Improvements in sintering

Sintering machine 1 at OAO Zaporozhstal’ has been reconstructed with increase in the sintering area from 62.5 to 75 m 2 . A vibrational screening system ensures that the content of the −5 mm fraction in skip sinter is 10.1–11.5%. The gas-purification equipment is reconstructed, with the introduction...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Steel in translation 2013-10, Vol.43 (10), p.656-657
Hauptverfasser: Ashikhmin, V. D., Ilyukhin, A. Ya, Shibko, V. G., Popkov, I. N.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!