Testing a 110 kV external gas pressure cable to evaluate continued operational reliability

After several disruptive discharges during operation of an external gas pressure cable manufactured in 1953, it was decided to investigate the causes of these failures in the laboratory. At the same time, the opportunity was taken to apply various methods of diagnosis that have been developed for ev...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: BACH, R, ZINBURG, E
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!