Status of the KSTAR Project

The KSTAR project was started in 1996 and conducted in three phases, the conceptual design phase (1996-1998), the R&D and engineering design phase (1998-2002), and the construction phase (2002-2007). The mission of the Korea Superconducting Tokamak Advanced Research (KSTAR) Project is to develop...