The use of tunnelling parameters and spoil characteristics to assess soil types: a case study from alluvial deposits at a pipejacking project site

Generally, when there are only a few boreholes present along a tunnel design alignment, geological understanding of the worksite may not be adequate and the ability to optimise the tunnelling parameters is limited. This lack of boreholes will cause an increased potential of geo-hazards during tunnel...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Bulletin of engineering geology and the environment 2019-06, Vol.78 (4), p.2933-2942
Hauptverfasser: Cheng, Wen-Chieh, Ni, James C., Huang, Hui-Wen, Shen, Jack Shuilong
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!