A hybrid electromagnetism-like algorithm for two-stage assembly flow shop scheduling problem

This paper presents a study on the two-stage assembly flow shop scheduling problem for minimising the weighed sum of maximum makespan, earliness and lateness. There are m machines at the first stage, each of which produces a component of a job. A single machine at the second stage assembles the m co...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 2014-01, Vol.52 (19), p.5626-5639
Hauptverfasser: Yan, Hong-Sen, Wan, Xiao-Qin, Xiong, Fu-Li
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!