Substantiation of the cogeneration turbine unit selection for reconstruction of power units with a T-250/300-23.5 turbine

The selection of a cogeneration steam turbine unit (STU) for the reconstruction of power units with a T-250/300-23.5 turbine is substantiated by the example of power unit no. 9 at the cogeneration power station no. 22 (TETs-22) of Mosenergo Company. Series T-250 steam turbines have been developed fo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Thermal engineering 2016, Vol.63 (11), p.765-770
Hauptverfasser: Valamin, A. E., Kultyshev, A. Yu, Shibaev, T. L., Gol’dberg, A. A., Sakhnin, Yu. A., Stepanov, M. Yu, Bilan, V. N., Kadkina, I. V.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 770
container_issue 11
container_start_page 765
container_title Thermal engineering
container_volume 63
creator Valamin, A. E.
Kultyshev, A. Yu
Shibaev, T. L.
Gol’dberg, A. A.
Sakhnin, Yu. A.
Stepanov, M. Yu
Bilan, V. N.
Kadkina, I. V.
description The selection of a cogeneration steam turbine unit (STU) for the reconstruction of power units with a T-250/300-23.5 turbine is substantiated by the example of power unit no. 9 at the cogeneration power station no. 22 (TETs-22) of Mosenergo Company. Series T-250 steam turbines have been developed for combined heat and power generation. A total of 31 turbines were manufactured. By the end of 2015, the total operation time of prototype power units with the T-250/300-23.5 turbine exceeded 290000 hours. Considering the expiry of the service life, the decision was made that the reconstruction of the power unit at st. no. 9 of TETs-22 should be the first priority. The main issues that arose in developing this project—the customer’s requirements and the request for the reconstruction, the view on certain problems of Ural Turbine Works (UTZ) as the manufacturer of the main power unit equipment, and the opinions of other project parties—are examined. The decisions were made with account taken of the experience in operation of all Series T-250 turbines and the results of long-term discussions of pressing problems at scientific and technical councils, meetings, and negotiations. For the new power unit, the following parameters have been set: a live steam pressure of 23.5 MPa and live steam/reheat temperature of 565/565°C. Considering that the boiler equipment will be upgraded, the live steam flow is increased up to 1030 t/h. The reconstruction activities involving the replacement of the existing turbine with a new one will yield a service life of 250000 hours for turbine parts exposed to a temperature of 450°C or higher and 200000 hours for pipeline components. Hence, the decision has been made to reuse the arrangement of the existing turbine: a four-cylinder turbine unit comprising a high-pressure cylinder (HPC), two intermediate pressure cylinders (IPC-1 & 2), and a low-pressure cylinder (LPC). The flow path in the new turbine will have active blading in LPC and IPC-1. The information is also presented on the use of the existing foundations, the fact that the overall dimensions of the turbine unit compartment are not changed, the selection of the new turbine type, and the solutions adopted on the basis of this information as to LPC blading, steam admission type, issues associated with thermal displacements, etc.
doi_str_mv 10.1134/S0040601516110094
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_1880853030</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1880853030</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2794-2d308bb354bae0c02c43505597773417f230356829a2c498dbc93472952f29943</originalsourceid><addsrcrecordid>eNp1kEtrwzAQhEVpoWnaH9CboGcnq5dtHUvoCwI9JD0bWZETh1RKJZmQf185bqBQelp2Z75ZGITuCUwIYXy6AOCQAxEkJwRA8gs0IkKILGdALtGol7Nev0Y3IWzTyjkRI3RcdHWIysZWxdZZ7BocNwZrtzbW-OEWO1-31uDOthEHszP6dG6cx95oZ0P0nT7Te3cw_mQN-NDGDVZ4mVEBUwaQUTYR57hbdNWoXTB3P3OMPp6flrPXbP7-8jZ7nGeaFpJndMWgrGsmeK0MaKCaMwFCyKIoGCdFQxkwkZdUqiTJclVryXhBpaANlZKzMXoYcvfefXUmxGrrOm_Ty4qUJZQi8ZBcZHBp70Lwpqn2vv1U_lgRqPqGqz8NJ4YOTEheuzb-V_K_0DerJHqv</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1880853030</pqid></control><display><type>article</type><title>Substantiation of the cogeneration turbine unit selection for reconstruction of power units with a T-250/300-23.5 turbine</title><source>SpringerNature Journals</source><creator>Valamin, A. E. ; Kultyshev, A. Yu ; Shibaev, T. L. ; Gol’dberg, A. A. ; Sakhnin, Yu. A. ; Stepanov, M. Yu ; Bilan, V. N. ; Kadkina, I. V.</creator><creatorcontrib>Valamin, A. E. ; Kultyshev, A. Yu ; Shibaev, T. L. ; Gol’dberg, A. A. ; Sakhnin, Yu. A. ; Stepanov, M. Yu ; Bilan, V. N. ; Kadkina, I. V.</creatorcontrib><description>The selection of a cogeneration steam turbine unit (STU) for the reconstruction of power units with a T-250/300-23.5 turbine is substantiated by the example of power unit no. 9 at the cogeneration power station no. 22 (TETs-22) of Mosenergo Company. Series T-250 steam turbines have been developed for combined heat and power generation. A total of 31 turbines were manufactured. By the end of 2015, the total operation time of prototype power units with the T-250/300-23.5 turbine exceeded 290000 hours. Considering the expiry of the service life, the decision was made that the reconstruction of the power unit at st. no. 9 of TETs-22 should be the first priority. The main issues that arose in developing this project—the customer’s requirements and the request for the reconstruction, the view on certain problems of Ural Turbine Works (UTZ) as the manufacturer of the main power unit equipment, and the opinions of other project parties—are examined. The decisions were made with account taken of the experience in operation of all Series T-250 turbines and the results of long-term discussions of pressing problems at scientific and technical councils, meetings, and negotiations. For the new power unit, the following parameters have been set: a live steam pressure of 23.5 MPa and live steam/reheat temperature of 565/565°C. Considering that the boiler equipment will be upgraded, the live steam flow is increased up to 1030 t/h. The reconstruction activities involving the replacement of the existing turbine with a new one will yield a service life of 250000 hours for turbine parts exposed to a temperature of 450°C or higher and 200000 hours for pipeline components. Hence, the decision has been made to reuse the arrangement of the existing turbine: a four-cylinder turbine unit comprising a high-pressure cylinder (HPC), two intermediate pressure cylinders (IPC-1 &amp; 2), and a low-pressure cylinder (LPC). The flow path in the new turbine will have active blading in LPC and IPC-1. The information is also presented on the use of the existing foundations, the fact that the overall dimensions of the turbine unit compartment are not changed, the selection of the new turbine type, and the solutions adopted on the basis of this information as to LPC blading, steam admission type, issues associated with thermal displacements, etc.</description><identifier>ISSN: 0040-6015</identifier><identifier>EISSN: 1555-6301</identifier><identifier>DOI: 10.1134/S0040601516110094</identifier><language>eng</language><publisher>Moscow: Pleiades Publishing</publisher><subject>Cogeneration ; Combined-Cycle Plants and Their Auxiliary Equipment ; Customer services ; Cylinders ; Engineering ; Engineering Thermodynamics ; Gas-Turbine ; Heat and Mass Transfer ; Low pressure ; Power plants ; Reconstruction ; Service life ; Steam electric power generation ; Steam flow ; Steam turbines ; Steam-Turbine ; Turbines</subject><ispartof>Thermal engineering, 2016, Vol.63 (11), p.765-770</ispartof><rights>Pleiades Publishing, Inc. 2016</rights><rights>Copyright Springer Science &amp; Business Media 2016</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c2794-2d308bb354bae0c02c43505597773417f230356829a2c498dbc93472952f29943</citedby><cites>FETCH-LOGICAL-c2794-2d308bb354bae0c02c43505597773417f230356829a2c498dbc93472952f29943</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.1134/S0040601516110094$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.1134/S0040601516110094$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,780,784,27924,27925,41488,42557,51319</link.rule.ids></links><search><creatorcontrib>Valamin, A. E.</creatorcontrib><creatorcontrib>Kultyshev, A. Yu</creatorcontrib><creatorcontrib>Shibaev, T. L.</creatorcontrib><creatorcontrib>Gol’dberg, A. A.</creatorcontrib><creatorcontrib>Sakhnin, Yu. A.</creatorcontrib><creatorcontrib>Stepanov, M. Yu</creatorcontrib><creatorcontrib>Bilan, V. N.</creatorcontrib><creatorcontrib>Kadkina, I. V.</creatorcontrib><title>Substantiation of the cogeneration turbine unit selection for reconstruction of power units with a T-250/300-23.5 turbine</title><title>Thermal engineering</title><addtitle>Therm. Eng</addtitle><description>The selection of a cogeneration steam turbine unit (STU) for the reconstruction of power units with a T-250/300-23.5 turbine is substantiated by the example of power unit no. 9 at the cogeneration power station no. 22 (TETs-22) of Mosenergo Company. Series T-250 steam turbines have been developed for combined heat and power generation. A total of 31 turbines were manufactured. By the end of 2015, the total operation time of prototype power units with the T-250/300-23.5 turbine exceeded 290000 hours. Considering the expiry of the service life, the decision was made that the reconstruction of the power unit at st. no. 9 of TETs-22 should be the first priority. The main issues that arose in developing this project—the customer’s requirements and the request for the reconstruction, the view on certain problems of Ural Turbine Works (UTZ) as the manufacturer of the main power unit equipment, and the opinions of other project parties—are examined. The decisions were made with account taken of the experience in operation of all Series T-250 turbines and the results of long-term discussions of pressing problems at scientific and technical councils, meetings, and negotiations. For the new power unit, the following parameters have been set: a live steam pressure of 23.5 MPa and live steam/reheat temperature of 565/565°C. Considering that the boiler equipment will be upgraded, the live steam flow is increased up to 1030 t/h. The reconstruction activities involving the replacement of the existing turbine with a new one will yield a service life of 250000 hours for turbine parts exposed to a temperature of 450°C or higher and 200000 hours for pipeline components. Hence, the decision has been made to reuse the arrangement of the existing turbine: a four-cylinder turbine unit comprising a high-pressure cylinder (HPC), two intermediate pressure cylinders (IPC-1 &amp; 2), and a low-pressure cylinder (LPC). The flow path in the new turbine will have active blading in LPC and IPC-1. The information is also presented on the use of the existing foundations, the fact that the overall dimensions of the turbine unit compartment are not changed, the selection of the new turbine type, and the solutions adopted on the basis of this information as to LPC blading, steam admission type, issues associated with thermal displacements, etc.</description><subject>Cogeneration</subject><subject>Combined-Cycle Plants and Their Auxiliary Equipment</subject><subject>Customer services</subject><subject>Cylinders</subject><subject>Engineering</subject><subject>Engineering Thermodynamics</subject><subject>Gas-Turbine</subject><subject>Heat and Mass Transfer</subject><subject>Low pressure</subject><subject>Power plants</subject><subject>Reconstruction</subject><subject>Service life</subject><subject>Steam electric power generation</subject><subject>Steam flow</subject><subject>Steam turbines</subject><subject>Steam-Turbine</subject><subject>Turbines</subject><issn>0040-6015</issn><issn>1555-6301</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><recordid>eNp1kEtrwzAQhEVpoWnaH9CboGcnq5dtHUvoCwI9JD0bWZETh1RKJZmQf185bqBQelp2Z75ZGITuCUwIYXy6AOCQAxEkJwRA8gs0IkKILGdALtGol7Nev0Y3IWzTyjkRI3RcdHWIysZWxdZZ7BocNwZrtzbW-OEWO1-31uDOthEHszP6dG6cx95oZ0P0nT7Te3cw_mQN-NDGDVZ4mVEBUwaQUTYR57hbdNWoXTB3P3OMPp6flrPXbP7-8jZ7nGeaFpJndMWgrGsmeK0MaKCaMwFCyKIoGCdFQxkwkZdUqiTJclVryXhBpaANlZKzMXoYcvfefXUmxGrrOm_Ty4qUJZQi8ZBcZHBp70Lwpqn2vv1U_lgRqPqGqz8NJ4YOTEheuzb-V_K_0DerJHqv</recordid><startdate>2016</startdate><enddate>2016</enddate><creator>Valamin, A. E.</creator><creator>Kultyshev, A. Yu</creator><creator>Shibaev, T. L.</creator><creator>Gol’dberg, A. A.</creator><creator>Sakhnin, Yu. A.</creator><creator>Stepanov, M. Yu</creator><creator>Bilan, V. N.</creator><creator>Kadkina, I. V.</creator><general>Pleiades Publishing</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>2016</creationdate><title>Substantiation of the cogeneration turbine unit selection for reconstruction of power units with a T-250/300-23.5 turbine</title><author>Valamin, A. E. ; Kultyshev, A. Yu ; Shibaev, T. L. ; Gol’dberg, A. A. ; Sakhnin, Yu. A. ; Stepanov, M. Yu ; Bilan, V. N. ; Kadkina, I. V.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2794-2d308bb354bae0c02c43505597773417f230356829a2c498dbc93472952f29943</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2016</creationdate><topic>Cogeneration</topic><topic>Combined-Cycle Plants and Their Auxiliary Equipment</topic><topic>Customer services</topic><topic>Cylinders</topic><topic>Engineering</topic><topic>Engineering Thermodynamics</topic><topic>Gas-Turbine</topic><topic>Heat and Mass Transfer</topic><topic>Low pressure</topic><topic>Power plants</topic><topic>Reconstruction</topic><topic>Service life</topic><topic>Steam electric power generation</topic><topic>Steam flow</topic><topic>Steam turbines</topic><topic>Steam-Turbine</topic><topic>Turbines</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Valamin, A. E.</creatorcontrib><creatorcontrib>Kultyshev, A. Yu</creatorcontrib><creatorcontrib>Shibaev, T. L.</creatorcontrib><creatorcontrib>Gol’dberg, A. A.</creatorcontrib><creatorcontrib>Sakhnin, Yu. A.</creatorcontrib><creatorcontrib>Stepanov, M. Yu</creatorcontrib><creatorcontrib>Bilan, V. N.</creatorcontrib><creatorcontrib>Kadkina, I. V.</creatorcontrib><collection>CrossRef</collection><jtitle>Thermal engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Valamin, A. E.</au><au>Kultyshev, A. Yu</au><au>Shibaev, T. L.</au><au>Gol’dberg, A. A.</au><au>Sakhnin, Yu. A.</au><au>Stepanov, M. Yu</au><au>Bilan, V. N.</au><au>Kadkina, I. V.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Substantiation of the cogeneration turbine unit selection for reconstruction of power units with a T-250/300-23.5 turbine</atitle><jtitle>Thermal engineering</jtitle><stitle>Therm. Eng</stitle><date>2016</date><risdate>2016</risdate><volume>63</volume><issue>11</issue><spage>765</spage><epage>770</epage><pages>765-770</pages><issn>0040-6015</issn><eissn>1555-6301</eissn><abstract>The selection of a cogeneration steam turbine unit (STU) for the reconstruction of power units with a T-250/300-23.5 turbine is substantiated by the example of power unit no. 9 at the cogeneration power station no. 22 (TETs-22) of Mosenergo Company. Series T-250 steam turbines have been developed for combined heat and power generation. A total of 31 turbines were manufactured. By the end of 2015, the total operation time of prototype power units with the T-250/300-23.5 turbine exceeded 290000 hours. Considering the expiry of the service life, the decision was made that the reconstruction of the power unit at st. no. 9 of TETs-22 should be the first priority. The main issues that arose in developing this project—the customer’s requirements and the request for the reconstruction, the view on certain problems of Ural Turbine Works (UTZ) as the manufacturer of the main power unit equipment, and the opinions of other project parties—are examined. The decisions were made with account taken of the experience in operation of all Series T-250 turbines and the results of long-term discussions of pressing problems at scientific and technical councils, meetings, and negotiations. For the new power unit, the following parameters have been set: a live steam pressure of 23.5 MPa and live steam/reheat temperature of 565/565°C. Considering that the boiler equipment will be upgraded, the live steam flow is increased up to 1030 t/h. The reconstruction activities involving the replacement of the existing turbine with a new one will yield a service life of 250000 hours for turbine parts exposed to a temperature of 450°C or higher and 200000 hours for pipeline components. Hence, the decision has been made to reuse the arrangement of the existing turbine: a four-cylinder turbine unit comprising a high-pressure cylinder (HPC), two intermediate pressure cylinders (IPC-1 &amp; 2), and a low-pressure cylinder (LPC). The flow path in the new turbine will have active blading in LPC and IPC-1. The information is also presented on the use of the existing foundations, the fact that the overall dimensions of the turbine unit compartment are not changed, the selection of the new turbine type, and the solutions adopted on the basis of this information as to LPC blading, steam admission type, issues associated with thermal displacements, etc.</abstract><cop>Moscow</cop><pub>Pleiades Publishing</pub><doi>10.1134/S0040601516110094</doi><tpages>6</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0040-6015
ispartof Thermal engineering, 2016, Vol.63 (11), p.765-770
issn 0040-6015
1555-6301
language eng
recordid cdi_proquest_journals_1880853030
source SpringerNature Journals
subjects Cogeneration
Combined-Cycle Plants and Their Auxiliary Equipment
Customer services
Cylinders
Engineering
Engineering Thermodynamics
Gas-Turbine
Heat and Mass Transfer
Low pressure
Power plants
Reconstruction
Service life
Steam electric power generation
Steam flow
Steam turbines
Steam-Turbine
Turbines
title Substantiation of the cogeneration turbine unit selection for reconstruction of power units with a T-250/300-23.5 turbine
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-21T15%3A37%3A41IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Substantiation%20of%20the%20cogeneration%20turbine%20unit%20selection%20for%20reconstruction%20of%20power%20units%20with%20a%20T-250/300-23.5%20turbine&rft.jtitle=Thermal%20engineering&rft.au=Valamin,%20A.%20E.&rft.date=2016&rft.volume=63&rft.issue=11&rft.spage=765&rft.epage=770&rft.pages=765-770&rft.issn=0040-6015&rft.eissn=1555-6301&rft_id=info:doi/10.1134/S0040601516110094&rft_dat=%3Cproquest_cross%3E1880853030%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1880853030&rft_id=info:pmid/&rfr_iscdi=true