Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing
Kits (such as accessories, fixtures, jigs, etc.) are widely used in production for many industries. They are normally product- and machine-specific, so a large kit inventory must be maintained when the product-mix variation is high. Fortunately, many kits are reconfigurable. That means they can be d...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on automation science and engineering 2007-10, Vol.4 (4), p.543-552 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 552 |
---|---|
container_issue | 4 |
container_start_page | 543 |
container_title | IEEE transactions on automation science and engineering |
container_volume | 4 |
creator | Zhang, M.T. Niu, S. Shiming Deng Zhicong Zhang Qi Li Li Zheng |
description | Kits (such as accessories, fixtures, jigs, etc.) are widely used in production for many industries. They are normally product- and machine-specific, so a large kit inventory must be maintained when the product-mix variation is high. Fortunately, many kits are reconfigurable. That means they can be dissembled into components and then these components themselves (or together with some other components) can be reassembled into new types of kits. Therefore, we can save money and improve supply chain responsiveness by purchasing components instead of entire kits. However, research on capacity planning with reconfigurable kits has not been reported. We proposed a two-level hierarchical planning methodology to generate a complete capacity planning solution using mixed-integer linear programming. MaxIt covers mid-range monthly planning and automated capacity allocation system covers short-range weekly planning. These systems are integrated to generate optimal capacity plans considering kit components. This methodology has been successfully implemented in Intel's global semiconductor assembly and test manufacturing since 2004. In this paper, we present the hierarchical modeling framework and focus on MaxIt modeling with kit reconfiguration. We also verify the methodology by numerical experiments in a real production environment. |
doi_str_mv | 10.1109/TASE.2007.905977 |
format | Article |
fullrecord | <record><control><sourceid>proquest_RIE</sourceid><recordid>TN_cdi_proquest_journals_201404142</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>4312837</ieee_id><sourcerecordid>34433783</sourcerecordid><originalsourceid>FETCH-LOGICAL-c385t-61b7d22e7572acfd5e6adc878d6cf54c3b89128bf4be7094d31783d10d4ae52e3</originalsourceid><addsrcrecordid>eNqFkb1v2zAQxYWgBZqm2Qt0ITqkkxx-iuRoGI5dJEGCxEVHgiJPMQ1Zcklp8H9fCg46dEgmHsDfe7h3ryi-EjwjBOvrzfx5OaMYy5nGQkt5VpwTIVTJpGIfppmLUmghPhWfU9phTLnS-Lzo1wGijW4bnG3Rwh6sC8MRPba260L3gn6HYYuewPVdE17GaOsW0G0YEgodWrV9nUXPsA_5349u6COapwT7uj0i23m0gTSge9uNjXXDGLPhl-JjY9sEl6_vRfHrZrlZrMu7h9XPxfyudEyJoaxILT2lIIWk1jVeQGW9U1L5yjWCO1YrTaiqG16DxJp7RnJOT7DnFgQFdlH8OPkeYv9nzGuYfUgO2pwL-jEZjVlFCaXVu6TSFcVV3iOTV2-SjHM2nTuD3_8Dd_0Yu5zXUEw45oRPbvgEudinFKExhxj2Nh4NwWaq1EyVmqlSc6o0S76dJAEA_uGc5Uswyf4C48qdWg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>201404142</pqid></control><display><type>article</type><title>Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing</title><source>IEEE Electronic Library (IEL)</source><creator>Zhang, M.T. ; Niu, S. ; Shiming Deng ; Zhicong Zhang ; Qi Li ; Li Zheng</creator><creatorcontrib>Zhang, M.T. ; Niu, S. ; Shiming Deng ; Zhicong Zhang ; Qi Li ; Li Zheng</creatorcontrib><description>Kits (such as accessories, fixtures, jigs, etc.) are widely used in production for many industries. They are normally product- and machine-specific, so a large kit inventory must be maintained when the product-mix variation is high. Fortunately, many kits are reconfigurable. That means they can be dissembled into components and then these components themselves (or together with some other components) can be reassembled into new types of kits. Therefore, we can save money and improve supply chain responsiveness by purchasing components instead of entire kits. However, research on capacity planning with reconfigurable kits has not been reported. We proposed a two-level hierarchical planning methodology to generate a complete capacity planning solution using mixed-integer linear programming. MaxIt covers mid-range monthly planning and automated capacity allocation system covers short-range weekly planning. These systems are integrated to generate optimal capacity plans considering kit components. This methodology has been successfully implemented in Intel's global semiconductor assembly and test manufacturing since 2004. In this paper, we present the hierarchical modeling framework and focus on MaxIt modeling with kit reconfiguration. We also verify the methodology by numerical experiments in a real production environment.</description><identifier>ISSN: 1545-5955</identifier><identifier>EISSN: 1558-3783</identifier><identifier>DOI: 10.1109/TASE.2007.905977</identifier><identifier>CODEN: ITASC7</identifier><language>eng</language><publisher>New York: IEEE</publisher><subject>Assembly ; Automated storage retrieval systems ; Automation ; Capacity planning ; Delay ; Fixtures ; Linear programming ; Machinery production industries ; Manufacturing industries ; Mathematical models ; Methodology ; mixed integer linear programming (MILP) ; Purchasing ; Research methodology ; Semiconductor device manufacture ; Semiconductor device testing ; semiconductor manufacturing ; Semiconductors ; Supply chains</subject><ispartof>IEEE transactions on automation science and engineering, 2007-10, Vol.4 (4), p.543-552</ispartof><rights>Copyright Institute of Electrical and Electronics Engineers, Inc. (IEEE) Oct 2007</rights><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c385t-61b7d22e7572acfd5e6adc878d6cf54c3b89128bf4be7094d31783d10d4ae52e3</citedby><cites>FETCH-LOGICAL-c385t-61b7d22e7572acfd5e6adc878d6cf54c3b89128bf4be7094d31783d10d4ae52e3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/4312837$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>314,780,784,796,27924,27925,54758</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/4312837$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Zhang, M.T.</creatorcontrib><creatorcontrib>Niu, S.</creatorcontrib><creatorcontrib>Shiming Deng</creatorcontrib><creatorcontrib>Zhicong Zhang</creatorcontrib><creatorcontrib>Qi Li</creatorcontrib><creatorcontrib>Li Zheng</creatorcontrib><title>Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing</title><title>IEEE transactions on automation science and engineering</title><addtitle>TASE</addtitle><description>Kits (such as accessories, fixtures, jigs, etc.) are widely used in production for many industries. They are normally product- and machine-specific, so a large kit inventory must be maintained when the product-mix variation is high. Fortunately, many kits are reconfigurable. That means they can be dissembled into components and then these components themselves (or together with some other components) can be reassembled into new types of kits. Therefore, we can save money and improve supply chain responsiveness by purchasing components instead of entire kits. However, research on capacity planning with reconfigurable kits has not been reported. We proposed a two-level hierarchical planning methodology to generate a complete capacity planning solution using mixed-integer linear programming. MaxIt covers mid-range monthly planning and automated capacity allocation system covers short-range weekly planning. These systems are integrated to generate optimal capacity plans considering kit components. This methodology has been successfully implemented in Intel's global semiconductor assembly and test manufacturing since 2004. In this paper, we present the hierarchical modeling framework and focus on MaxIt modeling with kit reconfiguration. We also verify the methodology by numerical experiments in a real production environment.</description><subject>Assembly</subject><subject>Automated storage retrieval systems</subject><subject>Automation</subject><subject>Capacity planning</subject><subject>Delay</subject><subject>Fixtures</subject><subject>Linear programming</subject><subject>Machinery production industries</subject><subject>Manufacturing industries</subject><subject>Mathematical models</subject><subject>Methodology</subject><subject>mixed integer linear programming (MILP)</subject><subject>Purchasing</subject><subject>Research methodology</subject><subject>Semiconductor device manufacture</subject><subject>Semiconductor device testing</subject><subject>semiconductor manufacturing</subject><subject>Semiconductors</subject><subject>Supply chains</subject><issn>1545-5955</issn><issn>1558-3783</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2007</creationdate><recordtype>article</recordtype><sourceid>RIE</sourceid><recordid>eNqFkb1v2zAQxYWgBZqm2Qt0ITqkkxx-iuRoGI5dJEGCxEVHgiJPMQ1Zcklp8H9fCg46dEgmHsDfe7h3ryi-EjwjBOvrzfx5OaMYy5nGQkt5VpwTIVTJpGIfppmLUmghPhWfU9phTLnS-Lzo1wGijW4bnG3Rwh6sC8MRPba260L3gn6HYYuewPVdE17GaOsW0G0YEgodWrV9nUXPsA_5349u6COapwT7uj0i23m0gTSge9uNjXXDGLPhl-JjY9sEl6_vRfHrZrlZrMu7h9XPxfyudEyJoaxILT2lIIWk1jVeQGW9U1L5yjWCO1YrTaiqG16DxJp7RnJOT7DnFgQFdlH8OPkeYv9nzGuYfUgO2pwL-jEZjVlFCaXVu6TSFcVV3iOTV2-SjHM2nTuD3_8Dd_0Yu5zXUEw45oRPbvgEudinFKExhxj2Nh4NwWaq1EyVmqlSc6o0S76dJAEA_uGc5Uswyf4C48qdWg</recordid><startdate>20071001</startdate><enddate>20071001</enddate><creator>Zhang, M.T.</creator><creator>Niu, S.</creator><creator>Shiming Deng</creator><creator>Zhicong Zhang</creator><creator>Qi Li</creator><creator>Li Zheng</creator><general>IEEE</general><general>The Institute of Electrical and Electronics Engineers, Inc. (IEEE)</general><scope>97E</scope><scope>RIA</scope><scope>RIE</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>7SP</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope><scope>F28</scope></search><sort><creationdate>20071001</creationdate><title>Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing</title><author>Zhang, M.T. ; Niu, S. ; Shiming Deng ; Zhicong Zhang ; Qi Li ; Li Zheng</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c385t-61b7d22e7572acfd5e6adc878d6cf54c3b89128bf4be7094d31783d10d4ae52e3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2007</creationdate><topic>Assembly</topic><topic>Automated storage retrieval systems</topic><topic>Automation</topic><topic>Capacity planning</topic><topic>Delay</topic><topic>Fixtures</topic><topic>Linear programming</topic><topic>Machinery production industries</topic><topic>Manufacturing industries</topic><topic>Mathematical models</topic><topic>Methodology</topic><topic>mixed integer linear programming (MILP)</topic><topic>Purchasing</topic><topic>Research methodology</topic><topic>Semiconductor device manufacture</topic><topic>Semiconductor device testing</topic><topic>semiconductor manufacturing</topic><topic>Semiconductors</topic><topic>Supply chains</topic><toplevel>online_resources</toplevel><creatorcontrib>Zhang, M.T.</creatorcontrib><creatorcontrib>Niu, S.</creatorcontrib><creatorcontrib>Shiming Deng</creatorcontrib><creatorcontrib>Zhicong Zhang</creatorcontrib><creatorcontrib>Qi Li</creatorcontrib><creatorcontrib>Li Zheng</creatorcontrib><collection>IEEE All-Society Periodicals Package (ASPP) 2005-present</collection><collection>IEEE All-Society Periodicals Package (ASPP) 1998-Present</collection><collection>IEEE Electronic Library (IEL)</collection><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Electronics & Communications Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><collection>ANTE: Abstracts in New Technology & Engineering</collection><jtitle>IEEE transactions on automation science and engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Zhang, M.T.</au><au>Niu, S.</au><au>Shiming Deng</au><au>Zhicong Zhang</au><au>Qi Li</au><au>Li Zheng</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing</atitle><jtitle>IEEE transactions on automation science and engineering</jtitle><stitle>TASE</stitle><date>2007-10-01</date><risdate>2007</risdate><volume>4</volume><issue>4</issue><spage>543</spage><epage>552</epage><pages>543-552</pages><issn>1545-5955</issn><eissn>1558-3783</eissn><coden>ITASC7</coden><abstract>Kits (such as accessories, fixtures, jigs, etc.) are widely used in production for many industries. They are normally product- and machine-specific, so a large kit inventory must be maintained when the product-mix variation is high. Fortunately, many kits are reconfigurable. That means they can be dissembled into components and then these components themselves (or together with some other components) can be reassembled into new types of kits. Therefore, we can save money and improve supply chain responsiveness by purchasing components instead of entire kits. However, research on capacity planning with reconfigurable kits has not been reported. We proposed a two-level hierarchical planning methodology to generate a complete capacity planning solution using mixed-integer linear programming. MaxIt covers mid-range monthly planning and automated capacity allocation system covers short-range weekly planning. These systems are integrated to generate optimal capacity plans considering kit components. This methodology has been successfully implemented in Intel's global semiconductor assembly and test manufacturing since 2004. In this paper, we present the hierarchical modeling framework and focus on MaxIt modeling with kit reconfiguration. We also verify the methodology by numerical experiments in a real production environment.</abstract><cop>New York</cop><pub>IEEE</pub><doi>10.1109/TASE.2007.905977</doi><tpages>10</tpages></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | ISSN: 1545-5955 |
ispartof | IEEE transactions on automation science and engineering, 2007-10, Vol.4 (4), p.543-552 |
issn | 1545-5955 1558-3783 |
language | eng |
recordid | cdi_proquest_journals_201404142 |
source | IEEE Electronic Library (IEL) |
subjects | Assembly Automated storage retrieval systems Automation Capacity planning Delay Fixtures Linear programming Machinery production industries Manufacturing industries Mathematical models Methodology mixed integer linear programming (MILP) Purchasing Research methodology Semiconductor device manufacture Semiconductor device testing semiconductor manufacturing Semiconductors Supply chains |
title | Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T23%3A26%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_RIE&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Hierarchical%20Capacity%20Planning%20With%20Reconfigurable%20Kits%20in%20Global%20Semiconductor%20Assembly%20and%20Test%20Manufacturing&rft.jtitle=IEEE%20transactions%20on%20automation%20science%20and%20engineering&rft.au=Zhang,%20M.T.&rft.date=2007-10-01&rft.volume=4&rft.issue=4&rft.spage=543&rft.epage=552&rft.pages=543-552&rft.issn=1545-5955&rft.eissn=1558-3783&rft.coden=ITASC7&rft_id=info:doi/10.1109/TASE.2007.905977&rft_dat=%3Cproquest_RIE%3E34433783%3C/proquest_RIE%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=201404142&rft_id=info:pmid/&rft_ieee_id=4312837&rfr_iscdi=true |