTNb1nRLWmH_3pR5dS7O4TnwEHLN4IExKB9Xy8VbAkXCgRUJsBROyIylIk94yr9PyQykkImUZXlOLkJoAViZ5emMHBY0DH40w-j1luJ-1EPTO9r1NW6p7T1F96OdadyGorVohuYXHYZAexurTeMQfSzv6c73ZvTYoRuodjU1vTuCJ9zt6mN5RzvdRmActpETLsmZ1duAV_85J19Pq8_lS7J-f35dLtaJ4TwfEkRboRBZoXnNi0pIqZFLkVUVcIEGMM-yEo2AglWl5TlntUbIgGcFZJbpdE5ujtx4vB8xDKrtR-_ipeIMJBOyBIgrdlwZ34fg0aqdbzrtD4qBmgyrybCCQk2G1WQ4_QOIQXBp</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2109169800</pqid></control><display><type>article</type><title>A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user’s perspective</title><source>Emerald A-Z Current Journals</source><creator>Aldhaheri, Mohamed ; Bakchan, Amal ; Sandhu, Maqsood Ahmad</creator><creatorcontrib>Aldhaheri, Mohamed ; Bakchan, Amal ; Sandhu, Maqsood Ahmad</creatorcontrib><description>PurposeThe purpose of this paper is to define and analyze causal factors shaping the effectiveness of engineering, procurement and construction (EPC) major projects in meeting the product objectives, from the end-user’s perspective.Design/methodology/approachAn online survey questionnaire was developed and administered to end-users working in major oil and gas projects. Data collection process was initiated on, around 275 end-users, and 213 responses were received, achieving a high response rate of 77 percent.FindingsThe results indicate that both alignment of objectives and end-user’s engagement factors exhibit a positive influence on effectiveness of EPC, with the former having higher contribution than the latter. In this context, the product success triangle reveals higher preference of the end-user’s team toward quality than schedule and cost objectives.Research limitations/implicationsShifting the efforts of involving the end-user forward in time, starting from the planning stage, alleviates the adverse impacts of design changes as well as increases the ability to save cost, improve performance and increase end-user’s satisfaction.Practical implicationsThe model raises the awareness of oil and gas industry practitioners toward the critical factors influencing the project effectiveness and proposes useful techniques for maintaining proper alignment between project and product objectives as well as facilitating end-user’s engagement at the site level. As such, it can serve as a motivation tool for aligning the objectives and acknowledging the engagement, with the aim of achieving the product success.Originality/valueThe effectiveness of EPC structural model was developed and tested using PLS–structural equation modeling statistical technique. The interpretation of the structural model demonstrated that both end-user’s engagement and alignment of objectives are essential to successfully achieve project effectiveness.</description><identifier>ISSN: 0969-9988</identifier><identifier>EISSN: 1365-232X</identifier><identifier>DOI: 10.1108/ECAM-07-2017-0130</identifier><language>eng</language><publisher>Bradford: Emerald Group Publishing Limited</publisher><subject>Alignment ; Construction engineering ; Construction industry ; Data acquisition ; Efficiency ; Engineering ; Engineering procurement &amp; construction ; Gas industry ; Literature reviews ; Objectives ; Performance enhancement ; Procurement ; Project management ; Short term ; Strategic planning ; Structural equation modeling ; Success ; Variables</subject><ispartof>Engineering, construction, and architectural management, 2018-09, Vol.25 (9), p.1226-1252</ispartof><rights>Emerald Publishing Limited 2018</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c225t-eefbe6647a2d27b699ae2964bb026ec0e5448ec6071b8f2521dae04024704f1a3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,961,27903,27904</link.rule.ids></links><search><creatorcontrib>Aldhaheri, Mohamed</creatorcontrib><creatorcontrib>Bakchan, Amal</creatorcontrib><creatorcontrib>Sandhu, Maqsood Ahmad</creatorcontrib><title>A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user’s perspective</title><title>Engineering, construction, and architectural management</title><description>PurposeThe purpose of this paper is to define and analyze causal factors shaping the effectiveness of engineering, procurement and construction (EPC) major projects in meeting the product objectives, from the end-user’s perspective.Design/methodology/approachAn online survey questionnaire was developed and administered to end-users working in major oil and gas projects. Data collection process was initiated on, around 275 end-users, and 213 responses were received, achieving a high response rate of 77 percent.FindingsThe results indicate that both alignment of objectives and end-user’s engagement factors exhibit a positive influence on effectiveness of EPC, with the former having higher contribution than the latter. In this context, the product success triangle reveals higher preference of the end-user’s team toward quality than schedule and cost objectives.Research limitations/implicationsShifting the efforts of involving the end-user forward in time, starting from the planning stage, alleviates the adverse impacts of design changes as well as increases the ability to save cost, improve performance and increase end-user’s satisfaction.Practical implicationsThe model raises the awareness of oil and gas industry practitioners toward the critical factors influencing the project effectiveness and proposes useful techniques for maintaining proper alignment between project and product objectives as well as facilitating end-user’s engagement at the site level. As such, it can serve as a motivation tool for aligning the objectives and acknowledging the engagement, with the aim of achieving the product success.Originality/valueThe effectiveness of EPC structural model was developed and tested using PLS–structural equation modeling statistical technique. The interpretation of the structural model demonstrated that both end-user’s engagement and alignment of objectives are essential to successfully achieve project effectiveness.</description><subject>Alignment</subject><subject>Construction engineering</subject><subject>Construction industry</subject><subject>Data acquisition</subject><subject>Efficiency</subject><subject>Engineering</subject><subject>Engineering procurement &amp; construction</subject><subject>Gas industry</subject><subject>Literature reviews</subject><subject>Objectives</subject><subject>Performance enhancement</subject><subject>Procurement</subject><subject>Project management</subject><subject>Short term</subject><subject>Strategic planning</subject><subject>Structural equation modeling</subject><subject>Success</subject><subject>Variables</subject><issn>0969-9988</issn><issn>1365-232X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><sourceid>AFKRA</sourceid><sourceid>AZQEC</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><sourceid>GNUQQ</sourceid><recordid>eNotkF1LwzAYhYMoOKc_wLuANwpW36Rt2lyOMT9gohcK3oU0fTNb1nRLWmH_3pR5dS7O4TnwEHLN4IExKB9Xy8VbAkXCgRUJsBROyIylIk94yr9PyQykkImUZXlOLkJoAViZ5emMHBY0DH40w-j1luJ-1EPTO9r1NW6p7T1F96OdadyGorVohuYXHYZAexurTeMQfSzv6c73ZvTYoRuodjU1vTuCJ9zt6mN5RzvdRmActpETLsmZ1duAV_85J19Pq8_lS7J-f35dLtaJ4TwfEkRboRBZoXnNi0pIqZFLkVUVcIEGMM-yEo2AglWl5TlntUbIgGcFZJbpdE5ujtx4vB8xDKrtR-_ipeIMJBOyBIgrdlwZ34fg0aqdbzrtD4qBmgyrybCCQk2G1WQ4_QOIQXBp</recordid><startdate>20180920</startdate><enddate>20180920</enddate><creator>Aldhaheri, Mohamed</creator><creator>Bakchan, Amal</creator><creator>Sandhu, Maqsood Ahmad</creator><general>Emerald Group Publishing Limited</general><scope>AAYXX</scope><scope>CITATION</scope><scope>0U~</scope><scope>1-H</scope><scope>7TA</scope><scope>7WY</scope><scope>7WZ</scope><scope>7XB</scope><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BEZIV</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FR3</scope><scope>F~G</scope><scope>GNUQQ</scope><scope>HCIFZ</scope><scope>JG9</scope><scope>K6~</scope><scope>KR7</scope><scope>L.-</scope><scope>L.0</scope><scope>L6V</scope><scope>M0C</scope><scope>M2P</scope><scope>M7S</scope><scope>PQBIZ</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PTHSS</scope><scope>Q9U</scope></search><sort><creationdate>20180920</creationdate><title>A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects</title><author>Aldhaheri, Mohamed ; Bakchan, Amal ; Sandhu, Maqsood Ahmad</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c225t-eefbe6647a2d27b699ae2964bb026ec0e5448ec6071b8f2521dae04024704f1a3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Alignment</topic><topic>Construction engineering</topic><topic>Construction industry</topic><topic>Data acquisition</topic><topic>Efficiency</topic><topic>Engineering</topic><topic>Engineering procurement &amp; construction</topic><topic>Gas industry</topic><topic>Literature reviews</topic><topic>Objectives</topic><topic>Performance enhancement</topic><topic>Procurement</topic><topic>Project management</topic><topic>Short term</topic><topic>Strategic planning</topic><topic>Structural equation modeling</topic><topic>Success</topic><topic>Variables</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Aldhaheri, Mohamed</creatorcontrib><creatorcontrib>Bakchan, Amal</creatorcontrib><creatorcontrib>Sandhu, Maqsood Ahmad</creatorcontrib><collection>CrossRef</collection><collection>Global News &amp; ABI/Inform Professional</collection><collection>Trade PRO</collection><collection>Materials Business File</collection><collection>ABI/INFORM Collection</collection><collection>ABI/INFORM Global (PDF only)</collection><collection>ProQuest Central (purchase pre-March 2016)</collection><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Business Premium Collection</collection><collection>Technology Collection (ProQuest)</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>Engineering Research Database</collection><collection>ABI/INFORM Global (Corporate)</collection><collection>ProQuest Central Student</collection><collection>SciTech Premium Collection</collection><collection>Materials Research Database</collection><collection>ProQuest Business Collection</collection><collection>Civil Engineering Abstracts</collection><collection>ABI/INFORM Professional Advanced</collection><collection>ABI/INFORM Professional Standard</collection><collection>ProQuest Engineering Collection</collection><collection>ABI/INFORM Global</collection><collection>Science Database</collection><collection>Engineering Database</collection><collection>One Business (ProQuest)</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>Engineering Collection</collection><collection>ProQuest Central Basic</collection><jtitle>Engineering, construction, and architectural management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Aldhaheri, Mohamed</au><au>Bakchan, Amal</au><au>Sandhu, Maqsood Ahmad</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user’s perspective</atitle><jtitle>Engineering, construction, and architectural management</jtitle><date>2018-09-20</date><risdate>2018</risdate><volume>25</volume><issue>9</issue><spage>1226</spage><epage>1252</epage><pages>1226-1252</pages><issn>0969-9988</issn><eissn>1365-232X</eissn><abstract>PurposeThe purpose of this paper is to define and analyze causal factors shaping the effectiveness of engineering, procurement and construction (EPC) major projects in meeting the product objectives, from the end-user’s perspective.Design/methodology/approachAn online survey questionnaire was developed and administered to end-users working in major oil and gas projects. Data collection process was initiated on, around 275 end-users, and 213 responses were received, achieving a high response rate of 77 percent.FindingsThe results indicate that both alignment of objectives and end-user’s engagement factors exhibit a positive influence on effectiveness of EPC, with the former having higher contribution than the latter. In this context, the product success triangle reveals higher preference of the end-user’s team toward quality than schedule and cost objectives.Research limitations/implicationsShifting the efforts of involving the end-user forward in time, starting from the planning stage, alleviates the adverse impacts of design changes as well as increases the ability to save cost, improve performance and increase end-user’s satisfaction.Practical implicationsThe model raises the awareness of oil and gas industry practitioners toward the critical factors influencing the project effectiveness and proposes useful techniques for maintaining proper alignment between project and product objectives as well as facilitating end-user’s engagement at the site level. As such, it can serve as a motivation tool for aligning the objectives and acknowledging the engagement, with the aim of achieving the product success.Originality/valueThe effectiveness of EPC structural model was developed and tested using PLS–structural equation modeling statistical technique. The interpretation of the structural model demonstrated that both end-user’s engagement and alignment of objectives are essential to successfully achieve project effectiveness.</abstract><cop>Bradford</cop><pub>Emerald Group Publishing Limited</pub><doi>10.1108/ECAM-07-2017-0130</doi><tpages>27</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0969-9988
ispartof Engineering, construction, and architectural management, 2018-09, Vol.25 (9), p.1226-1252
issn 0969-9988
1365-232X
language eng
recordid cdi_proquest_journals_2109169800
source Emerald A-Z Current Journals
subjects Alignment
Construction engineering
Construction industry
Data acquisition
Efficiency
Engineering
Engineering procurement & construction
Gas industry
Literature reviews
Objectives
Performance enhancement
Procurement
Project management
Short term
Strategic planning
Structural equation modeling
Success
Variables
title A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects: End-user’s perspective
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T01%3A17%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20structural%20equation%20model%20for%20enhancing%20effectiveness%20of%20engineering,%20procurement%20and%20construction%20(EPC)%20major%20projects:%20End-user%E2%80%99s%20perspective&rft.jtitle=Engineering,%20construction,%20and%20architectural%20management&rft.au=Aldhaheri,%20Mohamed&rft.date=2018-09-20&rft.volume=25&rft.issue=9&rft.spage=1226&rft.epage=1252&rft.pages=1226-1252&rft.issn=0969-9988&rft.eissn=1365-232X&rft_id=info:doi/10.1108/ECAM-07-2017-0130&rft_dat=%3Cproquest_cross%3E2109169800%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2109169800&rft_id=info:pmid/&rfr_iscdi=true