Design of the Gongbei tunnel using a very large cross-section pipe-roof and soil freezing method

•In narrow corridor belt, a super-shallow-buried large cross-sectional double-decked six-lane tunnel traverse method is used.•The innovative construction method of pipe-roof freezing and underground excavation is first proposed.•The key technology of long-distance and large cross-section curved pipe...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Tunnelling and underground space technology 2018-02, Vol.72, p.28-40
Hauptverfasser: Liu, Jiguo, Ma, Baosong, Cheng, Yong
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!