Investigations on the availability of second shutdown system of Indian FBR
•Realisation of high availability for second shutdown system.•Development & qualification of sodium immersed EM clutch.•A new method for testing the ARDMs against flow induced vibrations.•In-situ cleaning of sodium immersed armature.•Alternative design concepts to further enhance the availabilit...
Gespeichert in:
Veröffentlicht in: | Nuclear engineering and design 2017-08, Vol.319, p.91-105 |
---|---|
Hauptverfasser: | , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 105 |
---|---|
container_issue | |
container_start_page | 91 |
container_title | Nuclear engineering and design |
container_volume | 319 |
creator | Patri, Sudheer Vijayashree, R. Suresh Kumar, S. Anup Kumar, P. Sabih, Muhammad Chandramouli, S. Narayana Rao, P. Meikandamurthy, C. Prakash, V. Selvaraj, P. |
description | •Realisation of high availability for second shutdown system.•Development & qualification of sodium immersed EM clutch.•A new method for testing the ARDMs against flow induced vibrations.•In-situ cleaning of sodium immersed armature.•Alternative design concepts to further enhance the availability of ARDMs.
Design and operating nuclear power plants with higher capacity factors is always desirable for improved economics and it is further more important in case of fast breeder reactors. It is well recognised that the availability of shutdown systems has an important bearing on the plant availability. In this paper, various investigations carried out on the availability of the second shutdown of Indian FBR are reported. The stability of the system performance against a range of anticipated disturbances was studied. Studies were designed to gain better technical insight into the system performance and to aid in finding out the performance bounds.
Based on the design review of second shutdown system, in-house and international experiences, investigations related to the electromagnetic coupling, flow induced vibrations, subassembly bowing and the deterioration of electromagnet parting plane were carried out as part of the current experimental programme. Various innovative methods/schemes were adopted in the studies. These investigations helped in identifying the design vulnerabilities and thus in improving the system design, qualifying respective analytical/numerical studies, providing direction for further enhancement in system performance, demonstrating the margins available in the system design and more importantly much needed insights into various phenomenons to attend any unforeseen availability related issues of second shutdown system during their operation in reactor. Alternative design concepts were also discussed. |
doi_str_mv | 10.1016/j.nucengdes.2017.05.004 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_1941699893</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0029549317302285</els_id><sourcerecordid>1941699893</sourcerecordid><originalsourceid>FETCH-LOGICAL-c401t-d14a7554a61839f36d92f176e0b201d439093fb5120d062925f6a7defe3b394f3</originalsourceid><addsrcrecordid>eNqFkE9LAzEQxYMoWKufwYDnXfN3tznWYrVSEETBW8hukjZLm9QkrfTbu0vFq3OZw7z3ZuYHwC1GJUa4uu9Kv2-NX2mTSoJwXSJeIsTOwAhPalLUXHyegxFCRBScCXoJrlLq0FCCjMDLwh9Mym6lsgs-weBhXhuoDsptVOM2Lh9hsDCZNngN03qfdfj2MB1TNtthsvDaKQ_nD2_X4MKqTTI3v30MPuaP77PnYvn6tJhNl0XLEM6FxkzVnDNV4QkVllZaEIvryqCmP18zKpCgtuGYII0qIgi3laq1sYY2VDBLx-DulLuL4WvfHy-7sI--XymxYLgSYiJor6pPqjaGlKKxchfdVsWjxEgO4GQn_8DJAZxEXPbgeuf05DT9EwdnokytM7412kXTZqmD-zfjB06Ieng</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1941699893</pqid></control><display><type>article</type><title>Investigations on the availability of second shutdown system of Indian FBR</title><source>Elsevier ScienceDirect Journals</source><creator>Patri, Sudheer ; Vijayashree, R. ; Suresh Kumar, S. ; Anup Kumar, P. ; Sabih, Muhammad ; Chandramouli, S. ; Narayana Rao, P. ; Meikandamurthy, C. ; Prakash, V. ; Selvaraj, P.</creator><creatorcontrib>Patri, Sudheer ; Vijayashree, R. ; Suresh Kumar, S. ; Anup Kumar, P. ; Sabih, Muhammad ; Chandramouli, S. ; Narayana Rao, P. ; Meikandamurthy, C. ; Prakash, V. ; Selvaraj, P.</creatorcontrib><description>•Realisation of high availability for second shutdown system.•Development & qualification of sodium immersed EM clutch.•A new method for testing the ARDMs against flow induced vibrations.•In-situ cleaning of sodium immersed armature.•Alternative design concepts to further enhance the availability of ARDMs.
Design and operating nuclear power plants with higher capacity factors is always desirable for improved economics and it is further more important in case of fast breeder reactors. It is well recognised that the availability of shutdown systems has an important bearing on the plant availability. In this paper, various investigations carried out on the availability of the second shutdown of Indian FBR are reported. The stability of the system performance against a range of anticipated disturbances was studied. Studies were designed to gain better technical insight into the system performance and to aid in finding out the performance bounds.
Based on the design review of second shutdown system, in-house and international experiences, investigations related to the electromagnetic coupling, flow induced vibrations, subassembly bowing and the deterioration of electromagnet parting plane were carried out as part of the current experimental programme. Various innovative methods/schemes were adopted in the studies. These investigations helped in identifying the design vulnerabilities and thus in improving the system design, qualifying respective analytical/numerical studies, providing direction for further enhancement in system performance, demonstrating the margins available in the system design and more importantly much needed insights into various phenomenons to attend any unforeseen availability related issues of second shutdown system during their operation in reactor. Alternative design concepts were also discussed.</description><identifier>ISSN: 0029-5493</identifier><identifier>EISSN: 1872-759X</identifier><identifier>DOI: 10.1016/j.nucengdes.2017.05.004</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Availability ; Availability of shutdown systems ; Bowing ; Breeder reactors ; Design ; Design engineering ; Electric power plants ; Electromagnetic coupling ; Electromagnetics ; Fast breeder ; Fast breeder reactor ; Flow generated vibrations ; Flow induced vibrations ; Identification methods ; Nuclear electric power generation ; Nuclear energy ; Nuclear engineering ; Nuclear power plants ; Nuclear reactors ; PFBR ; Reactors ; Shut down system ; Subassemblies ; Systems design ; Vibration ; Vibrations</subject><ispartof>Nuclear engineering and design, 2017-08, Vol.319, p.91-105</ispartof><rights>2017 Elsevier B.V.</rights><rights>Copyright Elsevier BV Aug 1, 2017</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c401t-d14a7554a61839f36d92f176e0b201d439093fb5120d062925f6a7defe3b394f3</citedby><cites>FETCH-LOGICAL-c401t-d14a7554a61839f36d92f176e0b201d439093fb5120d062925f6a7defe3b394f3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.nucengdes.2017.05.004$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,777,781,3537,27905,27906,45976</link.rule.ids></links><search><creatorcontrib>Patri, Sudheer</creatorcontrib><creatorcontrib>Vijayashree, R.</creatorcontrib><creatorcontrib>Suresh Kumar, S.</creatorcontrib><creatorcontrib>Anup Kumar, P.</creatorcontrib><creatorcontrib>Sabih, Muhammad</creatorcontrib><creatorcontrib>Chandramouli, S.</creatorcontrib><creatorcontrib>Narayana Rao, P.</creatorcontrib><creatorcontrib>Meikandamurthy, C.</creatorcontrib><creatorcontrib>Prakash, V.</creatorcontrib><creatorcontrib>Selvaraj, P.</creatorcontrib><title>Investigations on the availability of second shutdown system of Indian FBR</title><title>Nuclear engineering and design</title><description>•Realisation of high availability for second shutdown system.•Development & qualification of sodium immersed EM clutch.•A new method for testing the ARDMs against flow induced vibrations.•In-situ cleaning of sodium immersed armature.•Alternative design concepts to further enhance the availability of ARDMs.
Design and operating nuclear power plants with higher capacity factors is always desirable for improved economics and it is further more important in case of fast breeder reactors. It is well recognised that the availability of shutdown systems has an important bearing on the plant availability. In this paper, various investigations carried out on the availability of the second shutdown of Indian FBR are reported. The stability of the system performance against a range of anticipated disturbances was studied. Studies were designed to gain better technical insight into the system performance and to aid in finding out the performance bounds.
Based on the design review of second shutdown system, in-house and international experiences, investigations related to the electromagnetic coupling, flow induced vibrations, subassembly bowing and the deterioration of electromagnet parting plane were carried out as part of the current experimental programme. Various innovative methods/schemes were adopted in the studies. These investigations helped in identifying the design vulnerabilities and thus in improving the system design, qualifying respective analytical/numerical studies, providing direction for further enhancement in system performance, demonstrating the margins available in the system design and more importantly much needed insights into various phenomenons to attend any unforeseen availability related issues of second shutdown system during their operation in reactor. Alternative design concepts were also discussed.</description><subject>Availability</subject><subject>Availability of shutdown systems</subject><subject>Bowing</subject><subject>Breeder reactors</subject><subject>Design</subject><subject>Design engineering</subject><subject>Electric power plants</subject><subject>Electromagnetic coupling</subject><subject>Electromagnetics</subject><subject>Fast breeder</subject><subject>Fast breeder reactor</subject><subject>Flow generated vibrations</subject><subject>Flow induced vibrations</subject><subject>Identification methods</subject><subject>Nuclear electric power generation</subject><subject>Nuclear energy</subject><subject>Nuclear engineering</subject><subject>Nuclear power plants</subject><subject>Nuclear reactors</subject><subject>PFBR</subject><subject>Reactors</subject><subject>Shut down system</subject><subject>Subassemblies</subject><subject>Systems design</subject><subject>Vibration</subject><subject>Vibrations</subject><issn>0029-5493</issn><issn>1872-759X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2017</creationdate><recordtype>article</recordtype><recordid>eNqFkE9LAzEQxYMoWKufwYDnXfN3tznWYrVSEETBW8hukjZLm9QkrfTbu0vFq3OZw7z3ZuYHwC1GJUa4uu9Kv2-NX2mTSoJwXSJeIsTOwAhPalLUXHyegxFCRBScCXoJrlLq0FCCjMDLwh9Mym6lsgs-weBhXhuoDsptVOM2Lh9hsDCZNngN03qfdfj2MB1TNtthsvDaKQ_nD2_X4MKqTTI3v30MPuaP77PnYvn6tJhNl0XLEM6FxkzVnDNV4QkVllZaEIvryqCmP18zKpCgtuGYII0qIgi3laq1sYY2VDBLx-DulLuL4WvfHy-7sI--XymxYLgSYiJor6pPqjaGlKKxchfdVsWjxEgO4GQn_8DJAZxEXPbgeuf05DT9EwdnokytM7412kXTZqmD-zfjB06Ieng</recordid><startdate>20170801</startdate><enddate>20170801</enddate><creator>Patri, Sudheer</creator><creator>Vijayashree, R.</creator><creator>Suresh Kumar, S.</creator><creator>Anup Kumar, P.</creator><creator>Sabih, Muhammad</creator><creator>Chandramouli, S.</creator><creator>Narayana Rao, P.</creator><creator>Meikandamurthy, C.</creator><creator>Prakash, V.</creator><creator>Selvaraj, P.</creator><general>Elsevier B.V</general><general>Elsevier BV</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7ST</scope><scope>7TB</scope><scope>8FD</scope><scope>C1K</scope><scope>FR3</scope><scope>KR7</scope><scope>L7M</scope><scope>SOI</scope></search><sort><creationdate>20170801</creationdate><title>Investigations on the availability of second shutdown system of Indian FBR</title><author>Patri, Sudheer ; Vijayashree, R. ; Suresh Kumar, S. ; Anup Kumar, P. ; Sabih, Muhammad ; Chandramouli, S. ; Narayana Rao, P. ; Meikandamurthy, C. ; Prakash, V. ; Selvaraj, P.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c401t-d14a7554a61839f36d92f176e0b201d439093fb5120d062925f6a7defe3b394f3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2017</creationdate><topic>Availability</topic><topic>Availability of shutdown systems</topic><topic>Bowing</topic><topic>Breeder reactors</topic><topic>Design</topic><topic>Design engineering</topic><topic>Electric power plants</topic><topic>Electromagnetic coupling</topic><topic>Electromagnetics</topic><topic>Fast breeder</topic><topic>Fast breeder reactor</topic><topic>Flow generated vibrations</topic><topic>Flow induced vibrations</topic><topic>Identification methods</topic><topic>Nuclear electric power generation</topic><topic>Nuclear energy</topic><topic>Nuclear engineering</topic><topic>Nuclear power plants</topic><topic>Nuclear reactors</topic><topic>PFBR</topic><topic>Reactors</topic><topic>Shut down system</topic><topic>Subassemblies</topic><topic>Systems design</topic><topic>Vibration</topic><topic>Vibrations</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Patri, Sudheer</creatorcontrib><creatorcontrib>Vijayashree, R.</creatorcontrib><creatorcontrib>Suresh Kumar, S.</creatorcontrib><creatorcontrib>Anup Kumar, P.</creatorcontrib><creatorcontrib>Sabih, Muhammad</creatorcontrib><creatorcontrib>Chandramouli, S.</creatorcontrib><creatorcontrib>Narayana Rao, P.</creatorcontrib><creatorcontrib>Meikandamurthy, C.</creatorcontrib><creatorcontrib>Prakash, V.</creatorcontrib><creatorcontrib>Selvaraj, P.</creatorcontrib><collection>CrossRef</collection><collection>Electronics & Communications Abstracts</collection><collection>Environment Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Environmental Sciences and Pollution Management</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Environment Abstracts</collection><jtitle>Nuclear engineering and design</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Patri, Sudheer</au><au>Vijayashree, R.</au><au>Suresh Kumar, S.</au><au>Anup Kumar, P.</au><au>Sabih, Muhammad</au><au>Chandramouli, S.</au><au>Narayana Rao, P.</au><au>Meikandamurthy, C.</au><au>Prakash, V.</au><au>Selvaraj, P.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Investigations on the availability of second shutdown system of Indian FBR</atitle><jtitle>Nuclear engineering and design</jtitle><date>2017-08-01</date><risdate>2017</risdate><volume>319</volume><spage>91</spage><epage>105</epage><pages>91-105</pages><issn>0029-5493</issn><eissn>1872-759X</eissn><abstract>•Realisation of high availability for second shutdown system.•Development & qualification of sodium immersed EM clutch.•A new method for testing the ARDMs against flow induced vibrations.•In-situ cleaning of sodium immersed armature.•Alternative design concepts to further enhance the availability of ARDMs.
Design and operating nuclear power plants with higher capacity factors is always desirable for improved economics and it is further more important in case of fast breeder reactors. It is well recognised that the availability of shutdown systems has an important bearing on the plant availability. In this paper, various investigations carried out on the availability of the second shutdown of Indian FBR are reported. The stability of the system performance against a range of anticipated disturbances was studied. Studies were designed to gain better technical insight into the system performance and to aid in finding out the performance bounds.
Based on the design review of second shutdown system, in-house and international experiences, investigations related to the electromagnetic coupling, flow induced vibrations, subassembly bowing and the deterioration of electromagnet parting plane were carried out as part of the current experimental programme. Various innovative methods/schemes were adopted in the studies. These investigations helped in identifying the design vulnerabilities and thus in improving the system design, qualifying respective analytical/numerical studies, providing direction for further enhancement in system performance, demonstrating the margins available in the system design and more importantly much needed insights into various phenomenons to attend any unforeseen availability related issues of second shutdown system during their operation in reactor. Alternative design concepts were also discussed.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/j.nucengdes.2017.05.004</doi><tpages>15</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0029-5493 |
ispartof | Nuclear engineering and design, 2017-08, Vol.319, p.91-105 |
issn | 0029-5493 1872-759X |
language | eng |
recordid | cdi_proquest_journals_1941699893 |
source | Elsevier ScienceDirect Journals |
subjects | Availability Availability of shutdown systems Bowing Breeder reactors Design Design engineering Electric power plants Electromagnetic coupling Electromagnetics Fast breeder Fast breeder reactor Flow generated vibrations Flow induced vibrations Identification methods Nuclear electric power generation Nuclear energy Nuclear engineering Nuclear power plants Nuclear reactors PFBR Reactors Shut down system Subassemblies Systems design Vibration Vibrations |
title | Investigations on the availability of second shutdown system of Indian FBR |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T16%3A24%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Investigations%20on%20the%20availability%20of%20second%20shutdown%20system%20of%20Indian%20FBR&rft.jtitle=Nuclear%20engineering%20and%20design&rft.au=Patri,%20Sudheer&rft.date=2017-08-01&rft.volume=319&rft.spage=91&rft.epage=105&rft.pages=91-105&rft.issn=0029-5493&rft.eissn=1872-759X&rft_id=info:doi/10.1016/j.nucengdes.2017.05.004&rft_dat=%3Cproquest_cross%3E1941699893%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1941699893&rft_id=info:pmid/&rft_els_id=S0029549317302285&rfr_iscdi=true |