Reinforcement Analysis of Toe Blocks and Anchor Cables at the Xiluodu Super-High Arch Dam

High stress concentrations near an arch dam–foundation interface may cause cracking and failure, particularly in super-high arch dams. Appropriate reinforcement measures are usually needed at the dam toe to increase the shear strength and bearing capacity of the rock mass foundation. In this paper,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Rock mechanics and rock engineering 2018-08, Vol.51 (8), p.2533-2554
Hauptverfasser: Shi, Jie, Lin, Peng, Zhou, Yuande, Wei, Pengcheng, Wang, Renkun
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!