Design and Preliminary Performance of the New Injection Shift Bump Power Supply at the J-PARC 3-GeV RCS

A new power supply for the injection shift bump magnet at the Japan Proton Accelerator Research Complex 3-GeV Rapid Cycling Synchrotron has been designed with the energy upgrading of the linear accelerator to 400 MeV. The power supply is required to output the maximum current of 32 kA, which is 1.6...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on applied superconductivity 2014-06, Vol.24 (3), p.1-4
Hauptverfasser: Takayanagi, T., Hayashi, N., Kinsho, M., Ueno, T., Togashi, T., Horino, K., Irie, Y.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!