Improving Multi-agent Based Scheduling by Neurodynamic Programming
Scheduling problems, e.g., a job-shop scheduling, are classical NP-hard problems. In the paper a two level adaptation method is proposed to solve the scheduling problem in a dynamically changing and uncertain environment. It is applied to the heterarchical multi-agent architecture developed by Valck...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Buchkapitel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!