A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device
In this paper, a mathematical model is developed for a manufacturing cell of two manufacturing stages with a single-storage buffer and a transfer robot for loading, unloading and moving parts into and out of the buffer. Both stages and the transfer robot are subject to failure. The cell is modeled a...
Gespeichert in:
Veröffentlicht in: | International journal of production economics 2000-01, Vol.63 (1), p.69-81 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 81 |
---|---|
container_issue | 1 |
container_start_page | 69 |
container_title | International journal of production economics |
container_volume | 63 |
creator | Suliman, S.M.A. |
description | In this paper, a mathematical model is developed for a manufacturing cell of two manufacturing stages with a single-storage buffer and a transfer robot for loading, unloading and moving parts into and out of the buffer. Both stages and the transfer robot are subject to failure. The cell is modeled as a random Markov process on the assumption that time to failure and time to repair are exponentially distributed. The output of such manufacturing cell is established, and as expected, it is less than that where the transfer means are continuously available. |
doi_str_mv | 10.1016/S0925-5273(99)00006-7 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_198941407</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0925527399000067</els_id><sourcerecordid>51690701</sourcerecordid><originalsourceid>FETCH-LOGICAL-c430t-f6b78c1058a5e3ab8daca186ad0387c6f463b0c5b615cbb8cc926a7aa973fb253</originalsourceid><addsrcrecordid>eNqFUE2LFDEQDaLguPoThOBJD61JZ_J1kmVRV1jwoJ5Dpbqyk6Wne0ynZ9l_b2ZH9mrBqzrUe6-Kx9hbKT5KIc2nn8L3utO9Ve-9_yBamc4-YxvprOqstv452zxRXrJXy3LXOFY6t2F4yfdQd9RaRhj5fh5o5GkuHHhcU6JCA6_3c7dUuKXGndYEWNeSp1uONI78Ptcdh4mvU6ExQxyJ1wLT0qR8oGNGes1eJBgXevNvXrDfX7_8urrubn58-351edPhVonaJROtQym0A00KohsAQToDg1DOoklbo6JAHY3UGKND9L0BC-CtSrHX6oK9O_seyvxnpaWGu3ktUzsZpHd-K7fCNpI-k7DMy1IohUPJeygPQYpwijM8xhlOWQXvw2Oc4aS7PusKHQifRETUrhHO4RgUGNXaQ0PfVG3kBtlwOO18cDLs6r5ZfT5bUQvjmKmEBTNNSEMuhDUMc_7PM38BqpyWog</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>198941407</pqid></control><display><type>article</type><title>A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device</title><source>RePEc</source><source>Elsevier ScienceDirect Journals</source><creator>Suliman, S.M.A.</creator><creatorcontrib>Suliman, S.M.A.</creatorcontrib><description>In this paper, a mathematical model is developed for a manufacturing cell of two manufacturing stages with a single-storage buffer and a transfer robot for loading, unloading and moving parts into and out of the buffer. Both stages and the transfer robot are subject to failure. The cell is modeled as a random Markov process on the assumption that time to failure and time to repair are exponentially distributed. The output of such manufacturing cell is established, and as expected, it is less than that where the transfer means are continuously available.</description><identifier>ISSN: 0925-5273</identifier><identifier>EISSN: 1873-7579</identifier><identifier>DOI: 10.1016/S0925-5273(99)00006-7</identifier><identifier>CODEN: IJPCEY</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Buffers ; Manufacturing ; Manufacturing cells ; Markov analysis ; Mathematical modeling ; Mathematical models ; Performance evaluation ; Robots ; Studies ; Transfer robot</subject><ispartof>International journal of production economics, 2000-01, Vol.63 (1), p.69-81</ispartof><rights>2000 Elsevier Science B.V.</rights><rights>Copyright Elsevier Sequoia S.A. Jan 5, 2000</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c430t-f6b78c1058a5e3ab8daca186ad0387c6f463b0c5b615cbb8cc926a7aa973fb253</citedby><cites>FETCH-LOGICAL-c430t-f6b78c1058a5e3ab8daca186ad0387c6f463b0c5b615cbb8cc926a7aa973fb253</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0925527399000067$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,3994,27901,27902,65306</link.rule.ids><backlink>$$Uhttp://econpapers.repec.org/article/eeeproeco/v_3a63_3ay_3a2000_3ai_3a1_3ap_3a69-81.htm$$DView record in RePEc$$Hfree_for_read</backlink></links><search><creatorcontrib>Suliman, S.M.A.</creatorcontrib><title>A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device</title><title>International journal of production economics</title><description>In this paper, a mathematical model is developed for a manufacturing cell of two manufacturing stages with a single-storage buffer and a transfer robot for loading, unloading and moving parts into and out of the buffer. Both stages and the transfer robot are subject to failure. The cell is modeled as a random Markov process on the assumption that time to failure and time to repair are exponentially distributed. The output of such manufacturing cell is established, and as expected, it is less than that where the transfer means are continuously available.</description><subject>Buffers</subject><subject>Manufacturing</subject><subject>Manufacturing cells</subject><subject>Markov analysis</subject><subject>Mathematical modeling</subject><subject>Mathematical models</subject><subject>Performance evaluation</subject><subject>Robots</subject><subject>Studies</subject><subject>Transfer robot</subject><issn>0925-5273</issn><issn>1873-7579</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2000</creationdate><recordtype>article</recordtype><sourceid>X2L</sourceid><recordid>eNqFUE2LFDEQDaLguPoThOBJD61JZ_J1kmVRV1jwoJ5Dpbqyk6Wne0ynZ9l_b2ZH9mrBqzrUe6-Kx9hbKT5KIc2nn8L3utO9Ve-9_yBamc4-YxvprOqstv452zxRXrJXy3LXOFY6t2F4yfdQd9RaRhj5fh5o5GkuHHhcU6JCA6_3c7dUuKXGndYEWNeSp1uONI78Ptcdh4mvU6ExQxyJ1wLT0qR8oGNGes1eJBgXevNvXrDfX7_8urrubn58-351edPhVonaJROtQym0A00KohsAQToDg1DOoklbo6JAHY3UGKND9L0BC-CtSrHX6oK9O_seyvxnpaWGu3ktUzsZpHd-K7fCNpI-k7DMy1IohUPJeygPQYpwijM8xhlOWQXvw2Oc4aS7PusKHQifRETUrhHO4RgUGNXaQ0PfVG3kBtlwOO18cDLs6r5ZfT5bUQvjmKmEBTNNSEMuhDUMc_7PM38BqpyWog</recordid><startdate>20000105</startdate><enddate>20000105</enddate><creator>Suliman, S.M.A.</creator><general>Elsevier B.V</general><general>Elsevier</general><general>Elsevier Sequoia S.A</general><scope>DKI</scope><scope>X2L</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope></search><sort><creationdate>20000105</creationdate><title>A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device</title><author>Suliman, S.M.A.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c430t-f6b78c1058a5e3ab8daca186ad0387c6f463b0c5b615cbb8cc926a7aa973fb253</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2000</creationdate><topic>Buffers</topic><topic>Manufacturing</topic><topic>Manufacturing cells</topic><topic>Markov analysis</topic><topic>Mathematical modeling</topic><topic>Mathematical models</topic><topic>Performance evaluation</topic><topic>Robots</topic><topic>Studies</topic><topic>Transfer robot</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Suliman, S.M.A.</creatorcontrib><collection>RePEc IDEAS</collection><collection>RePEc</collection><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>International journal of production economics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Suliman, S.M.A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device</atitle><jtitle>International journal of production economics</jtitle><date>2000-01-05</date><risdate>2000</risdate><volume>63</volume><issue>1</issue><spage>69</spage><epage>81</epage><pages>69-81</pages><issn>0925-5273</issn><eissn>1873-7579</eissn><coden>IJPCEY</coden><abstract>In this paper, a mathematical model is developed for a manufacturing cell of two manufacturing stages with a single-storage buffer and a transfer robot for loading, unloading and moving parts into and out of the buffer. Both stages and the transfer robot are subject to failure. The cell is modeled as a random Markov process on the assumption that time to failure and time to repair are exponentially distributed. The output of such manufacturing cell is established, and as expected, it is less than that where the transfer means are continuously available.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/S0925-5273(99)00006-7</doi><tpages>13</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0925-5273 |
ispartof | International journal of production economics, 2000-01, Vol.63 (1), p.69-81 |
issn | 0925-5273 1873-7579 |
language | eng |
recordid | cdi_proquest_journals_198941407 |
source | RePEc; Elsevier ScienceDirect Journals |
subjects | Buffers Manufacturing Manufacturing cells Markov analysis Mathematical modeling Mathematical models Performance evaluation Robots Studies Transfer robot |
title | A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T21%3A07%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20mathematical%20model%20for%20a%20buffered%20two-stage%20manufacturing%20cell%20with%20an%20unreliable%20transfer%20device&rft.jtitle=International%20journal%20of%20production%20economics&rft.au=Suliman,%20S.M.A.&rft.date=2000-01-05&rft.volume=63&rft.issue=1&rft.spage=69&rft.epage=81&rft.pages=69-81&rft.issn=0925-5273&rft.eissn=1873-7579&rft.coden=IJPCEY&rft_id=info:doi/10.1016/S0925-5273(99)00006-7&rft_dat=%3Cproquest_cross%3E51690701%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=198941407&rft_id=info:pmid/&rft_els_id=S0925527399000067&rfr_iscdi=true |