A study of the impact of project classification on project risk indicators

Project risk management is essential for ensuring project success. Current risk management tools lack predictive ability to indicate potential risks before the start of a project. This study was conducted to determine whether or not project classification, which is known at the outset of a project,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of project management 2015-05, Vol.33 (4), p.863-876
Hauptverfasser: Yim, Rachel, Castaneda, Jason, Doolen, Toni, Tumer, Irem, Malak, Richard
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 876
container_issue 4
container_start_page 863
container_title International journal of project management
container_volume 33
creator Yim, Rachel
Castaneda, Jason
Doolen, Toni
Tumer, Irem
Malak, Richard
description Project risk management is essential for ensuring project success. Current risk management tools lack predictive ability to indicate potential risks before the start of a project. This study was conducted to determine whether or not project classification, which is known at the outset of a project, can be used by project managers to proactively identify likely risk events in engineering design projects. This study compared the types of risk events experienced during the project, using risk indicators, when undertaking three different types of projects: compliance, operational, and strategic projects. Risk indicators were developed to capture circumstances (risk events) with potential predictive power about the likelihood of a risk occurring during a given project. Interviews were conducted with employees involved in eleven engineering design projects, within a single organization. Interview notes were transcribed, and risk events were identified and coded using a set of risk indicator codes. Codes were summarized at the project level and compared based on the project classification. The results indicate that the type of risk events occurring in projects does vary based on project classification. Both the type and frequency of risk indicators were found to vary based on project classification. These results suggest that risk management plans can be customized, at the outset of the project based on project classification, which may increase the likelihood of project success. •Risk indicators in eleven different engineering design projects were evaluated.•The projects were classified as compliance, operational, or strategic.•Risk indicators identified in projects within each category were compared.•The most frequently occurring risk indicators varied according to project classification.•The type and prevalence of risk indicators can inform risk management plans.
doi_str_mv 10.1016/j.ijproman.2014.10.005
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_1667027640</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0263786314001628</els_id><sourcerecordid>3637300311</sourcerecordid><originalsourceid>FETCH-LOGICAL-c394t-32a18cd47d7e543d91838cb9aaa2f2ec56d2568f07e49f9d5ae1b2e86da386753</originalsourceid><addsrcrecordid>eNqFUNtKAzEQDaJgrf6CLPi8a-7JvlmKVwq-6HNIkwlmbXdrshX692apPgsDcz1nZg5C1wQ3BBN52zWx26Vha_uGYsJLscFYnKAZ0YrVXDJ-imaYSlYrLdk5usi5w5goLNQMvSyqPO79oRpCNX5AFbc768YpK5QdlNBtbM4xRGfHOPRVsb9Oivmzir2fWkPKl-gs2E2Gq18_R-8P92_Lp3r1-vi8XKxqx1o-1oxaop3nyisQnPmWaKbdurXW0kDBCempkDpgBbwNrRcWyJqClt4yLZVgc3Rz5C13fO0hj6Yb9qkvKw2RUmGqJMdlSh6nXBpyThDMLsWtTQdDsJl0M535081Muk31olsB3h2BUH74jpBMdhF6Bz6m8rXxQ_yP4gdMPHpM</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1667027640</pqid></control><display><type>article</type><title>A study of the impact of project classification on project risk indicators</title><source>Elsevier ScienceDirect Journals Complete - AutoHoldings</source><creator>Yim, Rachel ; Castaneda, Jason ; Doolen, Toni ; Tumer, Irem ; Malak, Richard</creator><creatorcontrib>Yim, Rachel ; Castaneda, Jason ; Doolen, Toni ; Tumer, Irem ; Malak, Richard</creatorcontrib><description>Project risk management is essential for ensuring project success. Current risk management tools lack predictive ability to indicate potential risks before the start of a project. This study was conducted to determine whether or not project classification, which is known at the outset of a project, can be used by project managers to proactively identify likely risk events in engineering design projects. This study compared the types of risk events experienced during the project, using risk indicators, when undertaking three different types of projects: compliance, operational, and strategic projects. Risk indicators were developed to capture circumstances (risk events) with potential predictive power about the likelihood of a risk occurring during a given project. Interviews were conducted with employees involved in eleven engineering design projects, within a single organization. Interview notes were transcribed, and risk events were identified and coded using a set of risk indicator codes. Codes were summarized at the project level and compared based on the project classification. The results indicate that the type of risk events occurring in projects does vary based on project classification. Both the type and frequency of risk indicators were found to vary based on project classification. These results suggest that risk management plans can be customized, at the outset of the project based on project classification, which may increase the likelihood of project success. •Risk indicators in eleven different engineering design projects were evaluated.•The projects were classified as compliance, operational, or strategic.•Risk indicators identified in projects within each category were compared.•The most frequently occurring risk indicators varied according to project classification.•The type and prevalence of risk indicators can inform risk management plans.</description><identifier>ISSN: 0263-7863</identifier><identifier>EISSN: 1873-4634</identifier><identifier>DOI: 10.1016/j.ijproman.2014.10.005</identifier><language>eng</language><publisher>Kidlington: Elsevier Ltd</publisher><subject>Classification ; Comparative studies ; Customization ; Design engineering ; Engineering design ; Project classification ; Project management ; Risk management</subject><ispartof>International journal of project management, 2015-05, Vol.33 (4), p.863-876</ispartof><rights>2014 Elsevier Ltd</rights><rights>Copyright Elsevier Science Ltd. May 2015</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c394t-32a18cd47d7e543d91838cb9aaa2f2ec56d2568f07e49f9d5ae1b2e86da386753</citedby><cites>FETCH-LOGICAL-c394t-32a18cd47d7e543d91838cb9aaa2f2ec56d2568f07e49f9d5ae1b2e86da386753</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.ijproman.2014.10.005$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,780,784,3548,27922,27923,45993</link.rule.ids></links><search><creatorcontrib>Yim, Rachel</creatorcontrib><creatorcontrib>Castaneda, Jason</creatorcontrib><creatorcontrib>Doolen, Toni</creatorcontrib><creatorcontrib>Tumer, Irem</creatorcontrib><creatorcontrib>Malak, Richard</creatorcontrib><title>A study of the impact of project classification on project risk indicators</title><title>International journal of project management</title><description>Project risk management is essential for ensuring project success. Current risk management tools lack predictive ability to indicate potential risks before the start of a project. This study was conducted to determine whether or not project classification, which is known at the outset of a project, can be used by project managers to proactively identify likely risk events in engineering design projects. This study compared the types of risk events experienced during the project, using risk indicators, when undertaking three different types of projects: compliance, operational, and strategic projects. Risk indicators were developed to capture circumstances (risk events) with potential predictive power about the likelihood of a risk occurring during a given project. Interviews were conducted with employees involved in eleven engineering design projects, within a single organization. Interview notes were transcribed, and risk events were identified and coded using a set of risk indicator codes. Codes were summarized at the project level and compared based on the project classification. The results indicate that the type of risk events occurring in projects does vary based on project classification. Both the type and frequency of risk indicators were found to vary based on project classification. These results suggest that risk management plans can be customized, at the outset of the project based on project classification, which may increase the likelihood of project success. •Risk indicators in eleven different engineering design projects were evaluated.•The projects were classified as compliance, operational, or strategic.•Risk indicators identified in projects within each category were compared.•The most frequently occurring risk indicators varied according to project classification.•The type and prevalence of risk indicators can inform risk management plans.</description><subject>Classification</subject><subject>Comparative studies</subject><subject>Customization</subject><subject>Design engineering</subject><subject>Engineering design</subject><subject>Project classification</subject><subject>Project management</subject><subject>Risk management</subject><issn>0263-7863</issn><issn>1873-4634</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNqFUNtKAzEQDaJgrf6CLPi8a-7JvlmKVwq-6HNIkwlmbXdrshX692apPgsDcz1nZg5C1wQ3BBN52zWx26Vha_uGYsJLscFYnKAZ0YrVXDJ-imaYSlYrLdk5usi5w5goLNQMvSyqPO79oRpCNX5AFbc768YpK5QdlNBtbM4xRGfHOPRVsb9Oivmzir2fWkPKl-gs2E2Gq18_R-8P92_Lp3r1-vi8XKxqx1o-1oxaop3nyisQnPmWaKbdurXW0kDBCempkDpgBbwNrRcWyJqClt4yLZVgc3Rz5C13fO0hj6Yb9qkvKw2RUmGqJMdlSh6nXBpyThDMLsWtTQdDsJl0M535081Muk31olsB3h2BUH74jpBMdhF6Bz6m8rXxQ_yP4gdMPHpM</recordid><startdate>201505</startdate><enddate>201505</enddate><creator>Yim, Rachel</creator><creator>Castaneda, Jason</creator><creator>Doolen, Toni</creator><creator>Tumer, Irem</creator><creator>Malak, Richard</creator><general>Elsevier Ltd</general><general>Elsevier Science Ltd</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>8FD</scope><scope>JG9</scope><scope>JQ2</scope></search><sort><creationdate>201505</creationdate><title>A study of the impact of project classification on project risk indicators</title><author>Yim, Rachel ; Castaneda, Jason ; Doolen, Toni ; Tumer, Irem ; Malak, Richard</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c394t-32a18cd47d7e543d91838cb9aaa2f2ec56d2568f07e49f9d5ae1b2e86da386753</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Classification</topic><topic>Comparative studies</topic><topic>Customization</topic><topic>Design engineering</topic><topic>Engineering design</topic><topic>Project classification</topic><topic>Project management</topic><topic>Risk management</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Yim, Rachel</creatorcontrib><creatorcontrib>Castaneda, Jason</creatorcontrib><creatorcontrib>Doolen, Toni</creatorcontrib><creatorcontrib>Tumer, Irem</creatorcontrib><creatorcontrib>Malak, Richard</creatorcontrib><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Technology Research Database</collection><collection>Materials Research Database</collection><collection>ProQuest Computer Science Collection</collection><jtitle>International journal of project management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Yim, Rachel</au><au>Castaneda, Jason</au><au>Doolen, Toni</au><au>Tumer, Irem</au><au>Malak, Richard</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A study of the impact of project classification on project risk indicators</atitle><jtitle>International journal of project management</jtitle><date>2015-05</date><risdate>2015</risdate><volume>33</volume><issue>4</issue><spage>863</spage><epage>876</epage><pages>863-876</pages><issn>0263-7863</issn><eissn>1873-4634</eissn><abstract>Project risk management is essential for ensuring project success. Current risk management tools lack predictive ability to indicate potential risks before the start of a project. This study was conducted to determine whether or not project classification, which is known at the outset of a project, can be used by project managers to proactively identify likely risk events in engineering design projects. This study compared the types of risk events experienced during the project, using risk indicators, when undertaking three different types of projects: compliance, operational, and strategic projects. Risk indicators were developed to capture circumstances (risk events) with potential predictive power about the likelihood of a risk occurring during a given project. Interviews were conducted with employees involved in eleven engineering design projects, within a single organization. Interview notes were transcribed, and risk events were identified and coded using a set of risk indicator codes. Codes were summarized at the project level and compared based on the project classification. The results indicate that the type of risk events occurring in projects does vary based on project classification. Both the type and frequency of risk indicators were found to vary based on project classification. These results suggest that risk management plans can be customized, at the outset of the project based on project classification, which may increase the likelihood of project success. •Risk indicators in eleven different engineering design projects were evaluated.•The projects were classified as compliance, operational, or strategic.•Risk indicators identified in projects within each category were compared.•The most frequently occurring risk indicators varied according to project classification.•The type and prevalence of risk indicators can inform risk management plans.</abstract><cop>Kidlington</cop><pub>Elsevier Ltd</pub><doi>10.1016/j.ijproman.2014.10.005</doi><tpages>14</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0263-7863
ispartof International journal of project management, 2015-05, Vol.33 (4), p.863-876
issn 0263-7863
1873-4634
language eng
recordid cdi_proquest_journals_1667027640
source Elsevier ScienceDirect Journals Complete - AutoHoldings
subjects Classification
Comparative studies
Customization
Design engineering
Engineering design
Project classification
Project management
Risk management
title A study of the impact of project classification on project risk indicators
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-13T18%3A31%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20study%20of%20the%20impact%20of%20project%20classification%20on%20project%20risk%20indicators&rft.jtitle=International%20journal%20of%20project%20management&rft.au=Yim,%20Rachel&rft.date=2015-05&rft.volume=33&rft.issue=4&rft.spage=863&rft.epage=876&rft.pages=863-876&rft.issn=0263-7863&rft.eissn=1873-4634&rft_id=info:doi/10.1016/j.ijproman.2014.10.005&rft_dat=%3Cproquest_cross%3E3637300311%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1667027640&rft_id=info:pmid/&rft_els_id=S0263786314001628&rfr_iscdi=true