Evaluating the use of mineral pumice in falling zones of internal pressure tunnels (Case study: Water transfer tunnel of Sardasht dam power plant)

Internal pressure tunnels and wells that are mainly used to transfer water from dam reservoirs to electrical power plants in rivers downstream are considered among the power plant’s permanent facilities. In order to design reinforced concrete structures in these tunnels, recognizing the concrete lin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of mining science 2016-11, Vol.52 (6), p.1060-1068
Hauptverfasser: Haeri, H., Tavakoli, H., Shemirani, A. B., Sarfarazi, V., Farazmand, M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Internal pressure tunnels and wells that are mainly used to transfer water from dam reservoirs to electrical power plants in rivers downstream are considered among the power plant’s permanent facilities. In order to design reinforced concrete structures in these tunnels, recognizing the concrete lining behavior and interaction between rock mass and concrete and also the effect of internal pressure on the concrete shell and rock mass is of great significance. One of the important and effective issues in inner lining forces is their filler type. In this paper, using the finite difference method by the FLAC software, the analysis of Sardasht dam water tunnel which has been filled with mineral pumice in falling zones has been carried out. Results indicate that by increasing the falling zone thickness while the lining is porous or non-porous, the inner forces are decreased.
ISSN:1062-7391
1573-8736
DOI:10.1134/S106273911606160X