Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization

The amount of waste generated in construction and demolition (C&D) processes is enormous. Therefore, many studies on efficient C&D waste minimization and management have been conducted. However, 21 process-related and 8 technology-related limitations in C&D waste management and minimizat...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Automation in construction 2017-07, Vol.79, p.3-18
Hauptverfasser: Won, Jongsung, Cheng, Jack C.P.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 18
container_issue
container_start_page 3
container_title Automation in construction
container_volume 79
creator Won, Jongsung
Cheng, Jack C.P.
description The amount of waste generated in construction and demolition (C&D) processes is enormous. Therefore, many studies on efficient C&D waste minimization and management have been conducted. However, 21 process-related and 8 technology-related limitations in C&D waste management and minimization have not yet been resolved. Building information modeling (BIM) helps project participants improve the processes and technologies in the planning, design, construction, and demolition phases, thereby managing and minimizing C&D waste efficiently. Therefore, this paper identifies the potential opportunities of BIM for efficient C&D waste management and minimization, such as design review, 3D coordination, quantity take-off, phase planning, site utilization planning, construction system design, digital fabrication, and 3D control and planning. The BIM-based approaches can support C&D waste management and minimization processes and technologies by addressing existing limitations through in-depth literature review. The roles of project participants and information required for each BIM-based approach in C&D waste management and minimization are discussed with illustrative process maps. •Opportunities of BIM for C&D waste management and minimization are identified.•Limitations in C&D waste management processes and technologies are identified.•Eight BIM uses are selected to support C&D waste management and minimization.•Approaches to address the identified limitations by BIM uses are developed.•Results of this study are established through in-depth literature review.
doi_str_mv 10.1016/j.autcon.2017.02.002
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_1919588561</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0926580517301735</els_id><sourcerecordid>1919588561</sourcerecordid><originalsourceid>FETCH-LOGICAL-c400t-ae302b0ddfebefbd0411010a85d623e01463c2f84055d87271555e1b821b89273</originalsourceid><addsrcrecordid>eNp9kE1LxDAQhoMouK7-Aw8Fz62TbNOPiyCLX7DgRc8hbaZLljapSaqsP8Dfbbrr2UMIM_PO-zIPIdcUMgq0uN1lcgqtNRkDWmbAMgB2Qha0KllaVjU9JQuoWZHyCvg5ufB-BwAlFPWC_LwoNEF3e222yWjDXMg-seNoXZiMDhp9YrukmXSvZo02nXWDDNqaZLAK-7kZW0nM98FN7WEijUoUDrbXh_JL-oDJII3c4hAjDvNBGz3o74PVJTnrZO_x6u9fkvfHh7f1c7p5fXpZ32_SNgcIqcQVsAaU6rDBrlGQ0wgAZMVVwVYINC9WLeuqHDhX8fqScs6RNhWLr2blaklujr6jsx8T-iB2dnImRgpa05pXFS9oVOVHVeus9w47MTo9SLcXFMRMXOzEkbiYiQtgIhKPa3fHNYwXfGp0wrcaTYtKO2yDUFb_b_AL4qCPgQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1919588561</pqid></control><display><type>article</type><title>Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization</title><source>Elsevier ScienceDirect Journals</source><creator>Won, Jongsung ; Cheng, Jack C.P.</creator><creatorcontrib>Won, Jongsung ; Cheng, Jack C.P.</creatorcontrib><description><![CDATA[The amount of waste generated in construction and demolition (C&D) processes is enormous. Therefore, many studies on efficient C&D waste minimization and management have been conducted. However, 21 process-related and 8 technology-related limitations in C&D waste management and minimization have not yet been resolved. Building information modeling (BIM) helps project participants improve the processes and technologies in the planning, design, construction, and demolition phases, thereby managing and minimizing C&D waste efficiently. Therefore, this paper identifies the potential opportunities of BIM for efficient C&D waste management and minimization, such as design review, 3D coordination, quantity take-off, phase planning, site utilization planning, construction system design, digital fabrication, and 3D control and planning. The BIM-based approaches can support C&D waste management and minimization processes and technologies by addressing existing limitations through in-depth literature review. The roles of project participants and information required for each BIM-based approach in C&D waste management and minimization are discussed with illustrative process maps. •Opportunities of BIM for C&D waste management and minimization are identified.•Limitations in C&D waste management processes and technologies are identified.•Eight BIM uses are selected to support C&D waste management and minimization.•Approaches to address the identified limitations by BIM uses are developed.•Results of this study are established through in-depth literature review.]]></description><identifier>ISSN: 0926-5805</identifier><identifier>EISSN: 1872-7891</identifier><identifier>DOI: 10.1016/j.autcon.2017.02.002</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>BIM use ; Building information modeling ; Building information modeling (BIM) ; Building management systems ; Construction ; Construction and demolition (C&amp;D) waste ; Construction materials ; Construction planning ; Construction sites ; Control systems ; Demolition ; Design improvements ; Literature reviews ; Optimization ; Process ; Systems design ; Takeoff ; Waste disposal ; Waste management ; Waste management industry</subject><ispartof>Automation in construction, 2017-07, Vol.79, p.3-18</ispartof><rights>2017 Elsevier B.V.</rights><rights>Copyright Elsevier BV Jul 2017</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c400t-ae302b0ddfebefbd0411010a85d623e01463c2f84055d87271555e1b821b89273</citedby><cites>FETCH-LOGICAL-c400t-ae302b0ddfebefbd0411010a85d623e01463c2f84055d87271555e1b821b89273</cites><orcidid>0000-0002-2218-247X ; 0000-0002-1722-2617</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0926580517301735$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27901,27902,65306</link.rule.ids></links><search><creatorcontrib>Won, Jongsung</creatorcontrib><creatorcontrib>Cheng, Jack C.P.</creatorcontrib><title>Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization</title><title>Automation in construction</title><description><![CDATA[The amount of waste generated in construction and demolition (C&D) processes is enormous. Therefore, many studies on efficient C&D waste minimization and management have been conducted. However, 21 process-related and 8 technology-related limitations in C&D waste management and minimization have not yet been resolved. Building information modeling (BIM) helps project participants improve the processes and technologies in the planning, design, construction, and demolition phases, thereby managing and minimizing C&D waste efficiently. Therefore, this paper identifies the potential opportunities of BIM for efficient C&D waste management and minimization, such as design review, 3D coordination, quantity take-off, phase planning, site utilization planning, construction system design, digital fabrication, and 3D control and planning. The BIM-based approaches can support C&D waste management and minimization processes and technologies by addressing existing limitations through in-depth literature review. The roles of project participants and information required for each BIM-based approach in C&D waste management and minimization are discussed with illustrative process maps. •Opportunities of BIM for C&D waste management and minimization are identified.•Limitations in C&D waste management processes and technologies are identified.•Eight BIM uses are selected to support C&D waste management and minimization.•Approaches to address the identified limitations by BIM uses are developed.•Results of this study are established through in-depth literature review.]]></description><subject>BIM use</subject><subject>Building information modeling</subject><subject>Building information modeling (BIM)</subject><subject>Building management systems</subject><subject>Construction</subject><subject>Construction and demolition (C&amp;D) waste</subject><subject>Construction materials</subject><subject>Construction planning</subject><subject>Construction sites</subject><subject>Control systems</subject><subject>Demolition</subject><subject>Design improvements</subject><subject>Literature reviews</subject><subject>Optimization</subject><subject>Process</subject><subject>Systems design</subject><subject>Takeoff</subject><subject>Waste disposal</subject><subject>Waste management</subject><subject>Waste management industry</subject><issn>0926-5805</issn><issn>1872-7891</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2017</creationdate><recordtype>article</recordtype><recordid>eNp9kE1LxDAQhoMouK7-Aw8Fz62TbNOPiyCLX7DgRc8hbaZLljapSaqsP8Dfbbrr2UMIM_PO-zIPIdcUMgq0uN1lcgqtNRkDWmbAMgB2Qha0KllaVjU9JQuoWZHyCvg5ufB-BwAlFPWC_LwoNEF3e222yWjDXMg-seNoXZiMDhp9YrukmXSvZo02nXWDDNqaZLAK-7kZW0nM98FN7WEijUoUDrbXh_JL-oDJII3c4hAjDvNBGz3o74PVJTnrZO_x6u9fkvfHh7f1c7p5fXpZ32_SNgcIqcQVsAaU6rDBrlGQ0wgAZMVVwVYINC9WLeuqHDhX8fqScs6RNhWLr2blaklujr6jsx8T-iB2dnImRgpa05pXFS9oVOVHVeus9w47MTo9SLcXFMRMXOzEkbiYiQtgIhKPa3fHNYwXfGp0wrcaTYtKO2yDUFb_b_AL4qCPgQ</recordid><startdate>201707</startdate><enddate>201707</enddate><creator>Won, Jongsung</creator><creator>Cheng, Jack C.P.</creator><general>Elsevier B.V</general><general>Elsevier BV</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>7SP</scope><scope>8FD</scope><scope>FR3</scope><scope>JQ2</scope><scope>KR7</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope><orcidid>https://orcid.org/0000-0002-2218-247X</orcidid><orcidid>https://orcid.org/0000-0002-1722-2617</orcidid></search><sort><creationdate>201707</creationdate><title>Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization</title><author>Won, Jongsung ; Cheng, Jack C.P.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c400t-ae302b0ddfebefbd0411010a85d623e01463c2f84055d87271555e1b821b89273</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2017</creationdate><topic>BIM use</topic><topic>Building information modeling</topic><topic>Building information modeling (BIM)</topic><topic>Building management systems</topic><topic>Construction</topic><topic>Construction and demolition (C&amp;D) waste</topic><topic>Construction materials</topic><topic>Construction planning</topic><topic>Construction sites</topic><topic>Control systems</topic><topic>Demolition</topic><topic>Design improvements</topic><topic>Literature reviews</topic><topic>Optimization</topic><topic>Process</topic><topic>Systems design</topic><topic>Takeoff</topic><topic>Waste disposal</topic><topic>Waste management</topic><topic>Waste management industry</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Won, Jongsung</creatorcontrib><creatorcontrib>Cheng, Jack C.P.</creatorcontrib><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Electronics &amp; Communications Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts – Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>Automation in construction</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Won, Jongsung</au><au>Cheng, Jack C.P.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization</atitle><jtitle>Automation in construction</jtitle><date>2017-07</date><risdate>2017</risdate><volume>79</volume><spage>3</spage><epage>18</epage><pages>3-18</pages><issn>0926-5805</issn><eissn>1872-7891</eissn><abstract><![CDATA[The amount of waste generated in construction and demolition (C&D) processes is enormous. Therefore, many studies on efficient C&D waste minimization and management have been conducted. However, 21 process-related and 8 technology-related limitations in C&D waste management and minimization have not yet been resolved. Building information modeling (BIM) helps project participants improve the processes and technologies in the planning, design, construction, and demolition phases, thereby managing and minimizing C&D waste efficiently. Therefore, this paper identifies the potential opportunities of BIM for efficient C&D waste management and minimization, such as design review, 3D coordination, quantity take-off, phase planning, site utilization planning, construction system design, digital fabrication, and 3D control and planning. The BIM-based approaches can support C&D waste management and minimization processes and technologies by addressing existing limitations through in-depth literature review. The roles of project participants and information required for each BIM-based approach in C&D waste management and minimization are discussed with illustrative process maps. •Opportunities of BIM for C&D waste management and minimization are identified.•Limitations in C&D waste management processes and technologies are identified.•Eight BIM uses are selected to support C&D waste management and minimization.•Approaches to address the identified limitations by BIM uses are developed.•Results of this study are established through in-depth literature review.]]></abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/j.autcon.2017.02.002</doi><tpages>16</tpages><orcidid>https://orcid.org/0000-0002-2218-247X</orcidid><orcidid>https://orcid.org/0000-0002-1722-2617</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 0926-5805
ispartof Automation in construction, 2017-07, Vol.79, p.3-18
issn 0926-5805
1872-7891
language eng
recordid cdi_proquest_journals_1919588561
source Elsevier ScienceDirect Journals
subjects BIM use
Building information modeling
Building information modeling (BIM)
Building management systems
Construction
Construction and demolition (C&D) waste
Construction materials
Construction planning
Construction sites
Control systems
Demolition
Design improvements
Literature reviews
Optimization
Process
Systems design
Takeoff
Waste disposal
Waste management
Waste management industry
title Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T23%3A06%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Identifying%20potential%20opportunities%20of%20building%20information%20modeling%20for%20construction%20and%20demolition%20waste%20management%20and%20minimization&rft.jtitle=Automation%20in%20construction&rft.au=Won,%20Jongsung&rft.date=2017-07&rft.volume=79&rft.spage=3&rft.epage=18&rft.pages=3-18&rft.issn=0926-5805&rft.eissn=1872-7891&rft_id=info:doi/10.1016/j.autcon.2017.02.002&rft_dat=%3Cproquest_cross%3E1919588561%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1919588561&rft_id=info:pmid/&rft_els_id=S0926580517301735&rfr_iscdi=true