Improvement of a Splicing Machine to Decrease Abrupt Tension Changes and Tail Defects during the Roll Exchange Process in a Roll-to-Roll Manufacturing System

The use of the splicing system is necessary to exchange a fully unwound roll to a new one without stopping the roll-to-roll manufacturing machine. However, abrupt tension changes and tail defects, which is an overlap of completely unwound films with films in the process of being unwound, could occur...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of precision engineering and manufacturing 2018-08, Vol.19 (8), p.1155-1161
Hauptverfasser: Lee, Jongsu, Lee, Changwoo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 1161
container_issue 8
container_start_page 1155
container_title International journal of precision engineering and manufacturing
container_volume 19
creator Lee, Jongsu
Lee, Changwoo
description The use of the splicing system is necessary to exchange a fully unwound roll to a new one without stopping the roll-to-roll manufacturing machine. However, abrupt tension changes and tail defects, which is an overlap of completely unwound films with films in the process of being unwound, could occur during the roll exchange phase causing film loss and deterioration of product quality. Herein, we improved the splicing machine in an industrial scale R2R manufacturing system to decrease abrupt tension errors and tail defects. First, the effects of the factors generating the tail defects in the splicing machine on the net tail lengths were analyzed using designed mathematical models. Furthermore, the reason for the abrupt tension disturbance in the roll exchange process was determined. Based on the analyses, a passive dancer system was applied to the unwinding section to attenuate the tension error, and the time interval between the pressing and cutting phases was decreased by changing the signal processing method of the previous version of the splicing machine. Experimental results showed that the abrupt tension change was decreased by an average of 46.5%, while tail lengths were decreased by more than 2.5 times, thereby verifying the superior performance of the upgraded splicing machine.
doi_str_mv 10.1007/s12541-018-0136-6
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2086324057</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2086324057</sourcerecordid><originalsourceid>FETCH-LOGICAL-c350t-a691d669ef71fc735a47ff05276e146f4d9dc371a7ab7ed365e95afa9108ef823</originalsourceid><addsrcrecordid>eNp1kc1KJDEUhYvBgRH1AdwFZh3NTyWpWkr7C4oytuuQTt3YNVQnZZISfZh510lZgisXIYH7nXO4OVV1TMkJJUSdJspETTGhTTlcYvmj2meECFxLwvbKm_EaK9HyX9VRSv2GcMokF43cr_7d7MYYXmEHPqPgkEGP49Db3j-jO2O3vQeUAzoHG8EkQGebOI0ZrcGnPni02hr_DAkZ36G16YcCOrA5oW6Ks0XeAvoThgFdvNkPFD3EYCEl1PsSNY9wDvgDuTN-csbmRfn4njLsDqufzgwJjj7vg-rp8mK9usa391c3q7NbbLkgGRvZ0k7KFpyiziouTK2cI4IpCbSWru7aznJFjTIbBR2XAlphnGkpacA1jB9Uvxff8hcvE6Ss_4Yp-hKpGWkkZzURqlB0oWwMKUVweoz9zsR3TYmei9BLEboUoecitCwatmjSOO8F8cv5e9F_N4eMhA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2086324057</pqid></control><display><type>article</type><title>Improvement of a Splicing Machine to Decrease Abrupt Tension Changes and Tail Defects during the Roll Exchange Process in a Roll-to-Roll Manufacturing System</title><source>Springer Nature - Complete Springer Journals</source><creator>Lee, Jongsu ; Lee, Changwoo</creator><creatorcontrib>Lee, Jongsu ; Lee, Changwoo</creatorcontrib><description>The use of the splicing system is necessary to exchange a fully unwound roll to a new one without stopping the roll-to-roll manufacturing machine. However, abrupt tension changes and tail defects, which is an overlap of completely unwound films with films in the process of being unwound, could occur during the roll exchange phase causing film loss and deterioration of product quality. Herein, we improved the splicing machine in an industrial scale R2R manufacturing system to decrease abrupt tension errors and tail defects. First, the effects of the factors generating the tail defects in the splicing machine on the net tail lengths were analyzed using designed mathematical models. Furthermore, the reason for the abrupt tension disturbance in the roll exchange process was determined. Based on the analyses, a passive dancer system was applied to the unwinding section to attenuate the tension error, and the time interval between the pressing and cutting phases was decreased by changing the signal processing method of the previous version of the splicing machine. Experimental results showed that the abrupt tension change was decreased by an average of 46.5%, while tail lengths were decreased by more than 2.5 times, thereby verifying the superior performance of the upgraded splicing machine.</description><identifier>ISSN: 2234-7593</identifier><identifier>EISSN: 2005-4602</identifier><identifier>DOI: 10.1007/s12541-018-0136-6</identifier><language>eng</language><publisher>Seoul: Korean Society for Precision Engineering</publisher><subject>Defects ; Engineering ; Exchanging ; Industrial and Production Engineering ; Materials Science ; Mathematical models ; Regular Paper ; Signal processing ; Splicing</subject><ispartof>International journal of precision engineering and manufacturing, 2018-08, Vol.19 (8), p.1155-1161</ispartof><rights>Korean Society for Precision Engineering and Springer-Verlag GmbH Germany, part of Springer Nature 2018</rights><rights>Copyright Springer Science &amp; Business Media 2018</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c350t-a691d669ef71fc735a47ff05276e146f4d9dc371a7ab7ed365e95afa9108ef823</citedby><cites>FETCH-LOGICAL-c350t-a691d669ef71fc735a47ff05276e146f4d9dc371a7ab7ed365e95afa9108ef823</cites><orcidid>0000-0001-9862-2833</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.1007/s12541-018-0136-6$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.1007/s12541-018-0136-6$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,776,780,27901,27902,41464,42533,51294</link.rule.ids></links><search><creatorcontrib>Lee, Jongsu</creatorcontrib><creatorcontrib>Lee, Changwoo</creatorcontrib><title>Improvement of a Splicing Machine to Decrease Abrupt Tension Changes and Tail Defects during the Roll Exchange Process in a Roll-to-Roll Manufacturing System</title><title>International journal of precision engineering and manufacturing</title><addtitle>Int. J. Precis. Eng. Manuf</addtitle><description>The use of the splicing system is necessary to exchange a fully unwound roll to a new one without stopping the roll-to-roll manufacturing machine. However, abrupt tension changes and tail defects, which is an overlap of completely unwound films with films in the process of being unwound, could occur during the roll exchange phase causing film loss and deterioration of product quality. Herein, we improved the splicing machine in an industrial scale R2R manufacturing system to decrease abrupt tension errors and tail defects. First, the effects of the factors generating the tail defects in the splicing machine on the net tail lengths were analyzed using designed mathematical models. Furthermore, the reason for the abrupt tension disturbance in the roll exchange process was determined. Based on the analyses, a passive dancer system was applied to the unwinding section to attenuate the tension error, and the time interval between the pressing and cutting phases was decreased by changing the signal processing method of the previous version of the splicing machine. Experimental results showed that the abrupt tension change was decreased by an average of 46.5%, while tail lengths were decreased by more than 2.5 times, thereby verifying the superior performance of the upgraded splicing machine.</description><subject>Defects</subject><subject>Engineering</subject><subject>Exchanging</subject><subject>Industrial and Production Engineering</subject><subject>Materials Science</subject><subject>Mathematical models</subject><subject>Regular Paper</subject><subject>Signal processing</subject><subject>Splicing</subject><issn>2234-7593</issn><issn>2005-4602</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><recordid>eNp1kc1KJDEUhYvBgRH1AdwFZh3NTyWpWkr7C4oytuuQTt3YNVQnZZISfZh510lZgisXIYH7nXO4OVV1TMkJJUSdJspETTGhTTlcYvmj2meECFxLwvbKm_EaK9HyX9VRSv2GcMokF43cr_7d7MYYXmEHPqPgkEGP49Db3j-jO2O3vQeUAzoHG8EkQGebOI0ZrcGnPni02hr_DAkZ36G16YcCOrA5oW6Ks0XeAvoThgFdvNkPFD3EYCEl1PsSNY9wDvgDuTN-csbmRfn4njLsDqufzgwJjj7vg-rp8mK9usa391c3q7NbbLkgGRvZ0k7KFpyiziouTK2cI4IpCbSWru7aznJFjTIbBR2XAlphnGkpacA1jB9Uvxff8hcvE6Ss_4Yp-hKpGWkkZzURqlB0oWwMKUVweoz9zsR3TYmei9BLEboUoecitCwatmjSOO8F8cv5e9F_N4eMhA</recordid><startdate>20180801</startdate><enddate>20180801</enddate><creator>Lee, Jongsu</creator><creator>Lee, Changwoo</creator><general>Korean Society for Precision Engineering</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope><orcidid>https://orcid.org/0000-0001-9862-2833</orcidid></search><sort><creationdate>20180801</creationdate><title>Improvement of a Splicing Machine to Decrease Abrupt Tension Changes and Tail Defects during the Roll Exchange Process in a Roll-to-Roll Manufacturing System</title><author>Lee, Jongsu ; Lee, Changwoo</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c350t-a691d669ef71fc735a47ff05276e146f4d9dc371a7ab7ed365e95afa9108ef823</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Defects</topic><topic>Engineering</topic><topic>Exchanging</topic><topic>Industrial and Production Engineering</topic><topic>Materials Science</topic><topic>Mathematical models</topic><topic>Regular Paper</topic><topic>Signal processing</topic><topic>Splicing</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Lee, Jongsu</creatorcontrib><creatorcontrib>Lee, Changwoo</creatorcontrib><collection>CrossRef</collection><jtitle>International journal of precision engineering and manufacturing</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Lee, Jongsu</au><au>Lee, Changwoo</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Improvement of a Splicing Machine to Decrease Abrupt Tension Changes and Tail Defects during the Roll Exchange Process in a Roll-to-Roll Manufacturing System</atitle><jtitle>International journal of precision engineering and manufacturing</jtitle><stitle>Int. J. Precis. Eng. Manuf</stitle><date>2018-08-01</date><risdate>2018</risdate><volume>19</volume><issue>8</issue><spage>1155</spage><epage>1161</epage><pages>1155-1161</pages><issn>2234-7593</issn><eissn>2005-4602</eissn><abstract>The use of the splicing system is necessary to exchange a fully unwound roll to a new one without stopping the roll-to-roll manufacturing machine. However, abrupt tension changes and tail defects, which is an overlap of completely unwound films with films in the process of being unwound, could occur during the roll exchange phase causing film loss and deterioration of product quality. Herein, we improved the splicing machine in an industrial scale R2R manufacturing system to decrease abrupt tension errors and tail defects. First, the effects of the factors generating the tail defects in the splicing machine on the net tail lengths were analyzed using designed mathematical models. Furthermore, the reason for the abrupt tension disturbance in the roll exchange process was determined. Based on the analyses, a passive dancer system was applied to the unwinding section to attenuate the tension error, and the time interval between the pressing and cutting phases was decreased by changing the signal processing method of the previous version of the splicing machine. Experimental results showed that the abrupt tension change was decreased by an average of 46.5%, while tail lengths were decreased by more than 2.5 times, thereby verifying the superior performance of the upgraded splicing machine.</abstract><cop>Seoul</cop><pub>Korean Society for Precision Engineering</pub><doi>10.1007/s12541-018-0136-6</doi><tpages>7</tpages><orcidid>https://orcid.org/0000-0001-9862-2833</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 2234-7593
ispartof International journal of precision engineering and manufacturing, 2018-08, Vol.19 (8), p.1155-1161
issn 2234-7593
2005-4602
language eng
recordid cdi_proquest_journals_2086324057
source Springer Nature - Complete Springer Journals
subjects Defects
Engineering
Exchanging
Industrial and Production Engineering
Materials Science
Mathematical models
Regular Paper
Signal processing
Splicing
title Improvement of a Splicing Machine to Decrease Abrupt Tension Changes and Tail Defects during the Roll Exchange Process in a Roll-to-Roll Manufacturing System
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T15%3A55%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Improvement%20of%20a%20Splicing%20Machine%20to%20Decrease%20Abrupt%20Tension%20Changes%20and%20Tail%20Defects%20during%20the%20Roll%20Exchange%20Process%20in%20a%20Roll-to-Roll%20Manufacturing%20System&rft.jtitle=International%20journal%20of%20precision%20engineering%20and%20manufacturing&rft.au=Lee,%20Jongsu&rft.date=2018-08-01&rft.volume=19&rft.issue=8&rft.spage=1155&rft.epage=1161&rft.pages=1155-1161&rft.issn=2234-7593&rft.eissn=2005-4602&rft_id=info:doi/10.1007/s12541-018-0136-6&rft_dat=%3Cproquest_cross%3E2086324057%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2086324057&rft_id=info:pmid/&rfr_iscdi=true