The first irradiation testing and PIE or TRISO-coated particle fuel in Korea

The first irradiation testing of TRISO-coated particle fuel to demonstrate and qualify its use in a VHTR was finished at the beginning of 2014 in HANARO, Korea. A PIE (post-irradiation examination) of the irradiated TRISO-coated particle fuel was then performed. The irradiation device contained two...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear engineering and design 2018-04, Vol.329, p.34-45
Hauptverfasser: Kim, Bong Goo, Yeo, Sunghwan, Jeong, Kyung-Chai, Kim, Yeon-Ku, Lee, Young Woo, Cho, Moon Sung
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!