A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem
This paper presents a study on the two-stage assembly flow shop scheduling problem for minimising the weighed sum of maximum makespan, earliness and lateness. There are m machines at the first stage, each of which produces a component of a job. A single machine at the second stage assembles the m co...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2014-01, Vol.52 (19), p.5626-5639 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!