Impact of the Planning from the Kanban System on the Company’s Operating Benefits
This article reports a model regarding the structural equations of the impact of the planning phase and the benefits acquired in the implementation of the kanban system. It begins with a literature review of the activities of the planning phase, based on which a questionnaire was developed and appli...
Gespeichert in:
Veröffentlicht in: | Sustainability 2018-07, Vol.10 (7), p.2506 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | 7 |
container_start_page | 2506 |
container_title | Sustainability |
container_volume | 10 |
creator | Mojarro-Magaña, María Olguín-Tiznado, Jesús García-Alcaraz, Jorge Camargo-Wilson, Claudia López-Barreras, Juan Pérez-López, Rubén |
description | This article reports a model regarding the structural equations of the impact of the planning phase and the benefits acquired in the implementation of the kanban system. It begins with a literature review of the activities of the planning phase, based on which a questionnaire was developed and applied in manufacturing companies in the state of Baja California, in the municipalities of Ensenada, Tijuana, Tecate, and Mexicali. The responses were obtained from 118 questionnaires and were validated by the Cronbach’s alpha index for internal validity and the R-squared index for predictive validity. A model of the structural equations of the planning phase was developed and validated through three latent variables, namely, human resources, preliminary analysis, and kanban integration, which correspond to 22 activities and one variable that integrate 11 operational benefits. The model shows six hypotheses to verify the causal relationships between these variables. Partial least-squares algorithms are used to validate the hypothesis, and the results indicate that the preliminary analysis is the basis for the success of the implementation of the kanban in the planning stage, through the application of activities, such as 5’s, value stream mapping (VSM), material handling, flow diagram, and visual aids with a sustainable approach, according to the efficient flow of materials and minimum downtime. |
doi_str_mv | 10.3390/su10072506 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2108862147</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2108862147</sourcerecordid><originalsourceid>FETCH-LOGICAL-c295t-3a5a6ddca8e2fd0d6c624f75a3147fe556ab66da934caa9c932b0995817ed74f3</originalsourceid><addsrcrecordid>eNpNUM1KAzEYDKJgqb34BAFvwmp-NtnNURd_ioUK1fPyNZvolm6yJumhN1_D1_NJ3LaCzuUbhpn5YBA6p-SKc0Wu44YSUjBB5BEaMVLQjBJBjv_xUzSJcUUGcE4VlSO0mHY96IS9xend4Oc1ONe6N2yD7_bKE7glOLzYxmQ67N1erPyQctvvz6-I570JkHaZW-OMbVM8QycW1tFMfu8Yvd7fvVSP2Wz-MK1uZplmSqSMgwDZNBpKw2xDGqkly20hgNO8sEYICUspG1A81wBKK86WRClR0sI0RW75GF0cevvgPzYmpnrlN8ENL2tGSVlKNhQNrsuDSwcfYzC27kPbQdjWlNS73eq_3fgPTORgJA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2108862147</pqid></control><display><type>article</type><title>Impact of the Planning from the Kanban System on the Company’s Operating Benefits</title><source>MDPI - Multidisciplinary Digital Publishing Institute</source><source>EZB-FREE-00999 freely available EZB journals</source><creator>Mojarro-Magaña, María ; Olguín-Tiznado, Jesús ; García-Alcaraz, Jorge ; Camargo-Wilson, Claudia ; López-Barreras, Juan ; Pérez-López, Rubén</creator><creatorcontrib>Mojarro-Magaña, María ; Olguín-Tiznado, Jesús ; García-Alcaraz, Jorge ; Camargo-Wilson, Claudia ; López-Barreras, Juan ; Pérez-López, Rubén</creatorcontrib><description>This article reports a model regarding the structural equations of the impact of the planning phase and the benefits acquired in the implementation of the kanban system. It begins with a literature review of the activities of the planning phase, based on which a questionnaire was developed and applied in manufacturing companies in the state of Baja California, in the municipalities of Ensenada, Tijuana, Tecate, and Mexicali. The responses were obtained from 118 questionnaires and were validated by the Cronbach’s alpha index for internal validity and the R-squared index for predictive validity. A model of the structural equations of the planning phase was developed and validated through three latent variables, namely, human resources, preliminary analysis, and kanban integration, which correspond to 22 activities and one variable that integrate 11 operational benefits. The model shows six hypotheses to verify the causal relationships between these variables. Partial least-squares algorithms are used to validate the hypothesis, and the results indicate that the preliminary analysis is the basis for the success of the implementation of the kanban in the planning stage, through the application of activities, such as 5’s, value stream mapping (VSM), material handling, flow diagram, and visual aids with a sustainable approach, according to the efficient flow of materials and minimum downtime.</description><identifier>ISSN: 2071-1050</identifier><identifier>EISSN: 2071-1050</identifier><identifier>DOI: 10.3390/su10072506</identifier><language>eng</language><publisher>Basel: MDPI AG</publisher><subject>Downtime ; Fear & phobias ; Inventory ; Just in time ; Kanbans ; Lean manufacturing ; Literature reviews ; Materials handling ; Municipalities ; Planning ; Small & medium sized enterprises-SME ; Structural equation modeling ; Sustainability ; Visual aids ; Work stations</subject><ispartof>Sustainability, 2018-07, Vol.10 (7), p.2506</ispartof><rights>2018 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c295t-3a5a6ddca8e2fd0d6c624f75a3147fe556ab66da934caa9c932b0995817ed74f3</citedby><cites>FETCH-LOGICAL-c295t-3a5a6ddca8e2fd0d6c624f75a3147fe556ab66da934caa9c932b0995817ed74f3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids></links><search><creatorcontrib>Mojarro-Magaña, María</creatorcontrib><creatorcontrib>Olguín-Tiznado, Jesús</creatorcontrib><creatorcontrib>García-Alcaraz, Jorge</creatorcontrib><creatorcontrib>Camargo-Wilson, Claudia</creatorcontrib><creatorcontrib>López-Barreras, Juan</creatorcontrib><creatorcontrib>Pérez-López, Rubén</creatorcontrib><title>Impact of the Planning from the Kanban System on the Company’s Operating Benefits</title><title>Sustainability</title><description>This article reports a model regarding the structural equations of the impact of the planning phase and the benefits acquired in the implementation of the kanban system. It begins with a literature review of the activities of the planning phase, based on which a questionnaire was developed and applied in manufacturing companies in the state of Baja California, in the municipalities of Ensenada, Tijuana, Tecate, and Mexicali. The responses were obtained from 118 questionnaires and were validated by the Cronbach’s alpha index for internal validity and the R-squared index for predictive validity. A model of the structural equations of the planning phase was developed and validated through three latent variables, namely, human resources, preliminary analysis, and kanban integration, which correspond to 22 activities and one variable that integrate 11 operational benefits. The model shows six hypotheses to verify the causal relationships between these variables. Partial least-squares algorithms are used to validate the hypothesis, and the results indicate that the preliminary analysis is the basis for the success of the implementation of the kanban in the planning stage, through the application of activities, such as 5’s, value stream mapping (VSM), material handling, flow diagram, and visual aids with a sustainable approach, according to the efficient flow of materials and minimum downtime.</description><subject>Downtime</subject><subject>Fear & phobias</subject><subject>Inventory</subject><subject>Just in time</subject><subject>Kanbans</subject><subject>Lean manufacturing</subject><subject>Literature reviews</subject><subject>Materials handling</subject><subject>Municipalities</subject><subject>Planning</subject><subject>Small & medium sized enterprises-SME</subject><subject>Structural equation modeling</subject><subject>Sustainability</subject><subject>Visual aids</subject><subject>Work stations</subject><issn>2071-1050</issn><issn>2071-1050</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><sourceid>ABUWG</sourceid><sourceid>AFKRA</sourceid><sourceid>AZQEC</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><recordid>eNpNUM1KAzEYDKJgqb34BAFvwmp-NtnNURd_ioUK1fPyNZvolm6yJumhN1_D1_NJ3LaCzuUbhpn5YBA6p-SKc0Wu44YSUjBB5BEaMVLQjBJBjv_xUzSJcUUGcE4VlSO0mHY96IS9xend4Oc1ONe6N2yD7_bKE7glOLzYxmQ67N1erPyQctvvz6-I570JkHaZW-OMbVM8QycW1tFMfu8Yvd7fvVSP2Wz-MK1uZplmSqSMgwDZNBpKw2xDGqkly20hgNO8sEYICUspG1A81wBKK86WRClR0sI0RW75GF0cevvgPzYmpnrlN8ENL2tGSVlKNhQNrsuDSwcfYzC27kPbQdjWlNS73eq_3fgPTORgJA</recordid><startdate>20180717</startdate><enddate>20180717</enddate><creator>Mojarro-Magaña, María</creator><creator>Olguín-Tiznado, Jesús</creator><creator>García-Alcaraz, Jorge</creator><creator>Camargo-Wilson, Claudia</creator><creator>López-Barreras, Juan</creator><creator>Pérez-López, Rubén</creator><general>MDPI AG</general><scope>AAYXX</scope><scope>CITATION</scope><scope>4U-</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope></search><sort><creationdate>20180717</creationdate><title>Impact of the Planning from the Kanban System on the Company’s Operating Benefits</title><author>Mojarro-Magaña, María ; Olguín-Tiznado, Jesús ; García-Alcaraz, Jorge ; Camargo-Wilson, Claudia ; López-Barreras, Juan ; Pérez-López, Rubén</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c295t-3a5a6ddca8e2fd0d6c624f75a3147fe556ab66da934caa9c932b0995817ed74f3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Downtime</topic><topic>Fear & phobias</topic><topic>Inventory</topic><topic>Just in time</topic><topic>Kanbans</topic><topic>Lean manufacturing</topic><topic>Literature reviews</topic><topic>Materials handling</topic><topic>Municipalities</topic><topic>Planning</topic><topic>Small & medium sized enterprises-SME</topic><topic>Structural equation modeling</topic><topic>Sustainability</topic><topic>Visual aids</topic><topic>Work stations</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Mojarro-Magaña, María</creatorcontrib><creatorcontrib>Olguín-Tiznado, Jesús</creatorcontrib><creatorcontrib>García-Alcaraz, Jorge</creatorcontrib><creatorcontrib>Camargo-Wilson, Claudia</creatorcontrib><creatorcontrib>López-Barreras, Juan</creatorcontrib><creatorcontrib>Pérez-López, Rubén</creatorcontrib><collection>CrossRef</collection><collection>University Readers</collection><collection>ProQuest Central (Alumni Edition)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><jtitle>Sustainability</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Mojarro-Magaña, María</au><au>Olguín-Tiznado, Jesús</au><au>García-Alcaraz, Jorge</au><au>Camargo-Wilson, Claudia</au><au>López-Barreras, Juan</au><au>Pérez-López, Rubén</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Impact of the Planning from the Kanban System on the Company’s Operating Benefits</atitle><jtitle>Sustainability</jtitle><date>2018-07-17</date><risdate>2018</risdate><volume>10</volume><issue>7</issue><spage>2506</spage><pages>2506-</pages><issn>2071-1050</issn><eissn>2071-1050</eissn><abstract>This article reports a model regarding the structural equations of the impact of the planning phase and the benefits acquired in the implementation of the kanban system. It begins with a literature review of the activities of the planning phase, based on which a questionnaire was developed and applied in manufacturing companies in the state of Baja California, in the municipalities of Ensenada, Tijuana, Tecate, and Mexicali. The responses were obtained from 118 questionnaires and were validated by the Cronbach’s alpha index for internal validity and the R-squared index for predictive validity. A model of the structural equations of the planning phase was developed and validated through three latent variables, namely, human resources, preliminary analysis, and kanban integration, which correspond to 22 activities and one variable that integrate 11 operational benefits. The model shows six hypotheses to verify the causal relationships between these variables. Partial least-squares algorithms are used to validate the hypothesis, and the results indicate that the preliminary analysis is the basis for the success of the implementation of the kanban in the planning stage, through the application of activities, such as 5’s, value stream mapping (VSM), material handling, flow diagram, and visual aids with a sustainable approach, according to the efficient flow of materials and minimum downtime.</abstract><cop>Basel</cop><pub>MDPI AG</pub><doi>10.3390/su10072506</doi><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2071-1050 |
ispartof | Sustainability, 2018-07, Vol.10 (7), p.2506 |
issn | 2071-1050 2071-1050 |
language | eng |
recordid | cdi_proquest_journals_2108862147 |
source | MDPI - Multidisciplinary Digital Publishing Institute; EZB-FREE-00999 freely available EZB journals |
subjects | Downtime Fear & phobias Inventory Just in time Kanbans Lean manufacturing Literature reviews Materials handling Municipalities Planning Small & medium sized enterprises-SME Structural equation modeling Sustainability Visual aids Work stations |
title | Impact of the Planning from the Kanban System on the Company’s Operating Benefits |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T10%3A10%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Impact%20of%20the%20Planning%20from%20the%20Kanban%20System%20on%20the%20Company%E2%80%99s%20Operating%20Benefits&rft.jtitle=Sustainability&rft.au=Mojarro-Maga%C3%B1a,%20Mar%C3%ADa&rft.date=2018-07-17&rft.volume=10&rft.issue=7&rft.spage=2506&rft.pages=2506-&rft.issn=2071-1050&rft.eissn=2071-1050&rft_id=info:doi/10.3390/su10072506&rft_dat=%3Cproquest_cross%3E2108862147%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2108862147&rft_id=info:pmid/&rfr_iscdi=true |