Simulation and optimization of a combined cycle gas turbine power plant for part-load operation

•The impact of ambient conditions and component off-design correction on plant performance is investigated.•A simulation-based optimization approach is proposed to obtain an optimal strategy.•FFC seems to prioritize the gas turbine, and IGVC tends to prioritize the steam cycle.•The optimal strategy...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Chemical engineering research & design 2018-03, Vol.131, p.29-40
Hauptverfasser: Liu, Zuming, Karimi, I.A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!