Planning Electric-Rolling-Stock Maintenance in Conditions of Limited Resources

Planning electric-rolling-stock (ERS) maintenance in conditions of limited resources can be carried out based on the following criteria of efficiency of construction of the cycle diagram of the electric rolling stock: meeting the requirements of the railway-traffic safety provided by adjusting the p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Russian electrical engineering 2017, Vol.88 (12), p.839-841
Hauptverfasser: Sidorenko, V. G., Aung, Chzho Min, Alekseev, V. M., Rozenberg, E. N., Umanskii, V. I.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 841
container_issue 12
container_start_page 839
container_title Russian electrical engineering
container_volume 88
creator Sidorenko, V. G.
Aung, Chzho Min
Alekseev, V. M.
Rozenberg, E. N.
Umanskii, V. I.
description Planning electric-rolling-stock (ERS) maintenance in conditions of limited resources can be carried out based on the following criteria of efficiency of construction of the cycle diagram of the electric rolling stock: meeting the requirements of the railway-traffic safety provided by adjusting the planned movement time of the electric rolling stock for the purpose of not allowing an excessive lapse of time between the maintenance over that permissible and uniformity of maintenance. The solution of the set problem using the graph theory allows obtaining the whole set of the permissible values of maintenance and selecting a value that, on the one hand, corresponds to the planned train time schedule (PTTS) and, on the other hand, differs minimally from the optimal with respect to the selected criterion. This takes a significant amount of time. The problem can be quickly solved using a genetic algorithm. The introduction of a new criterion—total excess time lapse between maintenance works over the permissible interval—allows obtaining the solution with any initial data, which is not always achievable when using the uniform-maintenance criterion. The crossover and permutation algorithm implemented within the genetic algorithm is adapted taking into account considering the peculiarities of the agents engaged in solving the problem that has been set out. We have studied the possibility of using various types of crossover and permutation to construct the cycle diagrams and influence of the parameters of the genetic algorithm on the results. The obtained analytical results are tested for the conditions of the Moscow subway.
doi_str_mv 10.3103/S106837121712015X
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2007131043</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2007131043</sourcerecordid><originalsourceid>FETCH-LOGICAL-c279X-c75aad6f3a7ef40285cef19ad2cd9b1c3a9f9f06615d08cd70f8c93067e7bf413</originalsourceid><addsrcrecordid>eNp1UEtLAzEQDqJgrf4AbwueozOb3c3uUUp9wPqgVehtSfMoqdukJtuD_96UCh7EwzDDfI8ZPkIuEa4ZAruZI1Q145hjKsBycURG2LCC1oBwnOYE0z1-Ss5iXAOUVV4UI_L82gvnrFtl017LIVhJZ77v04LOBy8_sidh3aCdcFJn1mUT75QdrHcx8yZr7cYOWmUzHf0uSB3PyYkRfdQXP31M3u-mb5MH2r7cP05uWypz3iyo5KUQqjJMcG0KyOtSaoONULlUzRIlE41pDFQVlgpqqTiYWjYMKq750hTIxuTq4LsN_nOn49Ct0wMunexyAI4pk4IlFh5YMvgYgzbdNtiNCF8dQrePrfsTW9LkB01MXLfS4df5f9E3HVxvGQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2007131043</pqid></control><display><type>article</type><title>Planning Electric-Rolling-Stock Maintenance in Conditions of Limited Resources</title><source>Springer Nature - Complete Springer Journals</source><creator>Sidorenko, V. G. ; Aung, Chzho Min ; Alekseev, V. M. ; Rozenberg, E. N. ; Umanskii, V. I.</creator><creatorcontrib>Sidorenko, V. G. ; Aung, Chzho Min ; Alekseev, V. M. ; Rozenberg, E. N. ; Umanskii, V. I.</creatorcontrib><description>Planning electric-rolling-stock (ERS) maintenance in conditions of limited resources can be carried out based on the following criteria of efficiency of construction of the cycle diagram of the electric rolling stock: meeting the requirements of the railway-traffic safety provided by adjusting the planned movement time of the electric rolling stock for the purpose of not allowing an excessive lapse of time between the maintenance over that permissible and uniformity of maintenance. The solution of the set problem using the graph theory allows obtaining the whole set of the permissible values of maintenance and selecting a value that, on the one hand, corresponds to the planned train time schedule (PTTS) and, on the other hand, differs minimally from the optimal with respect to the selected criterion. This takes a significant amount of time. The problem can be quickly solved using a genetic algorithm. The introduction of a new criterion—total excess time lapse between maintenance works over the permissible interval—allows obtaining the solution with any initial data, which is not always achievable when using the uniform-maintenance criterion. The crossover and permutation algorithm implemented within the genetic algorithm is adapted taking into account considering the peculiarities of the agents engaged in solving the problem that has been set out. We have studied the possibility of using various types of crossover and permutation to construct the cycle diagrams and influence of the parameters of the genetic algorithm on the results. The obtained analytical results are tested for the conditions of the Moscow subway.</description><identifier>ISSN: 1068-3712</identifier><identifier>EISSN: 1934-8010</identifier><identifier>DOI: 10.3103/S106837121712015X</identifier><language>eng</language><publisher>Moscow: Pleiades Publishing</publisher><subject>Criteria ; Engineering ; Genetic algorithms ; Graph theory ; Machines ; Maintenance ; Manufacturing ; Permutations ; Processes ; Rolling stock ; Traffic safety</subject><ispartof>Russian electrical engineering, 2017, Vol.88 (12), p.839-841</ispartof><rights>Allerton Press, Inc. 2017</rights><rights>Copyright Springer Science &amp; Business Media 2017</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c279X-c75aad6f3a7ef40285cef19ad2cd9b1c3a9f9f06615d08cd70f8c93067e7bf413</citedby><cites>FETCH-LOGICAL-c279X-c75aad6f3a7ef40285cef19ad2cd9b1c3a9f9f06615d08cd70f8c93067e7bf413</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.3103/S106837121712015X$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.3103/S106837121712015X$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,776,780,27903,27904,41467,42536,51298</link.rule.ids></links><search><creatorcontrib>Sidorenko, V. G.</creatorcontrib><creatorcontrib>Aung, Chzho Min</creatorcontrib><creatorcontrib>Alekseev, V. M.</creatorcontrib><creatorcontrib>Rozenberg, E. N.</creatorcontrib><creatorcontrib>Umanskii, V. I.</creatorcontrib><title>Planning Electric-Rolling-Stock Maintenance in Conditions of Limited Resources</title><title>Russian electrical engineering</title><addtitle>Russ. Electr. Engin</addtitle><description>Planning electric-rolling-stock (ERS) maintenance in conditions of limited resources can be carried out based on the following criteria of efficiency of construction of the cycle diagram of the electric rolling stock: meeting the requirements of the railway-traffic safety provided by adjusting the planned movement time of the electric rolling stock for the purpose of not allowing an excessive lapse of time between the maintenance over that permissible and uniformity of maintenance. The solution of the set problem using the graph theory allows obtaining the whole set of the permissible values of maintenance and selecting a value that, on the one hand, corresponds to the planned train time schedule (PTTS) and, on the other hand, differs minimally from the optimal with respect to the selected criterion. This takes a significant amount of time. The problem can be quickly solved using a genetic algorithm. The introduction of a new criterion—total excess time lapse between maintenance works over the permissible interval—allows obtaining the solution with any initial data, which is not always achievable when using the uniform-maintenance criterion. The crossover and permutation algorithm implemented within the genetic algorithm is adapted taking into account considering the peculiarities of the agents engaged in solving the problem that has been set out. We have studied the possibility of using various types of crossover and permutation to construct the cycle diagrams and influence of the parameters of the genetic algorithm on the results. The obtained analytical results are tested for the conditions of the Moscow subway.</description><subject>Criteria</subject><subject>Engineering</subject><subject>Genetic algorithms</subject><subject>Graph theory</subject><subject>Machines</subject><subject>Maintenance</subject><subject>Manufacturing</subject><subject>Permutations</subject><subject>Processes</subject><subject>Rolling stock</subject><subject>Traffic safety</subject><issn>1068-3712</issn><issn>1934-8010</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2017</creationdate><recordtype>article</recordtype><recordid>eNp1UEtLAzEQDqJgrf4AbwueozOb3c3uUUp9wPqgVehtSfMoqdukJtuD_96UCh7EwzDDfI8ZPkIuEa4ZAruZI1Q145hjKsBycURG2LCC1oBwnOYE0z1-Ss5iXAOUVV4UI_L82gvnrFtl017LIVhJZ77v04LOBy8_sidh3aCdcFJn1mUT75QdrHcx8yZr7cYOWmUzHf0uSB3PyYkRfdQXP31M3u-mb5MH2r7cP05uWypz3iyo5KUQqjJMcG0KyOtSaoONULlUzRIlE41pDFQVlgpqqTiYWjYMKq750hTIxuTq4LsN_nOn49Ct0wMunexyAI4pk4IlFh5YMvgYgzbdNtiNCF8dQrePrfsTW9LkB01MXLfS4df5f9E3HVxvGQ</recordid><startdate>2017</startdate><enddate>2017</enddate><creator>Sidorenko, V. G.</creator><creator>Aung, Chzho Min</creator><creator>Alekseev, V. M.</creator><creator>Rozenberg, E. N.</creator><creator>Umanskii, V. I.</creator><general>Pleiades Publishing</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>2017</creationdate><title>Planning Electric-Rolling-Stock Maintenance in Conditions of Limited Resources</title><author>Sidorenko, V. G. ; Aung, Chzho Min ; Alekseev, V. M. ; Rozenberg, E. N. ; Umanskii, V. I.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c279X-c75aad6f3a7ef40285cef19ad2cd9b1c3a9f9f06615d08cd70f8c93067e7bf413</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2017</creationdate><topic>Criteria</topic><topic>Engineering</topic><topic>Genetic algorithms</topic><topic>Graph theory</topic><topic>Machines</topic><topic>Maintenance</topic><topic>Manufacturing</topic><topic>Permutations</topic><topic>Processes</topic><topic>Rolling stock</topic><topic>Traffic safety</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Sidorenko, V. G.</creatorcontrib><creatorcontrib>Aung, Chzho Min</creatorcontrib><creatorcontrib>Alekseev, V. M.</creatorcontrib><creatorcontrib>Rozenberg, E. N.</creatorcontrib><creatorcontrib>Umanskii, V. I.</creatorcontrib><collection>CrossRef</collection><jtitle>Russian electrical engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Sidorenko, V. G.</au><au>Aung, Chzho Min</au><au>Alekseev, V. M.</au><au>Rozenberg, E. N.</au><au>Umanskii, V. I.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Planning Electric-Rolling-Stock Maintenance in Conditions of Limited Resources</atitle><jtitle>Russian electrical engineering</jtitle><stitle>Russ. Electr. Engin</stitle><date>2017</date><risdate>2017</risdate><volume>88</volume><issue>12</issue><spage>839</spage><epage>841</epage><pages>839-841</pages><issn>1068-3712</issn><eissn>1934-8010</eissn><abstract>Planning electric-rolling-stock (ERS) maintenance in conditions of limited resources can be carried out based on the following criteria of efficiency of construction of the cycle diagram of the electric rolling stock: meeting the requirements of the railway-traffic safety provided by adjusting the planned movement time of the electric rolling stock for the purpose of not allowing an excessive lapse of time between the maintenance over that permissible and uniformity of maintenance. The solution of the set problem using the graph theory allows obtaining the whole set of the permissible values of maintenance and selecting a value that, on the one hand, corresponds to the planned train time schedule (PTTS) and, on the other hand, differs minimally from the optimal with respect to the selected criterion. This takes a significant amount of time. The problem can be quickly solved using a genetic algorithm. The introduction of a new criterion—total excess time lapse between maintenance works over the permissible interval—allows obtaining the solution with any initial data, which is not always achievable when using the uniform-maintenance criterion. The crossover and permutation algorithm implemented within the genetic algorithm is adapted taking into account considering the peculiarities of the agents engaged in solving the problem that has been set out. We have studied the possibility of using various types of crossover and permutation to construct the cycle diagrams and influence of the parameters of the genetic algorithm on the results. The obtained analytical results are tested for the conditions of the Moscow subway.</abstract><cop>Moscow</cop><pub>Pleiades Publishing</pub><doi>10.3103/S106837121712015X</doi><tpages>3</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1068-3712
ispartof Russian electrical engineering, 2017, Vol.88 (12), p.839-841
issn 1068-3712
1934-8010
language eng
recordid cdi_proquest_journals_2007131043
source Springer Nature - Complete Springer Journals
subjects Criteria
Engineering
Genetic algorithms
Graph theory
Machines
Maintenance
Manufacturing
Permutations
Processes
Rolling stock
Traffic safety
title Planning Electric-Rolling-Stock Maintenance in Conditions of Limited Resources
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T21%3A03%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Planning%20Electric-Rolling-Stock%20Maintenance%20in%20Conditions%20of%20Limited%20Resources&rft.jtitle=Russian%20electrical%20engineering&rft.au=Sidorenko,%20V.%20G.&rft.date=2017&rft.volume=88&rft.issue=12&rft.spage=839&rft.epage=841&rft.pages=839-841&rft.issn=1068-3712&rft.eissn=1934-8010&rft_id=info:doi/10.3103/S106837121712015X&rft_dat=%3Cproquest_cross%3E2007131043%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2007131043&rft_id=info:pmid/&rfr_iscdi=true