Progress of the commissioning of the DELTA storage ring FEL facility

This paper will present the status of the ongoing commissioning of the DELTA storage-ring FEL facility. The commissioning of the LINAC started in autumn `94. The operation of the booster started in spring `95, the first stored beam was achieved end of march `95. During the summer of `95 the commissi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 1996-06, Vol.375 (1), p.ABS48-ABS50
Hauptverfasser: Noelle, D., Geisler, A., Ridder, M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper will present the status of the ongoing commissioning of the DELTA storage-ring FEL facility. The commissioning of the LINAC started in autumn `94. The operation of the booster started in spring `95, the first stored beam was achieved end of march `95. During the summer of `95 the commissioning of the main storage ring will be started. Simultaneously, the first FEL FELICTA I was built. All FEL hardware is in house, the undulator is already mounted in the storage-ring. Thus first operation of the undulator with electron beam, will take place immediately after the first stored beam in DELTA. Therefore, first spontanous photons are to be expected in late summer `95. As soon as DELTA provides stable and rather reliable operation the experiments on FELICITA I will start. 16 mA total average current in DELTA at 500 MeV should be sufficient to reach the laser threshold in the FEL mode of FELICITA I. Operating the device as an optical klystron should result in lasing at substantial less currents.
ISSN:0168-9002
1872-9576
DOI:10.1016/0168-9002(96)00142-8