Synchronized phasor measurements of a power system event

The paper describes one of the first field measurements of positive sequence voltage phasors at key system buses during a switching operation at Plant Scherer of the Georgia Power Company. The phasor measurements were synchronized using time transmissions from the Global Positioning System (GPS) sat...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power systems 1994-08, Vol.9 (3), p.1643-1650
Hauptverfasser: Burnett, R.O., Butts, M.M., Cease, T.W., Centeno, V., Michel, G., Murphy, R.J., Phadke, A.G.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The paper describes one of the first field measurements of positive sequence voltage phasors at key system buses during a switching operation at Plant Scherer of the Georgia Power Company. The phasor measurements were synchronized using time transmissions from the Global Positioning System (GPS) satellites. The data show the first ever observation of power swings recorded via synchronized phasors at several points on an integrated power network. Measurements were made on the Georgia Power Company (GPC) system, the Florida Power and Light (FPL) system, and on the Tennessee Valley Authority (TVA) system. The disturbance was also simulated on a stability program. Results of the simulation, and a comparison with the observed field data are also included.< >
ISSN:0885-8950
1558-0679
DOI:10.1109/59.336093