Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method

During the construction process of the Pipe-roof Pre-construction Method (PPM), the main excavation is executed under the protection of a previously created and reliable structure, which ensures safety in construction. Moreover, PPM does not affect the road traffic, generally does not require the mo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Tunnelling and underground space technology 2018-02, Vol.72, p.210-217
Hauptverfasser: Yang, Xian, Li, Yongsuo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 217
container_issue
container_start_page 210
container_title Tunnelling and underground space technology
container_volume 72
creator Yang, Xian
Li, Yongsuo
description During the construction process of the Pipe-roof Pre-construction Method (PPM), the main excavation is executed under the protection of a previously created and reliable structure, which ensures safety in construction. Moreover, PPM does not affect the road traffic, generally does not require the moving of underground pipelines, and does not cause excessive surface settlement. The Xinleyizhi Station of the Shenyang subway system is a single arch long-span structure in poor geological conditions and with a complex surrounding environment and strict requirements for construction period. After considering the problems and potential solutions, PPM was used to build this station. In order to ensure safety in construction, the whole construction process was closely monitored. The surface settlement monitoring results are studied in this paper, and the causes of settlement are analyzed. According to the field measurement, the most serious settlement occurred in the layer 1–7 pipe jacking. Because of repeated disturbance and ‘shielding effect’ in pipe jacking, soil displacement mode changes, and traditional Peck formula is no longer applicable. Modified Peck formula is proposed to predict settlement caused by pipe jacking, and the specific method of taking parameters values in modified Peck formula is given. Compared to the measured transverse surface settlement curve in monitoring, it is shown that the prediction results are in good agreement with the measured results.
doi_str_mv 10.1016/j.tust.2017.11.024
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2024404846</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0886779817305254</els_id><sourcerecordid>2024404846</sourcerecordid><originalsourceid>FETCH-LOGICAL-c367t-9c33dd1973d40edf3a7aa387e709f2c32636ae2928373e4ead4a93f4709ed41f3</originalsourceid><addsrcrecordid>eNp9kE1LAzEQhoMoWKt_wFPA8675crMLXqT4BRWL6DnEZNLu0m5qklX67822nj3NYZ7nneFF6JKSkhJaXXdlGmIqGaGypLQkTByhCa1lXQheiWM0IXVdFVI29Sk6i7EjhNww1kzQ8AYRdDAr7B2OQ3DaAI6Q0ho20CfsfMAax7ZfrgHvubXvl0Xc6j7jnz96h2PSqfU9HkYKpxXgRbuFIvicuAhQGN_HFAazh14grbw9RydOryNc_M0p-ni4f589FfPXx-fZ3bwwvJKpaAzn1tJGcisIWMe11JrXEiRpHDOcVbzSwBpWc8lBgLZCN9yJvAYrqONTdHXI3Qb_NUBMqvND6PNJxXJHgohaVJliB8oEH2MAp7ah3eiwU5SosV7VqbFeNdarKFVZzdLtQYL8_3cLQUXTQm_AtgFMUta3_-m_jriFmQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2024404846</pqid></control><display><type>article</type><title>Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method</title><source>Access via ScienceDirect (Elsevier)</source><creator>Yang, Xian ; Li, Yongsuo</creator><creatorcontrib>Yang, Xian ; Li, Yongsuo</creatorcontrib><description>During the construction process of the Pipe-roof Pre-construction Method (PPM), the main excavation is executed under the protection of a previously created and reliable structure, which ensures safety in construction. Moreover, PPM does not affect the road traffic, generally does not require the moving of underground pipelines, and does not cause excessive surface settlement. The Xinleyizhi Station of the Shenyang subway system is a single arch long-span structure in poor geological conditions and with a complex surrounding environment and strict requirements for construction period. After considering the problems and potential solutions, PPM was used to build this station. In order to ensure safety in construction, the whole construction process was closely monitored. The surface settlement monitoring results are studied in this paper, and the causes of settlement are analyzed. According to the field measurement, the most serious settlement occurred in the layer 1–7 pipe jacking. Because of repeated disturbance and ‘shielding effect’ in pipe jacking, soil displacement mode changes, and traditional Peck formula is no longer applicable. Modified Peck formula is proposed to predict settlement caused by pipe jacking, and the specific method of taking parameters values in modified Peck formula is given. Compared to the measured transverse surface settlement curve in monitoring, it is shown that the prediction results are in good agreement with the measured results.</description><identifier>ISSN: 0886-7798</identifier><identifier>EISSN: 1878-4364</identifier><identifier>DOI: 10.1016/j.tust.2017.11.024</identifier><language>eng</language><publisher>Oxford: Elsevier Ltd</publisher><subject>Arches ; Construction methods ; Excavation ; Modified Peck formula ; Parameter modification ; Pipe ; Pipe-roof Pre-construction Method ; Pipelines ; Shielding ; Single arch long-span subway station ; Subway construction ; Subway stations ; Surface settlement ; Traffic safety ; Underground construction ; Underground roadways</subject><ispartof>Tunnelling and underground space technology, 2018-02, Vol.72, p.210-217</ispartof><rights>2017 Elsevier Ltd</rights><rights>Copyright Elsevier BV Feb 2018</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c367t-9c33dd1973d40edf3a7aa387e709f2c32636ae2928373e4ead4a93f4709ed41f3</citedby><cites>FETCH-LOGICAL-c367t-9c33dd1973d40edf3a7aa387e709f2c32636ae2928373e4ead4a93f4709ed41f3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.tust.2017.11.024$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,780,784,3550,27924,27925,45995</link.rule.ids></links><search><creatorcontrib>Yang, Xian</creatorcontrib><creatorcontrib>Li, Yongsuo</creatorcontrib><title>Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method</title><title>Tunnelling and underground space technology</title><description>During the construction process of the Pipe-roof Pre-construction Method (PPM), the main excavation is executed under the protection of a previously created and reliable structure, which ensures safety in construction. Moreover, PPM does not affect the road traffic, generally does not require the moving of underground pipelines, and does not cause excessive surface settlement. The Xinleyizhi Station of the Shenyang subway system is a single arch long-span structure in poor geological conditions and with a complex surrounding environment and strict requirements for construction period. After considering the problems and potential solutions, PPM was used to build this station. In order to ensure safety in construction, the whole construction process was closely monitored. The surface settlement monitoring results are studied in this paper, and the causes of settlement are analyzed. According to the field measurement, the most serious settlement occurred in the layer 1–7 pipe jacking. Because of repeated disturbance and ‘shielding effect’ in pipe jacking, soil displacement mode changes, and traditional Peck formula is no longer applicable. Modified Peck formula is proposed to predict settlement caused by pipe jacking, and the specific method of taking parameters values in modified Peck formula is given. Compared to the measured transverse surface settlement curve in monitoring, it is shown that the prediction results are in good agreement with the measured results.</description><subject>Arches</subject><subject>Construction methods</subject><subject>Excavation</subject><subject>Modified Peck formula</subject><subject>Parameter modification</subject><subject>Pipe</subject><subject>Pipe-roof Pre-construction Method</subject><subject>Pipelines</subject><subject>Shielding</subject><subject>Single arch long-span subway station</subject><subject>Subway construction</subject><subject>Subway stations</subject><subject>Surface settlement</subject><subject>Traffic safety</subject><subject>Underground construction</subject><subject>Underground roadways</subject><issn>0886-7798</issn><issn>1878-4364</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><recordid>eNp9kE1LAzEQhoMoWKt_wFPA8675crMLXqT4BRWL6DnEZNLu0m5qklX67822nj3NYZ7nneFF6JKSkhJaXXdlGmIqGaGypLQkTByhCa1lXQheiWM0IXVdFVI29Sk6i7EjhNww1kzQ8AYRdDAr7B2OQ3DaAI6Q0ho20CfsfMAax7ZfrgHvubXvl0Xc6j7jnz96h2PSqfU9HkYKpxXgRbuFIvicuAhQGN_HFAazh14grbw9RydOryNc_M0p-ni4f589FfPXx-fZ3bwwvJKpaAzn1tJGcisIWMe11JrXEiRpHDOcVbzSwBpWc8lBgLZCN9yJvAYrqONTdHXI3Qb_NUBMqvND6PNJxXJHgohaVJliB8oEH2MAp7ah3eiwU5SosV7VqbFeNdarKFVZzdLtQYL8_3cLQUXTQm_AtgFMUta3_-m_jriFmQ</recordid><startdate>20180201</startdate><enddate>20180201</enddate><creator>Yang, Xian</creator><creator>Li, Yongsuo</creator><general>Elsevier Ltd</general><general>Elsevier BV</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20180201</creationdate><title>Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method</title><author>Yang, Xian ; Li, Yongsuo</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c367t-9c33dd1973d40edf3a7aa387e709f2c32636ae2928373e4ead4a93f4709ed41f3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Arches</topic><topic>Construction methods</topic><topic>Excavation</topic><topic>Modified Peck formula</topic><topic>Parameter modification</topic><topic>Pipe</topic><topic>Pipe-roof Pre-construction Method</topic><topic>Pipelines</topic><topic>Shielding</topic><topic>Single arch long-span subway station</topic><topic>Subway construction</topic><topic>Subway stations</topic><topic>Surface settlement</topic><topic>Traffic safety</topic><topic>Underground construction</topic><topic>Underground roadways</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Yang, Xian</creatorcontrib><creatorcontrib>Li, Yongsuo</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Tunnelling and underground space technology</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Yang, Xian</au><au>Li, Yongsuo</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method</atitle><jtitle>Tunnelling and underground space technology</jtitle><date>2018-02-01</date><risdate>2018</risdate><volume>72</volume><spage>210</spage><epage>217</epage><pages>210-217</pages><issn>0886-7798</issn><eissn>1878-4364</eissn><abstract>During the construction process of the Pipe-roof Pre-construction Method (PPM), the main excavation is executed under the protection of a previously created and reliable structure, which ensures safety in construction. Moreover, PPM does not affect the road traffic, generally does not require the moving of underground pipelines, and does not cause excessive surface settlement. The Xinleyizhi Station of the Shenyang subway system is a single arch long-span structure in poor geological conditions and with a complex surrounding environment and strict requirements for construction period. After considering the problems and potential solutions, PPM was used to build this station. In order to ensure safety in construction, the whole construction process was closely monitored. The surface settlement monitoring results are studied in this paper, and the causes of settlement are analyzed. According to the field measurement, the most serious settlement occurred in the layer 1–7 pipe jacking. Because of repeated disturbance and ‘shielding effect’ in pipe jacking, soil displacement mode changes, and traditional Peck formula is no longer applicable. Modified Peck formula is proposed to predict settlement caused by pipe jacking, and the specific method of taking parameters values in modified Peck formula is given. Compared to the measured transverse surface settlement curve in monitoring, it is shown that the prediction results are in good agreement with the measured results.</abstract><cop>Oxford</cop><pub>Elsevier Ltd</pub><doi>10.1016/j.tust.2017.11.024</doi><tpages>8</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0886-7798
ispartof Tunnelling and underground space technology, 2018-02, Vol.72, p.210-217
issn 0886-7798
1878-4364
language eng
recordid cdi_proquest_journals_2024404846
source Access via ScienceDirect (Elsevier)
subjects Arches
Construction methods
Excavation
Modified Peck formula
Parameter modification
Pipe
Pipe-roof Pre-construction Method
Pipelines
Shielding
Single arch long-span subway station
Subway construction
Subway stations
Surface settlement
Traffic safety
Underground construction
Underground roadways
title Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-30T17%3A16%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Research%20of%20surface%20settlement%20for%20a%20single%20arch%20long-span%20subway%20station%20using%20the%20Pipe-roof%20Pre-construction%20Method&rft.jtitle=Tunnelling%20and%20underground%20space%20technology&rft.au=Yang,%20Xian&rft.date=2018-02-01&rft.volume=72&rft.spage=210&rft.epage=217&rft.pages=210-217&rft.issn=0886-7798&rft.eissn=1878-4364&rft_id=info:doi/10.1016/j.tust.2017.11.024&rft_dat=%3Cproquest_cross%3E2024404846%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2024404846&rft_id=info:pmid/&rft_els_id=S0886779817305254&rfr_iscdi=true