Single-job lot streaming in m − 1 two-stage hybrid flowshops
This paper studies the single-job lot streaming problem in a two-stage hybrid flowshop that has m identical machines at the first stage and one machine at the second stage, to minimise the makespan. A setup time is considered before processing each sublot on a machine. For the problem with the numbe...
Gespeichert in:
Veröffentlicht in: | European journal of operational research 2008-06, Vol.187 (3), p.1171-1183 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper studies the single-job lot streaming problem in a two-stage hybrid flowshop that has
m identical machines at the first stage and one machine at the second stage, to minimise the makespan. A setup time is considered before processing each sublot on a machine. For the problem with the number of sublots given, we prove that it is optimal to use a rotation method for allocating and sequencing the sublots on the machines. With such allocation and sequencing, the sublot sizes are then optimised using linear programming. We then consider the problem with equal sublot sizes and develop an efficient solution to determining the optimal number of sublots. Finally optimal and heuristic solution methods for the general problem are proposed and the worst-case performance of the equal-sublot solution is analysed. Computational results are also reported demonstrating the close-to-optimal performances of the heuristic methods in different problem settings. |
---|---|
ISSN: | 0377-2217 1872-6860 |
DOI: | 10.1016/j.ejor.2006.06.066 |