Multi-mode resource constrained multi-project scheduling and resource portfolio problem
•A new multi-project environment with resource dedication policy is proposed.•A resource portfolio within budget limit is determined under resource dedication.•Mathematical formulation for this new multi-project environment is presented.•We employ genetic algorithm and combinatorial auction using pr...
Gespeichert in:
Veröffentlicht in: | European journal of operational research 2015-01, Vol.240 (1), p.22-31 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 31 |
---|---|
container_issue | 1 |
container_start_page | 22 |
container_title | European journal of operational research |
container_volume | 240 |
creator | Beşikci, Umut Bilge, Ümit Ulusoy, Gündüz |
description | •A new multi-project environment with resource dedication policy is proposed.•A resource portfolio within budget limit is determined under resource dedication.•Mathematical formulation for this new multi-project environment is presented.•We employ genetic algorithm and combinatorial auction using preference for resources.•Results show proposed solution approaches to be computationally efficient.
This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a total budget. Three issues arise when investigating this multi-project environment. First, the total budget should be distributed among different resource types to determine the general resource capacities, which correspond to the total amount for each renewable resource to be dedicated to the projects. With the general resource capacities at hand, the next issue is to determine the amounts of resources to be dedicated to the individual projects. The dedication of resources reduces the scheduling of the projects’ activities to a multi-mode resource constrained project scheduling problem (MRCPSP) for each individual project. Finally, the last issue is the efficient solution of the resulting MRCPSPs. In this paper, this multi-project environment is modeled in an integrated fashion and designated as the resource portfolio problem. A two-phase and a monolithic genetic algorithm are proposed as two solution approaches, each of which employs a new improvement move designated as the combinatorial auction for resource portfolio and the combinatorial auction for resource dedication. A computational study using test problems demonstrated the effectiveness of the solution approach proposed. |
doi_str_mv | 10.1016/j.ejor.2014.06.025 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_1561481217</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0377221714005281</els_id><sourcerecordid>3430001851</sourcerecordid><originalsourceid>FETCH-LOGICAL-c392t-e978ed73ea95da3c12c75069d56625d0b8265880e121b1e374727ad698da03683</originalsourceid><addsrcrecordid>eNp9kE1LxDAQhoMouK7-AU8Fz62TdPNR8CKLX7DiRfEYssmsprTNmrSC_96sK3jzNId5n3mHh5BzChUFKi7bCtsQKwZ0UYGogPEDMqNKslIoAYdkBrWUJWNUHpOTlFoAoJzyGXl9nLrRl31wWERMYYoWCxuGNEbjB3RF_7PfxtCiHYtk39FNnR_eCjO4P2Ib4rgJnQ9FTq477E_J0cZ0Cc9-55y83N48L-_L1dPdw_J6Vdq6YWOJjVToZI2m4c7UljIrOYjGcSEYd7BWTHClACmja4q1XEgmjRONcgZqoeo5udjfzb0fE6ZRt_mjIVdqygVdqAzKnGL7lI0hpYgbvY2-N_FLU9A7gbrVO4F6J1CD0Flghq72EOb_Pz1GnazHwaLzMbvQLvj_8G93TXoY</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1561481217</pqid></control><display><type>article</type><title>Multi-mode resource constrained multi-project scheduling and resource portfolio problem</title><source>Elsevier ScienceDirect Journals Complete</source><creator>Beşikci, Umut ; Bilge, Ümit ; Ulusoy, Gündüz</creator><creatorcontrib>Beşikci, Umut ; Bilge, Ümit ; Ulusoy, Gündüz</creatorcontrib><description>•A new multi-project environment with resource dedication policy is proposed.•A resource portfolio within budget limit is determined under resource dedication.•Mathematical formulation for this new multi-project environment is presented.•We employ genetic algorithm and combinatorial auction using preference for resources.•Results show proposed solution approaches to be computationally efficient.
This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a total budget. Three issues arise when investigating this multi-project environment. First, the total budget should be distributed among different resource types to determine the general resource capacities, which correspond to the total amount for each renewable resource to be dedicated to the projects. With the general resource capacities at hand, the next issue is to determine the amounts of resources to be dedicated to the individual projects. The dedication of resources reduces the scheduling of the projects’ activities to a multi-mode resource constrained project scheduling problem (MRCPSP) for each individual project. Finally, the last issue is the efficient solution of the resulting MRCPSPs. In this paper, this multi-project environment is modeled in an integrated fashion and designated as the resource portfolio problem. A two-phase and a monolithic genetic algorithm are proposed as two solution approaches, each of which employs a new improvement move designated as the combinatorial auction for resource portfolio and the combinatorial auction for resource dedication. A computational study using test problems demonstrated the effectiveness of the solution approach proposed.</description><identifier>ISSN: 0377-2217</identifier><identifier>EISSN: 1872-6860</identifier><identifier>DOI: 10.1016/j.ejor.2014.06.025</identifier><identifier>CODEN: EJORDT</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Assignment problem ; Auctions ; Effectiveness studies ; Genetic algorithms ; Multi-project scheduling ; Project management ; Project scheduling ; Resource allocation ; Resource dedication ; Resource portfolio problem ; Resource preference</subject><ispartof>European journal of operational research, 2015-01, Vol.240 (1), p.22-31</ispartof><rights>2014 Elsevier B.V.</rights><rights>Copyright Elsevier Sequoia S.A. Jan 1, 2015</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c392t-e978ed73ea95da3c12c75069d56625d0b8265880e121b1e374727ad698da03683</citedby><cites>FETCH-LOGICAL-c392t-e978ed73ea95da3c12c75069d56625d0b8265880e121b1e374727ad698da03683</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0377221714005281$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27901,27902,65534</link.rule.ids></links><search><creatorcontrib>Beşikci, Umut</creatorcontrib><creatorcontrib>Bilge, Ümit</creatorcontrib><creatorcontrib>Ulusoy, Gündüz</creatorcontrib><title>Multi-mode resource constrained multi-project scheduling and resource portfolio problem</title><title>European journal of operational research</title><description>•A new multi-project environment with resource dedication policy is proposed.•A resource portfolio within budget limit is determined under resource dedication.•Mathematical formulation for this new multi-project environment is presented.•We employ genetic algorithm and combinatorial auction using preference for resources.•Results show proposed solution approaches to be computationally efficient.
This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a total budget. Three issues arise when investigating this multi-project environment. First, the total budget should be distributed among different resource types to determine the general resource capacities, which correspond to the total amount for each renewable resource to be dedicated to the projects. With the general resource capacities at hand, the next issue is to determine the amounts of resources to be dedicated to the individual projects. The dedication of resources reduces the scheduling of the projects’ activities to a multi-mode resource constrained project scheduling problem (MRCPSP) for each individual project. Finally, the last issue is the efficient solution of the resulting MRCPSPs. In this paper, this multi-project environment is modeled in an integrated fashion and designated as the resource portfolio problem. A two-phase and a monolithic genetic algorithm are proposed as two solution approaches, each of which employs a new improvement move designated as the combinatorial auction for resource portfolio and the combinatorial auction for resource dedication. A computational study using test problems demonstrated the effectiveness of the solution approach proposed.</description><subject>Assignment problem</subject><subject>Auctions</subject><subject>Effectiveness studies</subject><subject>Genetic algorithms</subject><subject>Multi-project scheduling</subject><subject>Project management</subject><subject>Project scheduling</subject><subject>Resource allocation</subject><subject>Resource dedication</subject><subject>Resource portfolio problem</subject><subject>Resource preference</subject><issn>0377-2217</issn><issn>1872-6860</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNp9kE1LxDAQhoMouK7-AU8Fz62TdPNR8CKLX7DiRfEYssmsprTNmrSC_96sK3jzNId5n3mHh5BzChUFKi7bCtsQKwZ0UYGogPEDMqNKslIoAYdkBrWUJWNUHpOTlFoAoJzyGXl9nLrRl31wWERMYYoWCxuGNEbjB3RF_7PfxtCiHYtk39FNnR_eCjO4P2Ib4rgJnQ9FTq477E_J0cZ0Cc9-55y83N48L-_L1dPdw_J6Vdq6YWOJjVToZI2m4c7UljIrOYjGcSEYd7BWTHClACmja4q1XEgmjRONcgZqoeo5udjfzb0fE6ZRt_mjIVdqygVdqAzKnGL7lI0hpYgbvY2-N_FLU9A7gbrVO4F6J1CD0Flghq72EOb_Pz1GnazHwaLzMbvQLvj_8G93TXoY</recordid><startdate>20150101</startdate><enddate>20150101</enddate><creator>Beşikci, Umut</creator><creator>Bilge, Ümit</creator><creator>Ulusoy, Gündüz</creator><general>Elsevier B.V</general><general>Elsevier Sequoia S.A</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope></search><sort><creationdate>20150101</creationdate><title>Multi-mode resource constrained multi-project scheduling and resource portfolio problem</title><author>Beşikci, Umut ; Bilge, Ümit ; Ulusoy, Gündüz</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c392t-e978ed73ea95da3c12c75069d56625d0b8265880e121b1e374727ad698da03683</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Assignment problem</topic><topic>Auctions</topic><topic>Effectiveness studies</topic><topic>Genetic algorithms</topic><topic>Multi-project scheduling</topic><topic>Project management</topic><topic>Project scheduling</topic><topic>Resource allocation</topic><topic>Resource dedication</topic><topic>Resource portfolio problem</topic><topic>Resource preference</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Beşikci, Umut</creatorcontrib><creatorcontrib>Bilge, Ümit</creatorcontrib><creatorcontrib>Ulusoy, Gündüz</creatorcontrib><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>European journal of operational research</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Beşikci, Umut</au><au>Bilge, Ümit</au><au>Ulusoy, Gündüz</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Multi-mode resource constrained multi-project scheduling and resource portfolio problem</atitle><jtitle>European journal of operational research</jtitle><date>2015-01-01</date><risdate>2015</risdate><volume>240</volume><issue>1</issue><spage>22</spage><epage>31</epage><pages>22-31</pages><issn>0377-2217</issn><eissn>1872-6860</eissn><coden>EJORDT</coden><abstract>•A new multi-project environment with resource dedication policy is proposed.•A resource portfolio within budget limit is determined under resource dedication.•Mathematical formulation for this new multi-project environment is presented.•We employ genetic algorithm and combinatorial auction using preference for resources.•Results show proposed solution approaches to be computationally efficient.
This paper introduces a multi-project problem environment which involves multiple projects with assigned due dates; activities that have alternative resource usage modes; a resource dedication policy that does not allow sharing of resources among projects throughout the planning horizon; and a total budget. Three issues arise when investigating this multi-project environment. First, the total budget should be distributed among different resource types to determine the general resource capacities, which correspond to the total amount for each renewable resource to be dedicated to the projects. With the general resource capacities at hand, the next issue is to determine the amounts of resources to be dedicated to the individual projects. The dedication of resources reduces the scheduling of the projects’ activities to a multi-mode resource constrained project scheduling problem (MRCPSP) for each individual project. Finally, the last issue is the efficient solution of the resulting MRCPSPs. In this paper, this multi-project environment is modeled in an integrated fashion and designated as the resource portfolio problem. A two-phase and a monolithic genetic algorithm are proposed as two solution approaches, each of which employs a new improvement move designated as the combinatorial auction for resource portfolio and the combinatorial auction for resource dedication. A computational study using test problems demonstrated the effectiveness of the solution approach proposed.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/j.ejor.2014.06.025</doi><tpages>10</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0377-2217 |
ispartof | European journal of operational research, 2015-01, Vol.240 (1), p.22-31 |
issn | 0377-2217 1872-6860 |
language | eng |
recordid | cdi_proquest_journals_1561481217 |
source | Elsevier ScienceDirect Journals Complete |
subjects | Assignment problem Auctions Effectiveness studies Genetic algorithms Multi-project scheduling Project management Project scheduling Resource allocation Resource dedication Resource portfolio problem Resource preference |
title | Multi-mode resource constrained multi-project scheduling and resource portfolio problem |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-15T17%3A31%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Multi-mode%20resource%20constrained%20multi-project%20scheduling%20and%20resource%20portfolio%20problem&rft.jtitle=European%20journal%20of%20operational%20research&rft.au=Be%C5%9Fikci,%20Umut&rft.date=2015-01-01&rft.volume=240&rft.issue=1&rft.spage=22&rft.epage=31&rft.pages=22-31&rft.issn=0377-2217&rft.eissn=1872-6860&rft.coden=EJORDT&rft_id=info:doi/10.1016/j.ejor.2014.06.025&rft_dat=%3Cproquest_cross%3E3430001851%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1561481217&rft_id=info:pmid/&rft_els_id=S0377221714005281&rfr_iscdi=true |