Engineering tests during the initial operation of the peach bottom HTGR

The initial power operation of the Peach Bottom Atomic Power Station was programmed as a series of physics, engineering and chemistry tests. These were performed in the first half of 1967 and were successful in bringing the reactor to full power in carefully measured stages which assured both safety...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear engineering and design 1968-01, Vol.7 (4), p.297-311
Hauptverfasser: Kantor, M.E., Menzel, H.F., Schlicht, R.W.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 311
container_issue 4
container_start_page 297
container_title Nuclear engineering and design
container_volume 7
creator Kantor, M.E.
Menzel, H.F.
Schlicht, R.W.
description The initial power operation of the Peach Bottom Atomic Power Station was programmed as a series of physics, engineering and chemistry tests. These were performed in the first half of 1967 and were successful in bringing the reactor to full power in carefully measured stages which assured both safety and complete verification of earlier design predictions. The steam generators required modifications during these tests but successfully produced design capacity at the design steam conditions of 1000°F at 1450 psig. The plant controls met design requirements of controlling these values closely at steady state and at load change rates of up to three per cent per minute, with the reactor and steam generators following turbine load demand. Plant safety actions (scram, setback, loop isolation) were also tested and proved to be much gentler than originally predicted. The overall plant produced a maximum of 44.5 MW(e) gross (40.0 MW(e) net) with a maximum measured efficiency of 38.7% gross (34.7% net), believed to be the highest nuclear power plant performance yet achieved. Main coolant gaseous activity has remained well below 1 Curie total and all the chemical impurities are well below design limits; less than 10 ppm total oxidants. Power production continued through 1967 with periodic testing and maintenance operations requiring occassional shutdowns.
doi_str_mv 10.1016/0029-5493(68)90063-0
format Article
fullrecord <record><control><sourceid>elsevier_osti_</sourceid><recordid>TN_cdi_osti_scitechconnect_4527907</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>0029549368900630</els_id><sourcerecordid>0029549368900630</sourcerecordid><originalsourceid>FETCH-LOGICAL-c333t-6e3a77c849fff054dbef172964156285318db90454fab6ce20fb4cf63ee36d8a3</originalsourceid><addsrcrecordid>eNp9kMFKAzEQhoMoWKtv4CF40sNqsslmNxdBSm2FgiAVvIVsdtJG2qQkUfDt2-2KR-cyDPPPB_MhdE3JPSVUPBBSyqLikt2K5k4SIlhBTtCINnVZ1JX8OEWjv8g5ukjpk_QlyxGaTf3KeYDo_ApnSDnh7msY1oCdd9npDQ47iDq74HGwx8UOtFnjNuQctni-nL1dojOrNwmufvsYvT9Pl5N5sXidvUyeFoVhjOVCANN1bRourbWk4l0LltalFJxWomwqRpuulYRX3OpWGCiJbbmxggEw0TWajdHNwA0pO5WMy2DWJngPJitelbUk9SHEh5CJIaUIVu2i2-r4oyhRvTHV61C9DiUadTSmyOHscTiDwwPfDmLPB2-gc7HHd8H9D9gDDaBx-w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Engineering tests during the initial operation of the peach bottom HTGR</title><source>Access via ScienceDirect (Elsevier)</source><creator>Kantor, M.E. ; Menzel, H.F. ; Schlicht, R.W.</creator><creatorcontrib>Kantor, M.E. ; Menzel, H.F. ; Schlicht, R.W. ; Gulf General Atomic Inc., San Diego, Calif</creatorcontrib><description>The initial power operation of the Peach Bottom Atomic Power Station was programmed as a series of physics, engineering and chemistry tests. These were performed in the first half of 1967 and were successful in bringing the reactor to full power in carefully measured stages which assured both safety and complete verification of earlier design predictions. The steam generators required modifications during these tests but successfully produced design capacity at the design steam conditions of 1000°F at 1450 psig. The plant controls met design requirements of controlling these values closely at steady state and at load change rates of up to three per cent per minute, with the reactor and steam generators following turbine load demand. Plant safety actions (scram, setback, loop isolation) were also tested and proved to be much gentler than originally predicted. The overall plant produced a maximum of 44.5 MW(e) gross (40.0 MW(e) net) with a maximum measured efficiency of 38.7% gross (34.7% net), believed to be the highest nuclear power plant performance yet achieved. Main coolant gaseous activity has remained well below 1 Curie total and all the chemical impurities are well below design limits; less than 10 ppm total oxidants. Power production continued through 1967 with periodic testing and maintenance operations requiring occassional shutdowns.</description><identifier>ISSN: 0029-5493</identifier><identifier>EISSN: 1872-759X</identifier><identifier>DOI: 10.1016/0029-5493(68)90063-0</identifier><language>eng</language><publisher>United States: Elsevier B.V</publisher><subject>BOILERS/performance during startup of Peach Bottom Power Reactor, Unit 1 ; GENERATORS ; HTGR ; MEASUREMENT ; N38100 -Power Reactor Development ; PEACH BOTTOM POWER REACTOR, UNIT 1/dynamics response during startup of, plant ; PEACH BOTTOM POWER REACTOR, UNIT 1/startup of, description of physics and engineering measurements during ; POWER PLANTS ; REACTORS ; SENSITIVITY ; STARTUP ; STEAM ; TESTING</subject><ispartof>Nuclear engineering and design, 1968-01, Vol.7 (4), p.297-311</ispartof><rights>1968</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c333t-6e3a77c849fff054dbef172964156285318db90454fab6ce20fb4cf63ee36d8a3</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/0029-5493(68)90063-0$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>230,314,780,784,885,3550,27924,27925,45995</link.rule.ids><backlink>$$Uhttps://www.osti.gov/biblio/4527907$$D View this record in Osti.gov$$Hfree_for_read</backlink></links><search><creatorcontrib>Kantor, M.E.</creatorcontrib><creatorcontrib>Menzel, H.F.</creatorcontrib><creatorcontrib>Schlicht, R.W.</creatorcontrib><creatorcontrib>Gulf General Atomic Inc., San Diego, Calif</creatorcontrib><title>Engineering tests during the initial operation of the peach bottom HTGR</title><title>Nuclear engineering and design</title><description>The initial power operation of the Peach Bottom Atomic Power Station was programmed as a series of physics, engineering and chemistry tests. These were performed in the first half of 1967 and were successful in bringing the reactor to full power in carefully measured stages which assured both safety and complete verification of earlier design predictions. The steam generators required modifications during these tests but successfully produced design capacity at the design steam conditions of 1000°F at 1450 psig. The plant controls met design requirements of controlling these values closely at steady state and at load change rates of up to three per cent per minute, with the reactor and steam generators following turbine load demand. Plant safety actions (scram, setback, loop isolation) were also tested and proved to be much gentler than originally predicted. The overall plant produced a maximum of 44.5 MW(e) gross (40.0 MW(e) net) with a maximum measured efficiency of 38.7% gross (34.7% net), believed to be the highest nuclear power plant performance yet achieved. Main coolant gaseous activity has remained well below 1 Curie total and all the chemical impurities are well below design limits; less than 10 ppm total oxidants. Power production continued through 1967 with periodic testing and maintenance operations requiring occassional shutdowns.</description><subject>BOILERS/performance during startup of Peach Bottom Power Reactor, Unit 1</subject><subject>GENERATORS</subject><subject>HTGR</subject><subject>MEASUREMENT</subject><subject>N38100 -Power Reactor Development</subject><subject>PEACH BOTTOM POWER REACTOR, UNIT 1/dynamics response during startup of, plant</subject><subject>PEACH BOTTOM POWER REACTOR, UNIT 1/startup of, description of physics and engineering measurements during</subject><subject>POWER PLANTS</subject><subject>REACTORS</subject><subject>SENSITIVITY</subject><subject>STARTUP</subject><subject>STEAM</subject><subject>TESTING</subject><issn>0029-5493</issn><issn>1872-759X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1968</creationdate><recordtype>article</recordtype><recordid>eNp9kMFKAzEQhoMoWKtv4CF40sNqsslmNxdBSm2FgiAVvIVsdtJG2qQkUfDt2-2KR-cyDPPPB_MhdE3JPSVUPBBSyqLikt2K5k4SIlhBTtCINnVZ1JX8OEWjv8g5ukjpk_QlyxGaTf3KeYDo_ApnSDnh7msY1oCdd9npDQ47iDq74HGwx8UOtFnjNuQctni-nL1dojOrNwmufvsYvT9Pl5N5sXidvUyeFoVhjOVCANN1bRourbWk4l0LltalFJxWomwqRpuulYRX3OpWGCiJbbmxggEw0TWajdHNwA0pO5WMy2DWJngPJitelbUk9SHEh5CJIaUIVu2i2-r4oyhRvTHV61C9DiUadTSmyOHscTiDwwPfDmLPB2-gc7HHd8H9D9gDDaBx-w</recordid><startdate>19680101</startdate><enddate>19680101</enddate><creator>Kantor, M.E.</creator><creator>Menzel, H.F.</creator><creator>Schlicht, R.W.</creator><general>Elsevier B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>OTOTI</scope></search><sort><creationdate>19680101</creationdate><title>Engineering tests during the initial operation of the peach bottom HTGR</title><author>Kantor, M.E. ; Menzel, H.F. ; Schlicht, R.W.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c333t-6e3a77c849fff054dbef172964156285318db90454fab6ce20fb4cf63ee36d8a3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1968</creationdate><topic>BOILERS/performance during startup of Peach Bottom Power Reactor, Unit 1</topic><topic>GENERATORS</topic><topic>HTGR</topic><topic>MEASUREMENT</topic><topic>N38100 -Power Reactor Development</topic><topic>PEACH BOTTOM POWER REACTOR, UNIT 1/dynamics response during startup of, plant</topic><topic>PEACH BOTTOM POWER REACTOR, UNIT 1/startup of, description of physics and engineering measurements during</topic><topic>POWER PLANTS</topic><topic>REACTORS</topic><topic>SENSITIVITY</topic><topic>STARTUP</topic><topic>STEAM</topic><topic>TESTING</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kantor, M.E.</creatorcontrib><creatorcontrib>Menzel, H.F.</creatorcontrib><creatorcontrib>Schlicht, R.W.</creatorcontrib><creatorcontrib>Gulf General Atomic Inc., San Diego, Calif</creatorcontrib><collection>CrossRef</collection><collection>OSTI.GOV</collection><jtitle>Nuclear engineering and design</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Kantor, M.E.</au><au>Menzel, H.F.</au><au>Schlicht, R.W.</au><aucorp>Gulf General Atomic Inc., San Diego, Calif</aucorp><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Engineering tests during the initial operation of the peach bottom HTGR</atitle><jtitle>Nuclear engineering and design</jtitle><date>1968-01-01</date><risdate>1968</risdate><volume>7</volume><issue>4</issue><spage>297</spage><epage>311</epage><pages>297-311</pages><issn>0029-5493</issn><eissn>1872-759X</eissn><abstract>The initial power operation of the Peach Bottom Atomic Power Station was programmed as a series of physics, engineering and chemistry tests. These were performed in the first half of 1967 and were successful in bringing the reactor to full power in carefully measured stages which assured both safety and complete verification of earlier design predictions. The steam generators required modifications during these tests but successfully produced design capacity at the design steam conditions of 1000°F at 1450 psig. The plant controls met design requirements of controlling these values closely at steady state and at load change rates of up to three per cent per minute, with the reactor and steam generators following turbine load demand. Plant safety actions (scram, setback, loop isolation) were also tested and proved to be much gentler than originally predicted. The overall plant produced a maximum of 44.5 MW(e) gross (40.0 MW(e) net) with a maximum measured efficiency of 38.7% gross (34.7% net), believed to be the highest nuclear power plant performance yet achieved. Main coolant gaseous activity has remained well below 1 Curie total and all the chemical impurities are well below design limits; less than 10 ppm total oxidants. Power production continued through 1967 with periodic testing and maintenance operations requiring occassional shutdowns.</abstract><cop>United States</cop><pub>Elsevier B.V</pub><doi>10.1016/0029-5493(68)90063-0</doi><tpages>15</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0029-5493
ispartof Nuclear engineering and design, 1968-01, Vol.7 (4), p.297-311
issn 0029-5493
1872-759X
language eng
recordid cdi_osti_scitechconnect_4527907
source Access via ScienceDirect (Elsevier)
subjects BOILERS/performance during startup of Peach Bottom Power Reactor, Unit 1
GENERATORS
HTGR
MEASUREMENT
N38100 -Power Reactor Development
PEACH BOTTOM POWER REACTOR, UNIT 1/dynamics response during startup of, plant
PEACH BOTTOM POWER REACTOR, UNIT 1/startup of, description of physics and engineering measurements during
POWER PLANTS
REACTORS
SENSITIVITY
STARTUP
STEAM
TESTING
title Engineering tests during the initial operation of the peach bottom HTGR
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T23%3A37%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-elsevier_osti_&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Engineering%20tests%20during%20the%20initial%20operation%20of%20the%20peach%20bottom%20HTGR&rft.jtitle=Nuclear%20engineering%20and%20design&rft.au=Kantor,%20M.E.&rft.aucorp=Gulf%20General%20Atomic%20Inc.,%20San%20Diego,%20Calif&rft.date=1968-01-01&rft.volume=7&rft.issue=4&rft.spage=297&rft.epage=311&rft.pages=297-311&rft.issn=0029-5493&rft.eissn=1872-759X&rft_id=info:doi/10.1016/0029-5493(68)90063-0&rft_dat=%3Celsevier_osti_%3E0029549368900630%3C/elsevier_osti_%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_els_id=0029549368900630&rfr_iscdi=true